United States - Ring,welding,pipe j
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 11 October 2024
- Opportunity publication date
- 26 September 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
CONTACT INFORMATION|4|N743.4|WVL|717-605-1501 |amanda.l.bailey50.civ@us.navy.mil |
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8||x||x|||||
VARIATION IN QUANTITY (APR 1984)|3|0%|-5%|total contract quantity|
TIME OF DELIVERY (JUNE 1997)|20|0001|1,000|365||||||||||||||||||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo-Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040|N50286|TBD|133.2|N/A|N/A|S4306A - Material|N/A|N/A|See DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAV
Y.MIL|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|365 days after acceptance of material|365 days after acceptance of material|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333992|1,250||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|
1. Data Item A001 (inspection and Test Plan) may be waived if already on fileat NAVSUP WSS Mech.
2. NAVSUP WSS Mech will be considering past performance in the evaluation ofoffers. See Clause 252.213-7000.
3. The following proposed delivery schedule applies:
Submission of all certification data CDRLS 20 days prior to delivery.
PNSY review/acceptance of certification CDRLS after receipt
Final delivery of material (365 days)
Please quote actual delivery days
Early and incremental delivery is acceptable at no additional cost to theGovernment.
4. A variation in quantity of -5% of the total contract quantity is allowed. See FAR 52.211-16 for further details.
5. FAR 52.232-25(a)(5), entitled Prompt Payment, Constructive Acceptance ischanged from 7 days to 45 days after delivery of the supplies in accordancewith the terms and conditions of the contract.
6. This requirement has no Government source inspection. Inspection and Acceptance will occur at destination/destination.
7. This procurement is issued pursuant to Emergency Acquisition Flexibilities.
\
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=IC-23413 | | |C |131028|A| |05|
DOCUMENT REF DATA=MIL-I-23413 | | |C |021031|A| |03|
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
3. REQUIREMENTS
3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in MIL-I-23413, except as amplified or modified herein. MIL-I-23413 ordering data information is provided below:
(a) Inserts, welding, filler material, coiled and solid rings; MIL-I-23413.
(b) Class - ;1;
Style - ;B;
Type - ;MIL-82H;
NPS Size - ;1 inch;
Insert Cross Section Size - ;1/8 inch;
Bore Size - ;N/A;
Group - ;E;
Note: For Class 1, Style C, open butt-joint preformed rings, the end gap dimension must not exceed 0.030 inch (0.015 inch for Type MIL-67) and the total diametral clearance must not exceed 0.015 inch when fitted with the template in the restrained condition.
The insert must be checked on both sides.
(c) Class 5 inserts are not applicable.
(d) Bright annealing of group C and E inserts is not required.
(e) Special bright hydrogen annealing of MIL-62, MIL-82, MIL-82H, and MIL-625 inserts is not required.
(f) Minimum carbon content for group E inserts is not required.
(g) Alloy identity testing of each cut length of wire in preformed inserts and each end of each spool or coil of insert wire after final marking ;is required; .
(h) Style A coiled inserts must be furnished in accordance with MIL-I-23413.
(i) Templates must be furnished for all orders for Style B of Classes 1, 2, and 5; and for Style C of Classes 1, 2, 4, and 5. The Contractor is to provide and retain the template. All templates used for insert inspection must be made of A-6 tool steel or
other cold worked tool steel. Templates must be 0.010 + 0.000 / - 0.002 inch over the required insert bore size.
(j) Class 3 solid insert rings must be as specified on figure 2 of MIL-I-23413.
(k) Pipe Schedule Number for Class 3 rings - ;N/A; .
(l) Special ring sizes are not applicable.
(m) Cross section information for class 5 inserts is not applicable.
(n) Circumferential overlap of Class 5, Style B inserts is not applicable.
(o) ID and OD dimensions and tolerances for class 5, style D inserts are not applicable.
(p) Use of Polystyrene (loose-fill) is not approved.
(q) Special coiling conditions for class 4, style A inserts is not applicable.
(r) Maximum sulfer content is not restricted to 0.007%.
NOTE: IC-23413 Interim Change 5 is available as CSD142 in the ECDS (ElectronicContractor Data Submission) system at: https://register.nslc.navy.mil/
3.2 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing (if any) per applicable specifications is still required, but certifications are only required as listed below.
Test - Quality Conformance/Compliance Inspection
Item - ;Welding Insert;
Performance - ;MIL-I-23413 (Liquid Penetrant (PT) performance per T9074-AS-GIB-010/271);
Acceptance - ;MIL-I-23413 (PT acceptance per MIL-STD-2035);
3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government inelectronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.3.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. Requests must include the
information listed below.
a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this configuration.
c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to theoperational use of the product.
d. Information about remedial action being taken to prevent reoccurrence of the non-conformance.
3.3.2 Requests for Waivers/Deviations for NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.3.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II), and change justification.
b. A complete description of the change to be made and the need for that change.
c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of theproduct.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the engineeringchange.
3.4 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.5 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.6 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.6.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.7 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.7.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government to determine the system's effectiveness in meeting the quality requirements
established in the Contract/Purchase Order.
3.7.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities
available for audit by the contracting Officer or his authorized representative.
3.7.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.7.4 This contract provides for the performance of Government Quality Assurance at destination. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer.
3.7.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO.
3.8 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.8.1 The supplier's gages, measuring and test equipment must be made available for use by the Government when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for
operations of such devices and for verification of their accuracy and condition.
3.8.2 All documents and reference data applicable to this contract must be available for review by the Government. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the
Government.
3.9 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Any purchasing documents to a subcontractor must cite the
applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility,
applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Prime Contractor who will notify the PCO so that appropriate
planning for Government inspection can be accomplished.
3.9.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.9.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.9.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.9.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be
established. Records of this effort must be available for review by the government.
3.9.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.10 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.10.1 Visual examination upon receipt to detect damage during transit.
3.10.2 Inspection for completeness and proper type.
3.10.3 Verification of material quality received.
3.10.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.10.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.10.6 Identification and protection from improper use or disposition.
3.10.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity
for withholding the material from use.
3.10.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.10.9 Material returned to the contractor must be handled as GFM.
3.11 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.11.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.12 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the unit containers. This traceability marking must provide
direct traceability to the material's chemical composition and mechanical properties certification data. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.12.1 Permanent markings are not required for consumable material (weld filler material, etc.). Traceability must be by a label attached to each unit container. The unit container identification label must include, in addition to the contract number and the
National Stock Number (NSN), all markings required for identity and traceability. Each container in the lot must contain material from the same traceability number or heat/lot, as defined in the applicable specification. Identification marking must be the Type
designation in accordance with the applicable detail specification.
3.12.2 For covered welding electrodes, the Type designation or classification number must also be applied to the electrode covering within the space 2 1/2 inches from the grip end of the electrode. The marking must consist of at least one complete type
designation or two or more partial type designations that can be read or positively interpreted as the intended designation. The two partial type designations must consist of at least the top portion and the bottom portion of the designation.
3.12.3 Individual cut length bare welding rods must be identified in accordance with the applicable commodity specification. In the absence of specific specification marking requirements, at least one legible type designation/classification number must be
applied to each rod, either by stamping or by tagging (i.e. flag tagging).
3.12.4 Spool and Coil weld filler material must be identified in accordance with the applicable commodity specification.
3.13 Material Certification - In addition to the certification data requirements specified in the detailed specification invoked in this contract, the following material certification requirements apply:
3.13.1 See CDRL DI-MISC-81020 (QUALITY CONFORMANCE/REQUIRED TESTS) - Certification is required for each test performed under Quality Conformance listed in the applicable paragraph of the military specification. (or Table 5 of AWS specifications).
3.13.2 In addition to Quantitative Chemical and Mechanical Properties, (as required by the applicable specification), the material certification test reports must include the class, form, condition, grade, type and finish, as applicable, of the material
supplied.
3.13.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.13.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "To the best of our knowledge" or "We believe the information contained herein is true" are not acceptable.
3.13.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.14 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance:
3.14.1 All welding electrodes/inserts must be sample inspected in accordance with the applicable welding electrode/insert specification, except the unit containers must be 100% inspected for traceability marking and that the markings are legible.
3.14.2 All data concerning material verification (chemical and mechanical properties), traceability (material certifications to material/unit container marking) and nondestructive test (NDT) certifications for material must be 100% inspected. The
certification test reports must be 100% inspected for completeness and legibility, and that there is a test report for each heat or lot of material being shipped.
3.15 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed
satisfactorily.
9. Contractor's or authorized personnel's signature.
4. QUALITY ASSURANCE
4.1 Notes to the Contractor -
4.1.1 The Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. The departure must be
considered a nonconformance and be submitted to the PCO for disposition.
4.1.2 The Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A record of these departures, traceable to the applicable part number and
contract number must be submitted to the PCO.
4.1.3 The Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements.
4.1.4 The Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions, and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at:
https://register.nslc.navy.mil/
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item.
6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS.
6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the
ship, or unacceptable risk of personal injury or loss of life.
6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a
critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation).
6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements.
6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's
commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program.
6.1.6 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that he material supplied
conforms to the specified requirements.
6.1.7 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits,
center-punches, scribes, and tool marks). Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order.
6.1.8 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated.
6.1.9 Verification - An examination performed to determine compliance with a specific requirement.
6.1.10 A nonconformance is defined as affecting or violating the following:
- The requirements of this contract/purchase order.
- Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.).
- Contractually invoked federal, military, or commercial specifications and/or standards.
- Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government.
6.1.11 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is
or after repair by an approved method.
6.1.12 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of
time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
6.1.13 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety.
6.1.14 Major Waiver/Deviation - This waiver/deviation consists of a departure involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability,
or Durability of the item or its repair parts
- Health or Safety
- Effective Use or Operation
- Weight, Stability, or Structural Integrity
- System design parameters as schematics, flows, pressures or temperatures
- Compartment arrangements or assigned function
6.1.15 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major.
6.1.16 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item.
6.1.17 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval.
6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information
contained on those documents and drawings.
6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:
A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only.
C... distribution authorized to US Government agencies and their contractors.
D... distribution authorized to DoD and DoD contractors only.
E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T.
X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161.
6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)
(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/
A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410P, 101 Strauss Avenue
Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for
certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVSUP-WSS
Code 87321
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:
Commanding Officer
NAVSUP-WSS
Code 009
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Commanding Officer
NAVSUP-WSS
Code 1 Support Branch
700 Robbins Avenue
Philadelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.
6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience
only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order.
; - 10/20/2016 - Updated ECDS URL
- Dec 17 2011 - Moved Quality Assurance Text location for Readability
- Apr 15 2009 - Clarified the sample size for large and small lot sizes
- Jan 19 2011 - Added notification of DCMA upon contract award
- May 02 2009 - Added Lubricants and Sealants to the C of C
- Aug 27 2014 - Took out contractor's phone number requirement
- May 16 2013 - Removed GSI from this Material.
- Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.;
DATE OF FIRST SUBMISSION=ASREQ
Paragraph 10.4 of DI-QCIC-81110 does not apply.
DATE OF FIRST SUBMISSION=ASREQ
Paragraph 10.4 of DI-QCIC-81110 does not apply.
DATE OF FIRST SUBMISSION=ASREQ
Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.
Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow).
Enter in WAWF as follows:
"Ship to" N50286
"Inspect by" N39040
"Accept by" N39040
and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil
No material is to be shipped prior to the receipt of Acceptance.
- Opportunity closing date
- 11 October 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- NAVSUP WEAPON SYSTEMS SUPPORT MECH
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.