Germany - The existing track systems and structures on the Montpellier Bridge in He

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
10 January 2025
Opportunity publication date
09 December 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The existing track systems and structures on the Montpellier Bridge in Heidelberg will be replaced as part of the
the course of the barrier-free expansion of the "Montpellierbrücke" stop in Heidelberg and track renewal
on the Montpellier Bridge in Heidelberg using the Infundo system from Edilon Sedra. At the beginning
and end of construction, the existing track is connected.
The existing track drainage systems will be removed and replaced with new track drainage boxes.

The work is divided into three lots:
LOS 1 rails H 245
LOS 2 Rails H 175
LOS 3 Structures H175

Opportunity closing date
10 January 2025
Value of contract
to be confirmed

About the buyer

Address
Rhein-Neckar-Verkehr GmbH

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?