Germany - The local fire departments in the districts of Friedrichsthal and Malz, which previously functioned independently and had separate building locations, are to be merged as part of a renovation and expansion plan. The amalgamation...

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 November 2024
Opportunity publication date
23 October 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The local fire departments in the districts of Friedrichsthal and Malz, which previously functioned independently and had separate building locations, are to be merged as part of a renovation and expansion plan. The site of the current Friedrichsthal OT fire department at Keithstraße 1 is planned as the location.location / site:The site to be planned is located in Oranienburg OT Friedrichsthal and has a size of 3,048 m² - it is made up of several parcels (see attachment: "Parcel map excerpt"-circled in blue). The property is located directly in the old town center of Friedrichsthal, on the Anger and directly opposite a listed church building. In the design concept, the creative integration of the building into the context of the old village center must be taken into account.existing building fire station building:On the property there is a currently used equipment house of the local fire department Friedrichsthal from around 1904, which was last extensively renovated in 1997. The windows were also replaced around 2010.The building is a 2-storey building with an additional hose tower and a total floor area of around 250 m².As part of sustainability efforts, it is desired that the existing building or parts of the building fabric be included in the planning.A building condition report is available for an initial assessment of the building fabric of the existing building (see appendix "Building condition report"). To the extent available, this initially supports the concept development. In the event of a planning decision to retain the existing building, further investigations (e.g. wood protection report, pollutant report, proof of stability) will be necessary in order to be able to make a final decision on the feasibility of the project.The existing barn building:A dilapidated, partly ruinous barn building adjoins the fire station to the north-west - the roof has already partially collapsed. There is no information about when it was built, nor any planning documents or similar. The barn part, which is located on the municipal property, will have to be demolished to make room for the extension.sustainability construction method:The future life cycle costs of the building should already be taken into account during the planning stage. Sustainable concepts for greening, material selection, the integration of photovoltaics and the energy source are expected

Opportunity closing date
21 November 2024
Value of contract
to be confirmed

About the buyer

Address
Stadt Oranienburg, Der Bürgermeister

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?