Canada - T2024-119 - Mill Creek Road & Elgin Street Watermain
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 23 April 2024
- Opportunity publication date
- 02 April 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
This project includes the construction of new 300mm transmission watermain and replacement of the existing local 150mm watermain on Mill Creek Road. Removal of the existing watermain and installation of a dual use watermain on Samuelson Street, and the installation of an interconnect watermain on Elgin Street between Linnwood Ave and Hilltop Drive. The watermains listed above are to be installed by a combination of open-cut methods, including usage of a trench box to limit the proximity to the 10” high pressure gas main, and horizontal directional drilling for the Franklin Boulevard and Mill Creek box culvert crossings. The works also include the installation of a combination air and vacuum release valve.
- Opportunity closing date
- 23 April 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Region of Waterloo CANADA
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.