This section isCase study
His Highness Sheikh Khalifa Bin Zayed Al Nahyan Bridge

View from above.
In 2010 the annual rainy season in Pakistan caused great devastation and damage to vital infrastructure. The Swat Valley in the Khyber-Pakhtunkhwa province was badly affected, and a multi span concrete slab deck bridge over the River Swat near the town of Barikot was severely damaged, leaving only one short span in place. Due to the importance of the bridge as a key supply route, a rapid replacement was essential.
The Mabey Delta Bridge was selected for speed of installation and for its full highway load capability. The structure is fully galvanised to ensure a long design life with minimal maintenance.
finished bridge is a permanent, two-lane structure with an external pedestrian footwalk. The overall length of the bridge is 328.5m, divided into five spans of around 65m each.

View from the front.

Launching the bridge with nose attached.
Contact
Website
Company details
Incorporated
08 October 2001
Industry
Construction