Germany - Type of contract: Construction work Title of the contract: B180 Walbeck - Quensted

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
10 September 2024
Opportunity publication date
14 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Type of contract:
Construction work

Title of the contract:
B180 Walbeck - Quenstedt road construction

Short description:
Road reconstruction and upgrading
Rough quantity overview B180 Walbeck-Quenstedt
Deconstruction
7,000 m³ topsoil removal and interim storage
7,000 m³ topsoil AG pick up and cover
3. 100 m topsoil recycling
Sow 8,000 m² topsoil storage area
Water 16,000 m² vegetation area
15. 430 m² asphalt milling depth generally 4 cm
15. 210 m² Milling asphalt depth 8 cm in general
380 m² Milling asphalt Depth 12 cm on average
15. 210 m² Milling asphalt Depth in m. 18 cm
2. 500 m² Milling asphalt d = up to 30 cm
2. 500 m² asphalt milling d = up to 40 cm
Separate 220 m asphalt
Pick up and recycle 100 m² of natural stone paving
Earthworks
8,000 m³ soil loosening and recycling, homogeneous area = loosening 2
12,000 m³ soil loosening and installation, homogeneous area = solution 2
480 m³ of soil removed and recycled, homogeneous area = solution 3
840 m³ Loosen and dispose of soil, hazardous contents, homogeneous area \'= solution 3
4. 770 t Dispose of hazardous waste
Compact 20,000 m² of soil
25. 000 m² Create subgrade
19. 100 m² subgrade consolidation
Spread 1. 205 t of binding agent 50\/50
Carry out 32. 300 m² of soil improvement
480 m³ Carry out soil replacement
Carry out 250 t of subsoil improvement
13. Supply and install 100 m³ of building material, embankment fill material
2. Lay 600 m² geotextile as separation layer
7. 800 m² embankment with steps
2. Create 820 m trough at base of embankment
Reinforce 60 m trough as rough bed trough
Create 435 m³ trench
8 pcs. retaining sleepers from KP 10\/10\/10
Pipeline construction
Construction of 26 m reinforced concrete pipeline DN800
8 pcs concrete foundation against scouring
44 m reinforced concrete pipeline DN500
49 m PP pipeline construction DN400
21 m PP pipeline construction DN500
207 m² armourstones LMB 5\/40
4. Supply and lay 200 m protective pipe d63
2. Supply and lay 100 m protective pipe d110
140 m³ Create cable trench LSA up to 4 pipes DN 110
12 pcs Cable duct LSA supply, install
510 m cable conduit LSA supply, install
160 m cable conduit SBL PE-HD DN 110
Kerb \/ paving work
43 m Adhesive kerbstones supply, install
Set 156 m natural bristle A5
Supply and install 40 m Kassel kerb
2. 600 m² SoB pick up\/ recycle
1. Dispose of 320 m³ SoB, waste code 170301*
Produce 972 m³ frost protection layer
5. Create 350 m² gravel base course, d = 15 cm
Create 900 m² gravel base layer, d = 30 cm
321 tons of gravel base course
1. 710 m² Create surface course without binder, d = 5 cm
1. 494 m³ of embankment
Asphalt work
16. 665 m² asphalt binder AC 22 B S, d = 8 cm
500 m² asphalt base course AC 32 TS, d = 10 cm
610 m² asphalt base course AC 32 TS, d = 26cm
17. 410 m² asphalt base course AC 32 TS, d = 30cm
4. 500 m² asphalt base course AC 22 T L, d = 8 cm
17. 560 m² asphalt surface course SMA 11 S, d = 4 cm
31 m² asphalt surface course MA 11 S, d = 8 cm
1,005 m² asphalt base course AC 16 TD, d = 7 cm
470 m Joint construction, filling
3. 555 m edge sealing
Landscaping
30,000 m² wet seeding with RSM Regio
Lay 20,000 m² of erosion protection fabric
Mowing, ripping and processing 60,000 m² of vegetation areas
1. 680 m clearance profile cut
1. 890 m² clearing shrubbery
Cut down 20 trees
Railings
Supply and install 300 m of steel railings
22 m filler bar railing
Marking and signage
20 new signs
6. 110 m new markings

Opportunity closing date
10 September 2024
Value of contract
to be confirmed

About the buyer

Address
Landesstraßenbaubehörde Sachsen-Anhalt RB Süd