Community measure - L 1354 OD Ponitz, 1st BA, north, continuation; road renewal (components 0-9)

Brief description:
to f) Art\/scope of services:
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Component 1: Road construction
approx. 825 m³ earthworks, up to Z 2, non-hazardous waste
approx. 220 t earthworks, hazardous waste
approx. 235 m partial seepage pipe DN 100
approx. 35 m PP pipe DN 150
Approx. 12 road gullies with class D top, 300 x 500 mm, console form
Approx. 700 m³ frost protection layer 0\/45
approx. 990 m² AC 32 T S, D=16 cm
approx. 150 m² AC 32 T N, D=10\/14 cm
approx. 2,030 m² SMA 8 N, D=4 cm
approx. 110 m² AC 8 N, D=4 cm
approx. 130 m raised kerb A 5
approx. 60 m round kerb B 6
approx. 270 m small paving strips, approx. 45 cm wide
approx. 52 m large paving strips, 1-line
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 2: New construction of retaining wall 2
approx. 14 t dry stone wall made of natural stone blocks (completion)
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 3: New construction of retaining wall 3
approx. 5 m³ Gabion wall construction (L approx. 20m; completion)
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 4: Side areas incl. civil engineering SB
approx. 630 m³ earthworks, up to Z 2
approx. 310 m³ frost protection layer 0\/45
Approx. 70 m² gravel base course 0\/45
approx. 160 m² AC 32 T N, D=10 cm
approx. 160 m² AC 8 D N, D=4 cm
Approx. 500 m² concrete block paving
Approx. 240 m raised kerb A 5
approx. 170 m round kerb B 6
approx. 210 m low kerb
Approx. 170 m civil engineering services Cable trenches for street lighting
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 5: Site clearance, adaptation of side areas
approx. 90 m³ earthworks, up to Z 2
Approx. 40 m³ frost protection layer 0\/45 mm
Approx. 140 m² gravel base layer 0\/45 mm
Approx. 100 m² concrete block paving
Approx. 70 m low kerb
Approx. 94 m palisade wall, composite palisades
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 6: Renewal of roadway Gößnitzer Straße (former nursery)
approx. 420 m³ earthworks, up to Z 2
approx. 130 m partial seepage pipe DN 100
approx. 20 m PP pipe DN 150
Approx. 3 road drains with class D attachment, 300 x 500 mm, console form
approx. 350 m² hydraulically bound base course (HGT), d=15cm
approx. 350 m² AC 32 T N, d=10 cm
approx. 540 m² AC 8 D N, d=4 cm
Approx. 170 m round kerb B 6
Approx. 90 m of civil engineering work Cable trenches for broadband duct
approx. 25 m pipe railing construction
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 7: New construction of wastewater sewer
approx. 1,090 m³ earthworks, up to Z2
approx. 2,170 m² shoring work
Drainage channel work:
approx. 355 m DN 200 PP, incl. manholes (7 pcs.)
approx. 60 m² traffic route work
SW house connections (8 pcs.)
Approx. 40 m civil engineering services\earthworks
approx. 40 m EW sewer work DN 150 PP
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 8: New construction of rainwater sewer
approx. 360 m³ earthworks, up to Z2
approx. 750 m² shoring work
Drainage channel work:
approx. 500 m DN 150 - 300 PP, incl. manholes (3 pcs.)
Approx. 45 m² traffic route work
Approx. 100 m civil engineering services\earthworks
approx. 100 m EW sewer work DN 150 PP
--- --- --- --- --- --- --- --- --- --- --- --- ---
Component 9: Drinking water pipeline construction
approx. 210 m³ earthworks, up to Z2
approx. 590 m² shoring work
Pressure pipe work:
approx. 40 m PE-HD 63 x 5.8, incl. fittings
approx. 10 m PE-HD 90 x 8.2, incl. fittings
approx. 130 m PE-HD 125 x 11.4, incl. fittings
approx. 50 m² traffic route work
TW - house connections, public area (9 pcs.)
approx. 125 m civil engineering services\/earthworks
Approx. 50 m pressure pipe work PE 32 x 2.9 and 50 x 4.6, incl. fittings
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---
Note on j) Secondary offers
... (The text has been cut off. You can find the entire text in the PDF file)

Opportunity closing date
15 October 2024
Value of contract
to be confirmed

About the buyer

Address
Thüringer Landesamt für Bau und Verkehr, Referat 44 - Region Ost

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?