Germany - The Untere Ahr wastewater treatment plant in Sinzig was hit by the flood disaster in 2021.

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
09 September 2024
Opportunity publication date
10 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Untere Ahr wastewater treatment plant in Sinzig was severely damaged by the 2021 flood disaster. A provisional recommissioning of the wastewater treatment plant at the existing site was achieved after 5 months. However, even before the event, the wastewater treatment plant was due to be extensively rebuilt due to the need for renovation and expansion. In the course of planning, which began in 2021, the site was already critically assessed with regard to flood events and classified as not eligible for approval again. The area now selected for the new construction of the Untere Ahr sewage treatment plant is located north of the B 266 on a site that is geodetically around 7-8 m above the old site and is therefore safe from flooding. The site is located in the Remagen urban area. The Mayschoß sewage treatment plant was completely destroyed in the catastrophic flood and will not be rebuilt at the old site. The catchment area (4,000 PE) will be connected to the network in the catchment area of the Untere Ahr sewage treatment plant and, according to the requirements planning, a sewage treatment plant with a capacity of at least 174,000 PE is to be built. The inflowing water volumes are expected to be 800 l/s. The objectives of the 4th purification stage are to be defined in the course of planning. The aim is to optimize plant operation in terms of energy and economy with maximum plant availability, and planning with BIM is planned. The possibilities of AI are also to be taken into account. The use of AI should include the optimization of processes with regard to resource savings and energy efficiency. The aim is to operate the sewage treatment plant as climate-neutrally as possible.LotsThe planning services will be awarded in lots:- Lot 1: Project planning services for engineering structures / buildings / planning services for mechanical engineering equipment / I&C technology / electrical engineering / project planning services for outdoor facilities / project planning services for traffic facilities- Lot 2: Structural design services- Lot 3: Project planning services for buildings in accordance with § 35 HOAI- Lot 4: Project management servicesObject list and cost framework The objects to be planned are expected to result in the following chargeable costs:Object new construction of the sewage treatment plant (all figures in euros net):Engineering structures KG 300 37.759,000.00 EURTA AG 1 1,050,000.00 EURTA AG 2 450,000.00 EURTA AG 3 800,000.00 EURTA AG 4 11,440,000.00 EURTA AG 7 18,460,000.00 EURTA AG 8 2,790,000.00 EUR object operating building (planning of the space-creating laboratory and operating rooms):Object planning building KG 300 1.765,000.00 EUROproject workshop building/vehicle hall:project planning building KG 300 1,485,000.00 EUROproject outdoor facilities at the site of the new sewage treatment plant:project planning KG 500 150.000.00 EUROobject Traffic system connection to new sewage treatment plant:Project planning KG 300 500,000.00 EUROobject Pumping station at old site:Engineering structures KG 300 230,000.00 EURTA AG 4 400,000.00 EURTA AG 7 950,000.00 EURTA AG 8 150,000.00 EUROobject Flood protection at old site:Project planning Engineering structures KG 300 2.520,000 EUROBject Supply structure (penstock):Project planning engineering structure KG 300 1,000,000 EUROBject Drainage and energy recovery:Engineering structures KG 300 1,230,000.00 EURTA AG 4 60,000.00 EURTA AG 7 490,000.00 EURTA AG 8 60.000.00 EUROutdoor facilities at the old site:Project planning of the outdoor facilities KG 500 461,000 EURPlanning fees:Sewage treatment plant - engineering structure/ pumping station - engineering structure/ old site - engineering structure/ inlet structure - engineering structure/ drainage - engineering structure/ special services 4,973.195.78 EUROperation building - object planning/ Workshop - object planning/ New wastewater treatment plant - outdoor facilities/ Old wastewater treatment plant - outdoor facilities/ Installation of new wastewater treatment plant - traffic facilities/ special services 474,769.69 EURBMS: wastewater treatment plant - AG 1-4, AG 7-8, wastewater treatment plant - AG 4, AG 7-8, wastewater treatment plant - AG 4, AG 7-8, special services 5,148,713.39 EURThe costs for lots 2 and 3 are still uncertain. The costs for lots 1, 2 and 3 will be carried out in parallel and the subject of this tender is lot 4: project management services. this contract includes partial project management services based on AHO booklet 9. Project management of the overall measure and the lots is to be commissioned on the basis of the attached, modified basic service catalog together with the special services mentioned in accordance with the service profile of project management booklet 9 AHO 2020. Project preparation has been started by the awarding authority, but also with the help of an external service provider. This contract includes parts of the project preparation (AHO LP 1) in accordance with the attached basic service catalog.

Opportunity closing date
09 September 2024
Value of contract
to be confirmed

About the buyer

Address
AZV Abwasserzweckverband Untere Ahr

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?