Germany - The building was erected in the 1930s and converted into a sports hall in 1984. sports hall of the ame

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
10 October 2024
Opportunity publication date
09 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The building was erected in the 1930s and used in 1984 as a
as a sports hall for the American armed forces in the Cambrai-Fritsch barracks in Darmstadt.
used. The aim is to permanently convert it into a non-standardized, divisible
double sports hall and meeting place for neighborhood and school events.
The aim is to create an assembly facility with a maximum capacity of approx. 300
people. The building is to be classified as a special building. The existing
building volume of 87mx23m will be retained and its appearance will not change.
not change in its appearance. In the course of the energy-efficient refurbishment, only external wall
external wall insulation with the same façade appearance is planned. The total area
of the sports hall on the Ludwigshöhe is 87mx23m with a floor area of 2,000
m2 . The building has internal dimensions of 21m x 85m and has a hipped roof
with an eaves height of 6.30m and a gable height of 10.44m (internal dimensions). There is
There is no basement. As a future two-storey sports hall, this will be
ends of the hall with two-storey interior extensions, with barrier-free access to the north.
in the north. On the first floor, the installations include 4 changing rooms on each side,
incl. WC and showers, a trainer's changing room incl. WC and showers, as well as a first-aid room accessible from the
hall, a first-aid room and a storage area. To the north of the hall is a
storage building with public WCs including a barrier-free toilet, a technical room and a small kiosk.
technical room and a small kiosk with a serving window and covered
and covered seating is planned. The gross floor area of the building is 70 m2 in total.
The storage room of 25 m2 serves as a storage area for sports equipment and to supply the outdoor area.
the outdoor area.

Opportunity closing date
10 October 2024
Value of contract
to be confirmed

About the buyer

Address
Darmstädter Sportstätten GmbH & Co. KG

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?