United States - Valve,ball
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 20 June 2024
- Opportunity publication date
- 03 June 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
View Changes CONTACT INFORMATION|4|N743.5|TBD|7176053229|JOEL.J.CURTIS.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |NA|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|NA|NA|N39040 - Certifications|NA|NA|SE
E DD 1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5||||||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|332919|750 EMPLOYEES||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
This amendment is issued to extend closing date to 20 Jun 2024 and for an increase in QTY.
Closing date extended to 20 May 2024. Delivery changed to 600 days.
Data Item A001 (inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mech.
2.Drawings associated with this solicitation will be made available on the new beta.SAM website, but will be restricted access which needs tobe approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform
them of the request.
3. This is a rated order certified for national defense use,and the Contractor will follow all the requirements ofthe Defense Priorities and Allocations Systemregulation (15 CFR 700).
4. This solicitation isand resultign award will bee issued IAW EAF.
5. This effort may require access to confidential drawings. If access is required a facility clearance (DD254) will be required upon award. The award of this solicitation will not be delayed to facilitate facility clearance. If classified drawings areto be
requested, this request must be made within 15 days of closing date of solicitation. Award will not be delayed to facilitate the delivery of classified drawings passed thatdate.
\
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.3 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;845-4640418, Confidential;
DRAWING DATA=2621-625-03 |96169|AL| |D|0001 |AL|49998|0110011
DRAWING DATA=2621-625-03 |96169|AL| |D|0001.1.1 | R|49998|0105307
DRAWING DATA=2621-625-03 |96169|AL| |D|0002 | F|49998|0087449
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.1 | N|49998|0107282
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.2 | S|49998|0079553
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.3 | V|49998|0078581
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.4 |AC|49998|0088927
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.5 |AK|49998|0088342
DRAWING DATA=2621-625-03 |96169|AL| |D|0002.6 |AL|49998|0027433
DRAWING DATA=2621-625-03 |96169|AL| |D|0003 |AL|49998|0133653
DRAWING DATA=2621-625-03 |96169|AL| |D|0003.1 |AC|49998|0102806
DRAWING DATA=2621-625-03 |96169|AL| |D|0003.2 |AH|49998|0083381
DRAWING DATA=2621-625-03 |96169|AL| |D|0003.3 |AL|49998|0062196
DRAWING DATA=2621-625-03 |96169|AL| |D|0004 | T|49998|0036989
DRAWING DATA=2621-625-03 |96169|AL| |D|0005 |AL|49998|0060702
DRAWING DATA=2621-625-03 |96169|AL| |D|0005.1 |AK|49998|0071041
DRAWING DATA=2621-625-03 |96169|AL| |D|0006 | S|49998|0041574
DRAWING DATA=2621-625-03 |96169|AL| |D|0007 | S|49998|0042477
DRAWING DATA=2621-625-03 |96169|AL| |D|0008 |AJ|49998|0040172
DRAWING DATA=2621-625-03 |96169|AL| |D|0009 | S|49998|0036836
DRAWING DATA=2621-625-03 |96169|AL| |D|0010 | S|49998|0038141
DRAWING DATA=2621-625-03 |96169|AL| |D|0011 | S|49998|0037232
DRAWING DATA=2621-625-03 |96169|AL| |D|0012 | S|49998|0040562
DRAWING DATA=2621-625-03 |96169|AL| |D|0013 | S|49998|0034249
DRAWING DATA=2621-625-03 |96169|AL| |D|0014 | S|49998|0036960
DRAWING DATA=2621-625-03 |96169|AL| |D|0015 |AC|49998|0036326
DRAWING DATA=2621-625-03 |96169|AL| |D|0016 | S|49998|0037485
DRAWING DATA=2621-625-03 |96169|AL| |D|0017 | S|49998|0080682
DRAWING DATA=2621-625-03 |96169|AL| |D|0018 | S|49998|0058706
DRAWING DATA=2621-625-03 |96169|AL| |D|0019 | S|49998|0065643
DRAWING DATA=2621-625-03 |96169|AL| |D|0020 |AC|49998|0065400
DRAWING DATA=2621-625-03 |96169|AL| |D|0021 |AC|49998|0065890
DRAWING DATA=2621-625-03 |96169|AL| |D|0022 | S|49998|0070546
DRAWING DATA=2621-625-03 |96169|AL| |D|0023 | S|49998|0077894
DRAWING DATA=2621-625-03 |96169|AL| |D|0024 |AC|49998|0061529
DRAWING DATA=2621-625-03 |96169|AL| |D|0025 | S|49998|0080991
DRAWING DATA=2621-625-03 |96169|AL| |D|0026 | S|49998|0078169
DRAWING DATA=2621-625-03 |96169|AL| |D|0027 | S|49998|0062079
DRAWING DATA=2621-625-03 |96169|AL| |D|0028 | S|49998|0063911
DRAWING DATA=2621-625-03 |96169|AL| |D|0029 | S|49998|0081357
DRAWING DATA=2621-625-03 |96169|AL| |D|0030 | S|49998|0078268
DRAWING DATA=2621-625-03 |96169|AL| |D|0031 | S|49998|0067988
DRAWING DATA=2621-625-03 |96169|AL| |D|0032 | S|49998|0052338
DRAWING DATA=2621-625-03 |96169|AL| |D|0033 | S|49998|0066347
DRAWING DATA=2621-625-03 |96169|AL| |D|0034 | S|49998|0076897
DRAWING DATA=2621-625-03 |96169|AL| |D|0035 |AC|49998|0117817
DRAWING DATA=2621-625-03 |96169|AL| |D|0036 | S|49998|0070990
DRAWING DATA=2621-625-03 |96169|AL| |D|0037 | S|49998|0075571
DRAWING DATA=2621-625-03 |96169|AL| |D|0038 | S|49998|0069120
DRAWING DATA=2621-625-03 |96169|AL| |D|0039 | S|49998|0075078
DRAWING DATA=2621-625-03 |96169|AL| |D|0040 | S|49998|0100110
DRAWING DATA=2621-625-03 |96169|AL| |D|0041 | S|49998|0097068
DRAWING DATA=2621-625-03 |96169|AL| |D|0042 | S|49998|0077580
DRAWING DATA=2621-625-03 |96169|AL| |D|0043 | S|49998|0071220
DRAWING DATA=2621-625-03 |96169|AL| |D|0044 |AC|49998|0073502
DRAWING DATA=2621-625-03 |96169|AL| |D|0045 | S|49998|0071561
DRAWING DATA=2621-625-03 |96169|AL| |D|0046 |AC|49998|0053564
DRAWING DATA=2621-625-03 |96169|AL| |D|0047 |AC|49998|0088878
DRAWING DATA=2621-625-03 |96169|AL| |D|0048 | S|49998|0080796
DRAWING DATA=2621-625-03 |96169|AL| |D|0049 | Z|49998|0106263
DRAWING DATA=2621-625-03 |96169|AL| |D|0050 | S|49998|0088279
DRAWING DATA=2621-625-03 |96169|AL| |D|0051 | S|49998|0089976
DRAWING DATA=2621-625-03 |96169|AL| |D|0052 | S|49998|0067306
DRAWING DATA=2621-625-03 |96169|AL| |D|0053 | S|49998|0065072
DRAWING DATA=2621-625-03 |96169|AL| |D|0054 | S|49998|0071895
DRAWING DATA=2621-625-03 |96169|AL| |D|0055 | L|49998|0060798
DRAWING DATA=2621-625-03 |96169|AL| |D|0056 | L|49998|0060631
DRAWING DATA=2621-625-03 |96169|AL| |D|0057 |AC|49998|0087017
DRAWING DATA=2621-625-03 |96169|AL| |D|0058 | S|49998|0079014
DRAWING DATA=2621-625-03 |96169|AL| |D|0059 | S|49998|0087182
DRAWING DATA=2621-625-03 |96169|AL| |D|0060 | S|49998|0080044
DRAWING DATA=2621-625-03 |96169|AL| |D|0061 | S|49998|0088606
DRAWING DATA=2621-625-03 |96169|AL| |D|0062 | S|49998|0082165
DRAWING DATA=2621-625-03 |96169|AL| |D|0063 | M|49998|0070993
DRAWING DATA=2621-625-03 |96169|AL| |D|0064 | M|49998|0067453
DRAWING DATA=2621-625-03 |96169|AL| |D|0065 | M|49998|0067192
DRAWING DATA=2621-625-03 |96169|AL| |D|0066 | S|49998|0070847
DRAWING DATA=2621-625-03 |96169|AL| |D|0067 | W|49998|0079068
DRAWING DATA=2621-625-03 |96169|AL| |D|0069 | S|49998|0078860
DRAWING DATA=2621-625-03 |96169|AL| |D|0070 | S|49998|0067697
DRAWING DATA=2621-625-03 |96169|AL| |D|0071 | W|49998|0075516
DRAWING DATA=2621-625-03 |96169|AL| |D|0072 | S|49998|0121919
DRAWING DATA=2621-625-03 |96169|AL| |D|0073 | N|49998|0063130
DRAWING DATA=2621-625-03 |96169|AL| |D|0074 |AC|49998|0088058
DRAWING DATA=2621-625-03 |96169|AL| |D|0075 | S|49998|0091225
DRAWING DATA=2621-625-03 |96169|AL| |D|0076 | S|49998|0084931
DRAWING DATA=2621-625-03 |96169|AL| |D|0077 | S|49998|0080448
DRAWING DATA=2621-625-03 |96169|AL| |D|0078 | S|49998|0088423
DRAWING DATA=2621-625-03 |96169|AL| |D|0079 | S|49998|0097630
DRAWING DATA=2621-625-03 |96169|AL| |D|0080 | S|49998|0102812
DRAWING DATA=2621-625-03 |96169|AL| |D|0081 | S|49998|0089089
DRAWING DATA=2621-625-03 |96169|AL| |D|0082 | S|49998|0091204
DRAWING DATA=2621-625-03 |96169|AL| |D|0083 | S|49998|0093758
DRAWING DATA=2621-625-03 |96169|AL| |D|0084 | S|49998|0074452
DRAWING DATA=2621-625-03 |96169|AL| |D|0085 | S|49998|0101412
DRAWING DATA=2621-625-03 |96169|AL| |D|0086 | S|49998|0124627
DRAWING DATA=2621-625-03 |96169|AL| |D|0087 | S|49998|0089362
DRAWING DATA=2621-625-03 |96169|AL| |D|0088 | S|49998|0125925
DRAWING DATA=2621-625-03 |96169|AL| |D|0089 | T|49998|0138119
DRAWING DATA=2621-625-03 |96169|AL| |D|0090 | S|49998|0172266
DRAWING DATA=2621-625-03 |96169|AL| |D|0091 | S|49998|0087770
DRAWING DATA=2621-625-03 |96169|AL| |D|0092 | S|49998|0082515
DRAWING DATA=2621-625-03 |96169|AL| |D|0093 | S|49998|0083019
DRAWING DATA=2621-625-03 |96169|AL| |D|0094 | S|49998|0082380
DRAWING DATA=2621-625-03 |96169|AL| |D|0095 | S|49998|0086506
DRAWING DATA=2621-625-03 |96169|AL| |D|0096 | S|49998|0125829
DRAWING DATA=2621-625-03 |96169|AL| |D|0097 | S|49998|0108393
DRAWING DATA=2621-625-03 |96169|AL| |D|0098 | T|49998|0065762
DRAWING DATA=2621-625-03 |96169|AL| |D|0100 | T|49998|0070894
DRAWING DATA=2621-625-03 |96169|AL| |D|0101 | T|49998|0071718
DRAWING DATA=2621-625-03 |96169|AL| |D|0102 | T|49998|0071097
DRAWING DATA=2621-625-03 |96169|AL| |D|0103 | T|49998|0090824
DRAWING DATA=2621-625-03 |96169|AL| |D|0104 | T|49998|0090404
DRAWING DATA=2621-625-03 |96169|AL| |D|0105 | T|49998|0076361
DRAWING DATA=2621-625-03 |96169|AL| |D|0106 | U|49998|0082997
DRAWING DATA=2621-625-03 |96169|AL| |D|0107 | U|49998|0091013
DRAWING DATA=2621-625-03 |96169|AL| |D|0108 | T|49998|0137512
DRAWING DATA=2621-625-03 |96169|AL| |D|0109 | U|49998|0086586
DRAWING DATA=2621-625-03 |96169|AL| |D|0110 | V|49998|0136029
DRAWING DATA=2621-625-03 |96169|AL| |D|0111 | V|49998|0123395
DRAWING DATA=2621-625-03 |96169|AL| |D|0112 | V|49998|0072126
DRAWING DATA=2621-625-03 |96169|AL| |D|0113 | V|49998|0071344
DRAWING DATA=2621-625-03 |96169|AL| |D|0114 | V|49998|0069795
DRAWING DATA=2621-625-03 |96169|AL| |D|0115 | V|49998|0073173
DRAWING DATA=2621-625-03 |96169|AL| |D|0117 | V|49998|0071456
DRAWING DATA=2621-625-03 |96169|AL| |D|0118 | V|49998|0077864
DRAWING DATA=2621-625-03 |96169|AL| |D|0119 | V|49998|0073056
DRAWING DATA=2621-625-03 |96169|AL| |D|0120 | V|49998|0094572
DRAWING DATA=2621-625-03 |96169|AL| |D|0121 | V|49998|0076429
DRAWING DATA=2621-625-03 |96169|AL| |D|0122 | V|49998|0109802
DRAWING DATA=2621-625-03 |96169|AL| |D|0123 | V|49998|0072693
DRAWING DATA=2621-625-03 |96169|AL| |D|0124 | V|49998|0060600
DRAWING DATA=2621-625-03 |96169|AL| |D|0125 | W|49998|0063434
DRAWING DATA=2621-625-03 |96169|AL| |D|0126 |AA|49998|0073173
DRAWING DATA=2621-625-03 |96169|AL| |D|0127 | W|49998|0064212
DRAWING DATA=2621-625-03 |96169|AL| |D|0128 | W|49998|0063746
DRAWING DATA=2621-625-03 |96169|AL| |D|0129 | W|49998|0071249
DRAWING DATA=2621-625-03 |96169|AL| |D|0130 | W|49998|0082521
DRAWING DATA=2621-625-03 |96169|AL| |D|0132 | W|49998|0077575
DRAWING DATA=2621-625-03 |96169|AL| |D|0133 | Y|49998|0063434
DRAWING DATA=2621-625-03 |96169|AL| |D|0134 | Y|49998|0078666
DRAWING DATA=2621-625-03 |96169|AL| |D|0135 |AC|49998|0091986
DRAWING DATA=2621-625-03 |96169|AL| |D|0136 | Y|49998|0080972
DRAWING DATA=2621-625-03 |96169|AL| |D|0137 | Y|49998|0082349
DRAWING DATA=2621-625-03 |96169|AL| |D|0138 | Y|49998|0078670
DRAWING DATA=2621-625-03 |96169|AL| |D|0139 | Y|49998|0068212
DRAWING DATA=2621-625-03 |96169|AL| |D|0140 | Y|49998|0062850
DRAWING DATA=2621-625-03 |96169|AL| |D|0141 | Z|49998|0067637
DRAWING DATA=2621-625-03 |96169|AL| |D|0142 | Z|49998|0101793
DRAWING DATA=2621-625-03 |96169|AL| |D|0143 | Z|49998|0102035
DRAWING DATA=2621-625-03 |96169|AL| |D|0144 | Z|49998|0062060
DRAWING DATA=2621-625-03 |96169|AL| |D|0145 |AA|49998|0059438
DRAWING DATA=2621-625-03 |96169|AL| |D|0146 |AA|49998|0064093
DRAWING DATA=2621-625-03 |96169|AL| |D|0147 |AA|49998|0062043
DRAWING DATA=2621-625-03 |96169|AL| |D|0148 |AA|49998|0067228
DRAWING DATA=2621-625-03 |96169|AL| |D|0149 |AB|49998|0075074
DRAWING DATA=2621-625-03 |96169|AL| |D|0150 |AB|49998|0081824
DRAWING DATA=2621-625-03 |96169|AL| |D|0151 |AC|49998|0081539
DRAWING DATA=2621-625-03 |96169|AL| |D|0152 |AB|49998|0066724
DRAWING DATA=2621-625-03 |96169|AL| |D|0153 |AB|49998|0063072
DRAWING DATA=2621-625-03 |96169|AL| |D|0156 |AD|49998|0070574
DRAWING DATA=2621-625-03 |96169|AL| |D|0157 |AE|49998|0077520
DRAWING DATA=2621-625-03 |96169|AL| |D|0158 |AE|49998|0072166
DRAWING DATA=2621-625-03 |96169|AL| |D|0159 |AF|49998|0077054
DRAWING DATA=2621-625-03 |96169|AL| |D|0160 |AF|49998|0069001
DRAWING DATA=2621-625-03 |96169|AL| |D|0161 |AF|49998|0072044
DRAWING DATA=2621-625-03 |96169|AL| |D|0162 |AF|49998|0069580
DRAWING DATA=2621-625-03 |96169|AL| |D|0163 |AF|49998|0062209
DRAWING DATA=2621-625-03 |96169|AL| |D|0164 |AG|49998|0065301
DRAWING DATA=2621-625-03 |96169|AL| |D|0165 |AG|49998|0075974
DRAWING DATA=2621-625-03 |96169|AL| |D|0167 |AH|49998|0058799
DRAWING DATA=2621-625-03 |96169|AL| |D|0168 |AH|49998|0072714
DRAWING DATA=2621-625-03 |96169|AL| |D|0169 |AH|49998|0075954
DRAWING DATA=2621-625-03 |96169|AL| |D|0170 |AH|49998|0027555
DRAWING DATA=2621-625-03 |96169|AL| |D|0172 |AJ|49998|0032592
DRAWING DATA=2621-625-03 |96169|AL| |D|0173 |AJ|49998|0035233
DRAWING DATA=2621-625-03 |96169|AL| |D|0174 |AJ|49998|0036435
DRAWING DATA=2621-625-03 |96169|AL| |D|0175 |AL|49998|0034587
DRAWING DATA=2621-625-03 |96169|AL| |D|0176 |AL|49998|0031758
DRAWING DATA=2621-625-03 |96169|AL| |D|0177 |AL|49998|0032520
DRAWING DATA=2621-625-03 |96169|AL| |D|0178 |AL|49998|0032671
DRAWING DATA=2621-625-03 |96169|AL| |D|0179 |AL|49998|0037460
DRAWING DATA=2621-625-03 |96169|AL| |D|0180 |AL|49998|0036663
DRAWING DATA=2621-625-03 |96169|AL| |D|0181 |AL|49998|0036941
DRAWING DATA=2621-625-03 |96169|AL| |D|0182 |AL|49998|0037691
DRAWING DATA=2621-625-03 |96169|AL| |D|0185 |AK|49998|0034494
DRAWING DATA=2621-625-03 |96169|AL| |D|0186 |AL|49998|0040759
DRAWING DATA=2621-625-03 |96169|AL| |D|0187 |AL|49998|0033485
DRAWING DATA=2621-625-03 |96169|AL| |D|0188 |AL|49998|0037555
DRAWING DATA=2621-625-03 |96169|AL| |D|0189 |AL|49998|0048190
DRAWING DATA=2621-625-03 |96169|AL| |D|0190 |AL|49998|0032497
DRAWING DATA=4640418 |80064| E| |D|0001 | E|00026|0000000
DRAWING DATA=4674155 |80064| F| |D|0001 | F|49998|0216200
DRAWING DATA=7285297 |53711| E| |D|0001 | E|49998|0862180
DRAWING DATA=7285297 |53711| E| |D|0002 | E|49998|0392982
DRAWING DATA=7285297 |53711| E| |D|0003 | E|49998|0280881
DRAWING DATA=7285297 |53711| E| |D|0004 | E|49998|0204692
DRAWING DATA=8617511 |53711| N| |D|0001 | |49998|3447332
DOCUMENT REF DATA=ANSI/ASQ-Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=ASTM-B139 | | | |121001|A| | |
DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | |
DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | |
DOCUMENT REF DATA=ASTM-B505 | | | |140401|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-DTL-32286 | | | |090408|A|2 | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01|
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |
3. REQUIREMENTS
3.1 ;The 2 1/2" Ball Valve must be in accordance with Naval Ship Systems Command Drawing 508-4674155, except as amplified or modified herein.;
3.1.1 ;Bolt holes on mounting flanges must not be drilled.;
3.2 ;NOTE: The dimension, .047 +.000/-.015, in zone B20 of Drawing 4674155 is a radius.;
3.3 Thrust Washer Material - Thrust washer, ;Item 13 on Drawing 4674155 and Item 21 on Drawing 4674155; to be Nylatron GSVQ-II (Nylon 66 with molybdenum disulfide) in accordance with MIL-DTL-32286, as manufactured by Quadrant Engineering Plastic Products
(EPP).
3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;Body, item 26 on Drawing 4674155 and Tailpiece, item 2 on Drawing 4674155;
Material - ;ASTM-B369, Alloy UNS C96400;
Part - ;Stem, item 3 on Drawing 4674155;
Material - ;ASTM-B150, Alloy C63200, Temper TQ50;
Part - ;Stem Retaining Nut, item 4 on drawing 4674155;
Material - ;ASTM-B505, Alloy UNC C90300, or ASTM-B139, Alloy UNC C51000, Temper H04;
Part - ;Ball, item 23L1 on Drawing 8617511;
Material - SAE-AMS-6931
Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6"
to 10", must be applied.
Part - ;Seats (Q3), item 12 on Drawing 7285297;
Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only)
ITEM PROPERTY ASTM TEST METHOD VALUE
(A) Hardness D2240 70 +/- 5 Shore D
(B) Specific Gravity D792 1.18 +/- 0.02
(C) Tensile Strength D412 (DIEC) 5000 PSI MIN
(D) Compression-Defl D575 700 PSI MIN @ 2% DEF.
(E) Tensile Impact D1822 300 FT-LB/SQ IN
(Note 1) (TYPE L SPECIMEN)
(F) Water Absorption D570 1.5% MAX
(1 Week at R.T.)
Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum.
3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - Weldability Test of ASTM-B369 material
Item - ;Body, item 26 on Drawing 4674155 and Tailpiece, item 2 on Drawing 4674155;
Performance - ASTM-B369
Acceptance - ASTM-B369
Test - Pressure Tests
Item - Each Assembly
Performance - ;General Notes 5 on Drawing 508-4674155;
Acceptance - ;General Notes 5 on Drawing 508-4674155;
Test - Non-Destructive Tests
Item - ;Weld Repair and/or Production Weld (as applicable);
Performance - Per applicable fabrication specification
Acceptance - Per applicable fabrication specification
3.6 Radiography is required on ;Body, item 26 on Drawing 4674155 and Tailpiece, item 2 on Drawing 4674155; .
3.7 ;Surface waviness must be verified prior to Teflon coating;
3.8 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;845-4640418, Rev E; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the
working pressure on the item does not apply and is strictly prohibited.
3.9 Chemours Company (formerly DuPont) Teflon Coating 850G-204 and 852G-201. Use of Chemours Company (formerly DuPont) Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;8; of
drawing ;8617511; .
3.9.1 Naval Ordnance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018 in ECDS at https://register.nslc.navy.mil/
3.9.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing.
3.10 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099; in ECDS at https://register.nslc.navy.mil/
3.11 A visual inspection shall be performed on the finished seat with acceptance criteria on critical surfaces per CSD167 in the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/.
3.12 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the
following must be used:
For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG.
For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.
For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.
The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this
contract, the following must be used:
For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.
For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.
For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes.
3.13 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General
Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided
in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria.
The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/
3.14 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on
the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be
required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension.
3.15 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the
fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly.
3.16 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.
3.17 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID T886375107; ) must be added. When no plate is specified, an
identification plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached.
3.18 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel
applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not
permitted on ;UNS C90300 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.19 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.20 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.20.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide
a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.20.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.20.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.21 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.22 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.22.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.23 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.24 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.24.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.24.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted,
citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'')
3.24.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the
contract.
3.24.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including
size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure
Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.24.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.24.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted
as part of the qualification data.
3.24.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential
elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.24.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.24.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.
3.24.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.
3.24.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.24.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.25 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level I per the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the
applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable.
3.25.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing the radiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketch approval is not required for
radiography of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend
only on the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this data has been
previously approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal.
3.25.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable to the RT film.)
3.25.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiography requires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to
shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection.
(a) Film
(b) RSS/RSSS
(c) RS (Reader Sheets)
(d) Documentation record listing the part number, heat/lot traceability, and theunique RT serial number (which is traceable to the RT film and reader sheet)
3.26 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.26.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.26.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.26.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.26.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly
notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.26.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.27 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.27.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices
and for verification of their accuracy and condition.
3.27.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.28 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.29 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.29.1 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.29.2 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.29.3 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must
be established. Records of this effort must be available for review by the government.
3.29.4 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.30 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.30.1 Visual examination upon receipt to detect damage during transit.
3.30.2 Inspection for completeness and proper type.
3.30.3 Verification of material quality received.
3.30.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.30.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.30.6 Identification and protection from improper use or disposition.
3.30.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.30.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.30.9 Material returned to the contractor must be handled as GFM.
3.31 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.31.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein.
3.32 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number for metallic material or batch of non-metallic material, as applicable, which must also be marked on the
material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples
must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the
finished component.
3.32.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.32.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.32.3 Permanent marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Marking area to be as shown on Drawing. Balls are to be marked in the waterway and Seats are to be the marked on the outer
cylindrical surface.;
3.32.4 Seat Marking - Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size
scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats.
Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification.
3.32.5 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part
number, piece number, traceability number, and the location of the permanent mark.
3.33 See CDRL-DI-MISC-81020 (Chemical and Mechanical) and CDRL DI-MISC-80678 (SEAT MATERIAL) - Material Certifications - The following material certification requirements apply:
3.33.1 Metallic Material - Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as
applicable, of the material supplied.
3.33.2 Non-Metallic Material - The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or
composition, as applicable, of the material supplied.
3.33.3 Re-identification and re-certification of metallic material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical
composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a
process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The
altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties
are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER _______________ AND HEAT TREAT NUMBER ______________________
(when applicable)
_________________________________________ DATE _____________________ (name and signature of auth. co. rep.)
3.33.4 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.33.5 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.33.6 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.34 Material Handling - The written material control process must include the following:
3.34.1 All raw materials must have traceability markings (except as specified below).
3.34.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.34.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.34.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.34.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.34.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and
marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.35 Receiving Inspection
3.35.1 Products and
- Opportunity closing date
- 20 June 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- NAVSUP WEAPON SYSTEMS SUPPORT MECH
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.