Germany - The town of Oelde is planning the construction of a new multifunctional triple sports hall at the Wiedenbrücker Straße/"Zur Axt" junction in 59302 Oelde. The new building is necessary due to a lack of hall space in the area of the school grounds.

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
14 October 2024
Opportunity publication date
16 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The town of Oelde is planning the construction of a new multifunctional triple sports hall at the Wiedenbrücker Straße/"Zur Axt" junction in 59302 Oelde. The new building is necessary due to the lack of hall space in the school area of the town of Oelde - but is also intended to serve the training and competition activities of the sports clubs. In addition to the three hall areas, the hall will also have a fixed grandstand with a capacity of 392 seats. This will be supplemented by an extendable telescopic stand, which will provide seating for 400 people and 8 wheelchair spaces plus seating for 400 people. The three-court sports hall is planned as a compact quadrangular structure with a width of approx. 45 m and a depth of 70 m. The east and west facades run parallel to each other. The north wall ("rear") follows the course of the Axtbach stream and the southern entrance façade turns slightly towards the crossroads. This creates an irregular quadrangle. The organization of the supporting structure and the extension follows the parallel east and west façades or is orthogonal to them, and the building has two storeys (with a partial additional technical level on the top floor). The clear hall height to the lower edge of the supporting structure is 7.50 m. The attic is approx. 11.50 m high. The 4 stairwells (TH) are located in the corners, starting with TH 1 in the southwest (central stairwell with elevator and access route for the fire department) and following clockwise with TH 2 (student access), TH 3 and 4 access and escape route for events. The central sports hall area can be reached directly from the southern foyer - with the multifunctional room above it. The equipment and control rooms are located to the west of the sports hall on the ground floor, the changing areas on the upper floor and the technical level and a storage area on the top floor. The grandstand facilities and ancillary rooms for events are located to the east. The hall is connected to the north by a storage area and a further technical area on the upper floor.BRI: approx. 31,000 m³BGF: approx. 5,000 m²NUF: approx. 2,900 m²The subject of this tender is the dry construction work.The work essentially comprises the following services:- Pre-wall installations- Suspended ceilings as grid ceilings (acoustically effective) with edge frieze and smooth ceilings- False ceilings with wood wool lightweight panels (acoustically effective)

Opportunity closing date
14 October 2024
Value of contract
to be confirmed

About the buyer

Address
Stadt Oelde

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?