Description

The slab track of the double-track electrified SFS 6185 is to be renovated over a total of approx. 53 kilometers. This involves 3 sections.
The overall contract will be awarded in 2 lots:

// LOS 1: Slab track West Nahrstedt - Gardelegen (26.3 km) from km 215.5 - km 241.4
- Traffic facilities:
Demolition: 2x approx. 25.9km FF; transition areas FF-SchO; 9 turnouts (FF) // Disposal: Superstructure (FF & SchO); civil engineering and underground cable construction // New construction: 2x approx. 25.9km FF; transition areas FF-SchO; 6 points (FF); tamping work on points and tracks // Civil engineering and underground cable construction work
- Electrical installations:
Dismantling of 2 EWHA // New construction of 3 EWHA
- Telecommunications:
Dismantling of existing systems (FO and CU cable systems) approx. 3 km // Construction of FO and CU cable systems (final state) approx. 3 km
- LST:
Dismantling, new construction or temporary installations of/in ESTWs or neighboring operating stations
- OLA:
Minor correlation measures
- LBP measures
- Planning services

// LOS 2 (section a): Slab track east Wuster Damm - Schönhausen West (10.9 km) from km 183.3 - km 193.8:
- Traffic facilities
Demolition: 2x approx. 10.5km FF; transition areas FF-SchO; 4 turnouts (FF) // Disposal: Superstructure (FF & SchO); civil engineering and underground cable construction // New construction: 2x approx. 10.5km FF; transition areas FF-SchO; 3 points (FF); tamping work on points and tracks // Civil engineering and underground cable construction work
- Electrical installations:
New construction of 1 EWHA
- Telecommunications:
Dismantling of existing systems (fiber optic or CU cable system) approx. 8 km // Construction & dismantling of fiber optic and CU cable systems (construction stage) approx. 3.2 km // Construction of fiber optic and CU cable systems (final stage) approx. 8.6 km
- LST:
Dismantling, new construction or temporary installations of/in ESTWs or neighboring operating stations
- OLA:
Minor correlation measures
- LBP measures
- Planning services

// LOS 2 (section b): Slab track east - additional 16km junction Bamme to Wuster Damm from km 166.1 - km 183.3
- Traffic facilities
Dismantling: 2x approx. 16km FF; 6 switches (FF) // New construction: 2x approx. 16km FF; 6 switches (FF) // Adaptation of track bed and drainage systems
- Electrical installations:
Adaptation measures, where necessary
- Telecommunications:
Adaptation measures, where necessary
- LST:
Adaptation measures, if necessary
- OLA:
Adaptation measures, if necessary
- Planning services

As part of this measure, the existing superstructure is to be renewed in all 3 sections.

Opportunity closing date
08 January 2025
Value of contract
to be confirmed

About the buyer

Address
DB InfraGO AG ? Geschäftsbereich Fahrweg (Bukr 16)

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?