Canada - RFP202410 Hot Springs Boiler

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 December 2024
Opportunity publication date
15 November 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Nakusp Hot Springs were built in 1974 and have not been substantially changed since then. The current diesel boiler is at the end of its service life. This RFP is for upgrading the boiler to a liquid-to-liquid heat pump. The heat pump should use the hot springs water as its source and tie into the existing domestic hot water plumbing and the radiant floor heating. The Nakusp Hot Springs has a natural source of hot water. It flows in the building at about 150 LPM at a range of 32C – 47C depending on the point in the plumbing.There is a circulation loop of 50mm pipe from the hot springs water exit tank to the mechanical room. It currently feeds a heat exchanger that pre-warms the domestic hot water supply but there is additional capacity available. The water in this loop is approximately 32C.The main hot springs water passes within 3m of the mechanical room in an exposed pipe running along the basement ceiling. The water in the pipe is about 47C and there is some capacity to use the water for the heat pump.The maximum flow of either of these pipes is 150 LPM although there is not this amount available for heating from the hot springs source pipe as most of it enters the hot springs pools.The existing boiler and hot water tanks are shown in Schedule A. The current boiler is a Heiztechnik GmbH Wetzlar G305-7 with a maximum output of 393,000 BTU/hr. It is used in conjunction with two Allied Technologies “Super Hot” EPP-120 heat exchanger tanks to preheat the water supply.Hot water demand comes from twelve showers, five bathroom sinks, three utility sinks, and the radiant floor system inside the building.The proponent is responsible for verifying the suitability of any existing equipment and hot water demand.The ideal timeline will see the heat pump installed during the spring shut down in late April 2025 if a significant service interruption is required. An alternate proposal may be accepted if it has an equivalent energy efficiency.

Opportunity closing date
06 December 2024
Value of contract
to be confirmed

About the buyer

Address
Village of Nakusp

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?