Mining Communities in Greenland

Our engineers install incinerators all over the world!
Due to these seasonal conditions in Greenland, the project teams have a limited amount of time in which they can be operational, INCINER8 can ship and install large scale incinerators to remote locations to fit around the demanding environment and limited timescales that the mining project teams can face. The teams can then move into their camps where they will live for months at a time, with a robust solution to dispose of any municipal waste and their hazardous work materials in the safest way possible.
In the mining industry there are strict legislations in place in regard to waste disposal. INCINER8 works closely with the team to establish the specific needs and requirements ensuring that the most suitable solution is found.
The model supplied for this project, the i8-20S, has the benefit of being able to burn a wide variety of materials in the one solution, due to its top loading design. It is small and easy to maintain which makes it perfect for operations such as this.

Mining camp with our containerised incinerator installed