Germany - Roofing and roof plumbing works, carpentry and timber construction works according to DIN 18 338, 18 334 - Award no.: 86/2021
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 18 March 2021
- Opportunity publication date
- 03 March 2021
- Value of contract
- to be confirmed
- Your guide to exporting
Description
This is an intended restricted invitation to tender according to VOB.
Stülerbau Ost - Sammlung Scharf-Gerstenberg,Schloßstraße 70 / Spandauer Damm7,14059 Berlin
Roofing and roof plumbing work, carpentry and timber construction work according to DIN 18 338, 18 334
construction site equipment:
- in compliance with the specified tree protection measures of the lower nature conservation authority
- incl. installation of a black and white plant
- Protective measures (ventilation system)
Demolition work:
- Demolition of asbestos cement shingles (by hand).
- Demolition of bitumen sheeting containing asbestos and of roof sheathing with bitumen adhesion
- Demolition of KMF-containing inter-rafter insulation in the area of the Kalabscha Gate
- Dismantling of rainwater drainage, snow guard brackets and sheet metal flashings
- Final cleaning after demolition
Roofing work:
- Counter-battening 30/50 mm, S10 nailed to rafters.
- Roof battens 40/60, S10
- Slate roofing as rectangular double roofing
- Making wall connections
- Roof connection to valley of Sahuré hall, connection to bitumen shingles
Roof plumbing work:
- Renew hanging gutters
- Renewing rainwater downpipes
- Eave strip as drip plate and gutter inlet
- Eaves strip as gutter hanging sheet
- Ventilation grids at eaves
- Edging of existing roof structures
- Renew snow guard grating
Carpentry and timber construction work
- Replacement of damaged timbers/flanging reinforcements
- Renewal of the inter-rafter insulation in the area above Kalabscha Gate
- Doubling of the valley planks in the area of the Sahuré connection
- Height compensation on rafters
- Roof sheathing on wooden rafters at the roof overhang
Waste disposal, recycling and removal
- of hazardous waste (asbestos; bitumen, KMF, wood)
- of non-hazardous waste (construction waste, industrial waste, wood, metal)
- waste documentation
Start of execution:
No later than 12 working days after receipt of the contract letter, April 2021.
Completion of services by:
09/21 according to construction schedule
The above publication serves a
s sole purpose is to provide the contracting authority with the information required by §20 Para. 4 VOB/A. It does not include a call for expressions of interest.
- Opportunity closing date
- 18 March 2021
- Value of contract
- to be confirmed
About the buyer
- Address
- Germany
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.