Germany - Type of contract: Construction work Title of the contract: B180 Walbeck - Quensted
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 10 September 2024
- Opportunity publication date
- 14 August 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Type of contract:
Construction work
Title of the contract:
B180 Walbeck - Quenstedt road construction
Short description:
Road reconstruction and upgrading
Rough quantity overview B180 Walbeck-Quenstedt
Deconstruction
7,000 m³ topsoil removal and interim storage
7,000 m³ topsoil AG pick up and cover
3. 100 m topsoil recycling
Sow 8,000 m² topsoil storage area
Water 16,000 m² vegetation area
15. 430 m² asphalt milling depth generally 4 cm
15. 210 m² Milling asphalt depth 8 cm in general
380 m² Milling asphalt Depth 12 cm on average
15. 210 m² Milling asphalt Depth in m. 18 cm
2. 500 m² Milling asphalt d = up to 30 cm
2. 500 m² asphalt milling d = up to 40 cm
Separate 220 m asphalt
Pick up and recycle 100 m² of natural stone paving
Earthworks
8,000 m³ soil loosening and recycling, homogeneous area = loosening 2
12,000 m³ soil loosening and installation, homogeneous area = solution 2
480 m³ of soil removed and recycled, homogeneous area = solution 3
840 m³ Loosen and dispose of soil, hazardous contents, homogeneous area \'= solution 3
4. 770 t Dispose of hazardous waste
Compact 20,000 m² of soil
25. 000 m² Create subgrade
19. 100 m² subgrade consolidation
Spread 1. 205 t of binding agent 50\/50
Carry out 32. 300 m² of soil improvement
480 m³ Carry out soil replacement
Carry out 250 t of subsoil improvement
13. Supply and install 100 m³ of building material, embankment fill material
2. Lay 600 m² geotextile as separation layer
7. 800 m² embankment with steps
2. Create 820 m trough at base of embankment
Reinforce 60 m trough as rough bed trough
Create 435 m³ trench
8 pcs. retaining sleepers from KP 10\/10\/10
Pipeline construction
Construction of 26 m reinforced concrete pipeline DN800
8 pcs concrete foundation against scouring
44 m reinforced concrete pipeline DN500
49 m PP pipeline construction DN400
21 m PP pipeline construction DN500
207 m² armourstones LMB 5\/40
4. Supply and lay 200 m protective pipe d63
2. Supply and lay 100 m protective pipe d110
140 m³ Create cable trench LSA up to 4 pipes DN 110
12 pcs Cable duct LSA supply, install
510 m cable conduit LSA supply, install
160 m cable conduit SBL PE-HD DN 110
Kerb \/ paving work
43 m Adhesive kerbstones supply, install
Set 156 m natural bristle A5
Supply and install 40 m Kassel kerb
2. 600 m² SoB pick up\/ recycle
1. Dispose of 320 m³ SoB, waste code 170301*
Produce 972 m³ frost protection layer
5. Create 350 m² gravel base course, d = 15 cm
Create 900 m² gravel base layer, d = 30 cm
321 tons of gravel base course
1. 710 m² Create surface course without binder, d = 5 cm
1. 494 m³ of embankment
Asphalt work
16. 665 m² asphalt binder AC 22 B S, d = 8 cm
500 m² asphalt base course AC 32 TS, d = 10 cm
610 m² asphalt base course AC 32 TS, d = 26cm
17. 410 m² asphalt base course AC 32 TS, d = 30cm
4. 500 m² asphalt base course AC 22 T L, d = 8 cm
17. 560 m² asphalt surface course SMA 11 S, d = 4 cm
31 m² asphalt surface course MA 11 S, d = 8 cm
1,005 m² asphalt base course AC 16 TD, d = 7 cm
470 m Joint construction, filling
3. 555 m edge sealing
Landscaping
30,000 m² wet seeding with RSM Regio
Lay 20,000 m² of erosion protection fabric
Mowing, ripping and processing 60,000 m² of vegetation areas
1. 680 m clearance profile cut
1. 890 m² clearing shrubbery
Cut down 20 trees
Railings
Supply and install 300 m of steel railings
22 m filler bar railing
Marking and signage
20 new signs
6. 110 m new markings
- Opportunity closing date
- 10 September 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Landesstraßenbaubehörde Sachsen-Anhalt RB Süd
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.