Philippines - RFQ No. 28-2018 (4 Single Projects + 17 Package with 43 Projects=47 Projects)
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 20 November 2018
- Opportunity publication date
- 14 November 2018
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Republic of the Philippines
Cordillera Administrative Region
Provincial Local Government Unit of Ifugao
BIDS AND AWARDS COMMITTEE - INFRA
3rd Floor PEO Bldg., Capitol Compound
Lagawe, Ifugao
Email Ad.: bacifugao@gmail.com
REQUEST FOR QUOTATION
(Small Value Procurement)
RFQ No. 28-2018
Bid Opening: November 20, 2018
To :
Address :
Date :
November 13, 2018
Subject :
Request for Quotations
1) The Provincial Local Government Unit of Ifugao have allocated the following funds listed below and intends to apply the funds to payments under the following contracts for which this request is issued:
Name of Contract
Location
Source of Fund
Brief Description
1 Bahag - namal FMR Improvement and Riprap (Hallagan Section)
Liwon, Asipulo, Ifugao
2018 - 20% DF
road improvement and riprap
2 Hallong Road Improvement
Dalligan, Kiangan, Ifugao
2018 - 20% DF
excavation and grouted riprap
3 Provincial Road Riprap to IFSU, Pob. West
Pob. West, Lagawe, Ifugao
2018 - 20% DF
construction of slope protection
4 Construction of Canal Lining
Lawig, Lamut, Ifugao
2018 - 20% DF
construction of chb canal lining with total length of 111.2m
5 Package 142-2018-SVP Concrete Riprap at Mid-Section of Bunhian - Majlong - Buwag FMR
Aguinaldo, Ifugao
2018 - 20% DF
structure excavation, grouted riprap, RCCP and PCCP
Municipal Ground Improvement (Gotad Prize)
ground improvement
6 Package 143-2018-SVP Haitan Ubao Road Riprap
Aguinaldo, Ifugao
2017 - Supplemental Budget
construction of single barrel box culvert
Haitan Ubao Road Riprap
2015 - 20% DF (PO No. 2015-168R)
7 Package 144-2018-SVP Haliap Latrine Construction
Asipulo, Ifugao
2018 - 20% DF
construction of latrine
Guihingon Hanging Bridge Finishing, Panubtuban
2016 - Supplemental Budget
installation of steel checkered plate matting
8 Package 145-2018-SVP Viewpoint Water Control Improvement
Banaue, Ifugao
2018 - 20% DF
construction of grouted riprap with L=17.5m
Viewpoint Akchog - CIS Rehabilitation
constrhuction of grouted riprap with drainage canal L=40.2m
9 Package 146-2018-SVP Amganad - Poitan Road Opening and Improvement
Banaue, Ifugao
2018 - 20% DF
construction of crib wall
Amganad - Poitan Brgy. Road Improvement
construction of crib wall
10 Package 147-2018-SVP Reading Center Slope Protection Improvement
Hingyon, Ifugao
2017 - PDRRM Fund
construction of grouted riprap
Mabulon Drainage Canal Construction
construction of canal
11 Package 148-2018-SVP Pahadan Monggayang Pathway Rehab. & Drainage Construction, Cab. North
Hingyon, Ifugao
2018 - 20% DF
constrhuction of drainage canal and concrete pathway
Guilot Drainage w/ Riprap
construction of drainage canal
Sitio Tudani MPP Brgy. Cababuyan South
construction of MPP
12 Package 149-2018-SVP Magok - Olalagon Sledge Trail Improvement
Hungduan, Ifugao
2018 - 20% DF
excavation, form and concrete works
Maggok - Puloy Sledge Trail Improvement
excavation, form and concrete works
Maggoc - Tugawe Carabao Trail Construction
excavation, form and concrete works
13 Package 150-2018-SVP Lubbi Footbridge Bangbang
Hungduan, Ifugao
2016 - 20% DF
construction of reinf. concrete bridge
Barangay Hapao for Dul-ing Drainage Construction
2018 - 20% DF
drainage construction
14 Package 151-2018-SVP Brgy. Hablang Pathway Construction, Maggok
Hungduan, Ifugao
2018 - 20% DF
structure excavation, form works and concrete works
Gulon CIS Concreting, Maggok
structure excavation, grouted riprap, form works and concrete works
15 Package 152-2018-SVP Panggawan Cave Improvement
Kiangan, Ifugao
2018 - 20% DF
concrete pathway
Bolog to Maalig Canal Improvement
covered canal, flooring and removable concrete covers
Hoba Lana FMR Concreting
excavation, form, aggregate base course and PCCP
16 Package 153-2018-SVP Momma Road Improvement Francis Manuel Section, Tupaya
Lagawe, Ifugao
2018 - 20% DF
road improvement
FMR Improvement at Tupaya
road improvement
Momma to Mabbog Road Improvement
road improvement
Brgy. Tupaya Fencing Barangay Health Station
fencing
17 Package 154-2018-SVP Poblacion East Road Concreting
Lamut, Ifugao
2016 - 20% DF
construction of PCCP
Poblacion West Lamut Concreting
2018 - 20% DF
construction of PCCP
Road Improvement at Pugol
construction of PCCP
18 Package 155-2018-SVP Mayoyao Proper - Chapella Pathway Concreting
Mayoyao, Ifugao
2018 - 20% DF
pathway concreting
Rehabilitation of Pfalenghong - Nategaan Pathway Concreting, Banhal
pathway concreting
Construction of MPP at Bongan, Mayoyao
concrete pathway
19 Package 156-2018-SVP Construction of Flood Control at Guala Tulaed, Mayoyao
Mayoyao, Ifugao
2018 - 20% DF
construction of grouted riprap
Construction of MPP at Ayangan, Mayoyao
concreting of MPP
Improvement of CIS at Bawi Mongol, Mayoyao
concreting of canal lining
20 Package 157-2018-SVP Poblacion - Onagol Canal Drainage Construction
Mayoyao, Ifugao
2018 - 20% DF
grouted riprap with concrete canal lining
Rehab. of Aygunod Pathway with Railings to Brgy. Hall Poblacion, Mayoyao
concrete pathway and railings installation
Improvement of Brgy. Health Center at Buninan, Mayoyao
grouted riprap
21 Package 158-2018-SVP Tawang - Tuhdaw FMR Expansion
Tinoc, Ifugao
2018 - 20% DF
FMR expansion
Rehabilitation of Malinghi Water System, Gumhang
rehabilitation of water system
2) The Provincial Local Government Unit of Ifugao now invites sealed quotations from eligible bidders for the:
Name of Contract
ABC
Contract Duration (CD) Cost of Bid Documents 1 Bahag - namal FMR Improvement and Riprap (Hallagan Section)
962,193.19
39 1,000.00 2 Hallong Road Improvement
968,575.61
61 1,000.00 3 Provincial Road Riprap to IFSU, Pob. West
955,166.53
34 1,000.00 4 Construction of Canal Lining
291,270.08
30 500.00 5 Package 142-2018-SVP Concrete Riprap at Mid-Section of Bunhian - Majlong - Buwag FMR
485,447.83
54.5 1,000.00
Municipal Ground Improvement (Gotad Prize)
347,704.75
833,152.58
6 Package 143-2018-SVP Haitan Ubao Road Riprap
481,972.33
54.5 500.00
Haitan Ubao Road Riprap
481,972.33
7 Package 144-2018-SVP Haliap Latrine Construction
97,623.00
28 500.00
Guihingon Hanging Bridge Finishing, Panubtuban
48,825.29
146,448.29
8 Package 145-2018-SVP Viewpoint Water Control Improvement
292,042.99
36 500.00
Viewpoint Akchog - CIS Rehabilitation
96,233.50
388,276.49
9 Package 146-2018-SVP Amganad - Poitan Road Opening and Improvement
388,720.14
63 1,000.00
Amganad - Poitan Brgy. Road Improvement
584,122.95
972,843.09
10 Package 147-2018-SVP Reading Center Slope Protection Improvement
192,425.83
42 500.00
Mabulon Drainage Canal Construction
289,802.51
482,228.34
11 Package 148-2018-SVP Pahadan Monggayang Pathway Rehab. & Drainage Construction, Cab. North
145,243.79
49 500.00
Guilot Drainage w/ Riprap
193,629.42
Sitio Tudani MPP Brgy. Cababuyan South
97,242.52
436,115.73
12 Package 149-2018-SVP Magok - Olalagon Sledge Trail Improvement
95,048.76
32 500.00
Maggok - Puloy Sledge Trail Improvement
141,013.29
Maggoc - Tugawe Carabao Trail Construction
95,449.73
331,511.78
13 Package 150-2018-SVP Lubbi Footbridge Bangbang
291,754.97
45 500.00
Barangay Hapao for Dul-ing Drainage Construction
97,559.87
389,314.84
14 Package 151-2018-SVP Brgy. Hablang Pathway Construction, Maggok
48,131.83
44 500.00
Gulon CIS Concreting, Maggok
192,942.75
241,074.58
15 Package 152-2018-SVP Panggawan Cave Improvement
96,524.07
54 500.00
Bolog to Maalig Canal Improvement
97,064.93
Hoba Lana FMR Concreting
192,401.00
385,990.00
16 Package 153-2018-SVP Momma Road Improvement Francis Manuel Section, Tupaya
194,038.66
53 500.00
FMR Improvement at Tupaya
96,170.34
Momma to Mabbog Road Improvement
96,460.34
Brgy. Tupaya Fencing Barangay Health Station
68,555.61
455,224.95
17 Package 154-2018-SVP Poblacion East Road Concreting
97,672.02
73 500.00
Poblacion West Lamut Concreting
195,169.18
Road Improvement at Pugol
96,195.46
389,036.66
18 Package 155-2018-SVP Mayoyao Proper - Chapella Pathway Concreting
77,028.93
30 500.00
Rehabilitation of Pfalenghong - Nategaan Pathway Concreting, Banhal
97,194.92
Construction of MPP at Bongan, Mayoyao
97,129.36
271,353.21
19 Package 156-2018-SVP Construction of Flood Control at Guala Tulaed, Mayoyao
96,887.09
30 500.00
Construction of MPP at Ayangan, Mayoyao
96,651.84
Improvement of CIS at Bawi Mongol, Mayoyao
97,046.37
290,585.30
20 Package 157-2018-SVP Poblacion - Onagol Canal Drainage Construction
96,338.00
30 500.00
Rehab. of Aygunod Pathway with Railings to Brgy. Hall Poblacion, Mayoyao
96,728.21
Improvement of Brgy. Health Center at Buninan, Mayoyao
96,892.05
289,958.26
21 Package 158-2018-SVP Tawang - Tuhdaw FMR Expansion
96,156.99
46 500.00
Rehabilitation of Malinghi Water System, Gumhang
289,031.85
385,188.84
3) The Bill of Quantities provides a concise description of the item and the quantity required along with the construction schedule. A set of technical specifications and drawings are attached.
4) Prices indicated in the Bill of Quantities shall include unit prices and the total price under the contract.
5) Prices quoted shall be fixed. Quotation submitted with an adjustable price will be treated as non-responsive and will be rejected. Quotations for each project shall not exceed the ABC.
6) Quotation must be hand-carried to the address indicated in paragraph 16, complete with the following requirements duly accomplished and signed and/or initialed.
6.1) Proof of Invitation (RFQ)
6.2) Lump Quotation Form (Document 1a)
6.3) Bill of Quantities (Document 1b)
6.4) Detailed Bid Quotation (Document 1c)
6.5) Drawings/ Plans (Document 2)
6.6) Technical Specifications (Document 3)
6.7) Scope of Works (Document 4)
6.8) Schedule of Construction (Document 5)
6.9) Instruction in Submitting Quotations (ISQ) (Document 6)
6.10. Site Visit Certificate (Document 8)
6.11) Addenda/Supplemental Bid/Bulletin, if any
7) Quotation, as well as correspondence and documents related thereto, shall be written in the English Language.
8) A complete set of Quotation Documents in English may be purchased by interested bidders upon presentation of the proof of invitation by the Provincial Local Government Unit (PLGU) and payment of a non-refundable fee of the corresponding amount stated in paragraph 2 except for instances when bidding documents fees may be refunded to the bidder. Purchasing/ Issuance of bid documents is available during office hours from November 13, 2018 to November 20, 2018 until 9:00 A.M. The bidding documents shall be received personally by the bidder or his authorized representative during office hours at the BAC-INFRA Office, 3rd Floor, PEO Building, Capitol Compound, Lagawe, Ifugao.
9) Quotations must be received by the Procuring Entity not later than 9:00 A.M. of November 20, 2018.
10) Validity of quotations should be a period of one hundred twenty (120) calendar days after the date of the deadline for submission of quotations.
11) The PLGU supplied construction schedule should confirm that the works will be completed within the period stated in the Schedule of Requirements and in the quantities specified in the Bill of Quantities.
12) It is the intent of the Procuring Entity to evaluate quotations and recommend award the contract to the bidder that submitted the Lowest Calculated Responsive Quotation for such work.
13) A decision to award or not to award the contract(s) shall be made within Nineteen (19) calendar days from the deadline of submission of quotations.
14) The method and conditions of payment to the contractor under this contract shall be made upon 100% work accomplishment.
15) The Procuring Entity shall inspect and/or test the works to confirm their conformity to the contract specifications. If any of the works inspected or tested failed to conform to the specifications, the Procuring Entity may reject the work(s) and the contractor shall replace/remedy the work(s) to meet the specifications required.
16) Clarification on this Request for Quotations must be addressed to the Procuring Entity in writing or by email at the address below not later than five (5) calendar days before the deadline set for the submission and receipt of bids. The Procuring Entity shall respond in writing not later than three (3) days prior to the deadline for the submission of quotations.
The Chairperson
Bids and Awards Committee - Infra
3rd Floor, PEO Building, Capitol Compound
Lagawe, Ifugao
17) The duly authorized representative shall, at all times, present a special power of attorney or SPA to the BAC Secretariat upon the submission of the bidding documents, otherwise said bidding documents shall not be accepted.
18) The Provincial Government of Ifugao reserves the right to accept or reject any or all Bids, to annul the bidding process at any time prior to contract award, waive minor defects and accepts the Bid most advantageous to the Provincial Government without thereby incurring any liability to affected Bidder or Bidders.
Thank you,
ALBERT D. PAWINGI
BAC Chairperson
- Opportunity closing date
- 20 November 2018
- Value of contract
- to be confirmed
About the buyer
- Address
- Philippines
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.