Description

The new building of the Chemikum, 2nd BA of the FAU Erlangen-Nuremberg is to be built with approx. 14,500m² NF (NUF 1-7) and approx. 34,800m² GFA on the grounds of the NatFak of the South Campus in Erlangen. This is to serve the research and teaching of the Department of Chemistry and Pharmacy of the Faculty of Natural Sciences and the Department of Didactics with the chairs\/units:

- Physical and Theoretical Chemistry (Physical Chemistry (PC1 and PC2), Theoretical Chemistry (TC) and Catalytic Interface Research)
-Inorganic Chemistry (Inorganic and Organometallic Chemistry (AC1), Inorganic and General Chemistry (AC2) and Bioinorganic Chemistry)
- Computer Chemistry Center (CCC)
- Didactics of biology and chemistry
- Premises for joint use (e.g. workshops, office) and the FAU's Facility Management Department.

Building physics includes services for thermal insulation (winter\/summer) and energy balance. Furthermore, services for building acoustics\/sound insulation, room acoustics for selected rooms, building dynamic vibration protection and electromagnetic compatibility (EMC) are required.

With around 40,000 students, Friedrich-Alexander-Universität Erlangen-Nürnberg (FAU) is the third largest university in Bavaria and is spread across various locations in Erlangen and Nuremberg.
The existing Chemikum 1.BA building on the south campus - Organic Chemistry (OC) and Pharmaceutical Chemistry (PC) - will be supplemented by the new Chemikum 2.BA building on the eastern parking lot between the Biologikum and the parking garage. This will be used for research and teaching by the Department of Chemistry and Pharmacy of the Faculty of Natural Sciences and the Department of Didactics with its chairs and units:

- Physical and Theoretical Chemistry (Physical Chemistry (PC1), Physical
Chemistry (PC2), Theoretical Chemistry (TC) and Catalytic Interface Research)
- Inorganic Chemistry (Inorganic and Organometallic Chemistry (AC1), Inorganic and General Chemistry (AC2) and Bioinorganic Chemistry (independent W2 professorship)
- Computer Chemistry Center (CCC)
- Didactics of Biology
- Didactics of Chemistry
- as well as premises for joint use (e.g. workshops and office) and the FAU Facility Management Department.

The new building planned in the project document (PU), LPH2, connects to the central forum of the
Chemikum 1.BA and takes up the heterogeneous environment of the neighboring university buildings in the
the building line of the biology center to the north in the eastern area towards Nikolaus-Fiebiger-Strasse.
biology center to the north.
The massive volume of the 2nd BA is divided into 4 cubes (components A to D). This basic structure
This basic structure, based on the highly efficient flexible laboratory module, is axially aligned from north to south
south via the centrally located access levels. Functionally, the building is structured
The building is structured vertically into 6 levels with corresponding organizational units.

BASEMENT:
- Lecture hall over 2 levels incl. delivery rooms on the ground floor and basement, low-vibration laboratories for AC and PC, workshops, supply and disposal rooms, storage rooms in connection to BA1, arrangement of the technical rooms as 5th cube below the delivery yard.
-EG:
- Lecture hall with anteroom, connection to entrance hall,
- Central entrance hall - for larger public and non-public events,
- Chemistry and biodidactics, PC practical course for advanced and beginners, electronics and IT workshops,
Delivery yard at the north-west corner
1ST FLOOR:
- Rooms\/laboratories for practical training with AC practical course for beginners (AC1+2) and
Advanced practical course (AC1+2) with CIP rooms, chemical dispensing for practical courses,
Multimedia seminar rooms, offices
2ND FLOOR:
- Research level for AC1+2 and PC1+2 with normal\/special laboratories and offices
3RD FLOOR:
- Research level for AC, PC, TC and CCC with laboratories, computer rooms and offices
DG:
- Technical level, especially for the ventilation centers

Opportunity closing date
23 September 2024
Value of contract
to be confirmed

About the buyer

Address
Staatliches Bauamt Erlangen-Nürnberg

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?