Germany - The main features of the service description are:; 265 m²: Asphalt paving
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 13 February 2025
- Opportunity publication date
- 01 February 2025
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The main features of the service description are: 265 m²: Remove and recycle asphalt paving; 1600 m²: Remove and recycle concrete paving; 25: m²: Remove, temporarily store and reinstall concrete paving; 145 m: Pick up kerbstones, recycle; 20: m²: clear trees, incl. roots (height up to 10 m); 3: m: demolish fencing (height up to 1.60 m); 165 m²: lay geotextile; 45: m³: temporary path connections (natural gravel); 25: m³: remove topsoil; 400 m³: loosen and recycle soil; 225 m³: replace soil (coarse-grained soil); 495 m²: create paved area (trafficable), incl. base course, 30x20x8 concrete paving; 125 m²: paving surface (walkable), incl. base course, 30x20x8\/ 20x10x8 concrete paving; 55: m: create eaves strips, 50x50x6 slabs; 475 m: Set concrete kerbs (RB, TB, RaB); 20: m: opaque fence with climb-over protection (height: 2.00 m); 8: m: railing with handrail; 100 pcs. rectangular palisades (16 x 12 x 90-100); 6: m: Block steps (50-100 x 35 x 15); 55: m: Lay rainwater pipe DN 150 PVC (depth up to 2.50 m); 15: m: Lay rainwater pipe DN 200 PVC (depth up to 2.50 m); 15: m: Lay rainwater pressure pipe 63x5.8 (DN 65); 135 m: Lay drainage pipe (building drainage), DN 100; 25: m: Break off rainwater pipe up to DN 300; 1: Pcs. double pumping station for drainage, DN 1000; 1: Pcs. open-air cabinet (pump control and backflow loop); 1: Pcs. pressure breaker shaft, DN 1000; 9: Pcs. D 400, D 400; 12: Pcs: Install drainage shaft DN 300 (plastic), B 125; 5: Pcs: Install road drain (300x500); 15: m: Box gutter cl. B 125 D 400; 20: m: Demolish drinking water pipe up to DN 50; 25: m: Remove electrical and data cables; 175: m: Remove data cable; 175: m: Lay NYY-J 5x4 cable, incl. earthworks; 5: pcs: Pole lights, light point height 4.00 m; 5: pcs: Bicycle leaning bracket; 2: pcs: Waste container box for 2 x 240 l (cast stone); 1: pcs: Waste container box for 1 x 1.100 l (artificial stone); 1: piece: grit bin 550 l (plastic); 2: pieces: leaning bench; 4: pieces: install waste garbage cans provided by the client; 100: m³: deliver topsoil; 3: pieces: plant standard trees, with completion and development care; 40: m²: establish wooded area, with completion and development care; 700: m²: sow lawn, with completion care
- Opportunity closing date
- 13 February 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- "Eigenbetrieb Kommunale Objektbewirtschaftung und -entwicklung der HRO"
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.