Germany - Rental of Active Load-Pull Measurement Upgrade for mm-Wave Characterization

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
16 September 2024
Opportunity publication date
30 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

RF measurement system upgrade for active load-pull measurement in mm-wave frequency range. The upgrade includes hardware and software solutions that are compatible with the existing RF measurement equipment at Fraunhofer IPMS CNT. The upgrade enables reliable and accurate power-controlled S-parameters measurement in waveguide frequency bands such as WR6.5 (110 ? 170 GHz) or WR4.3 (170 ? 260 GHz). The upgrade also enables large-signal measurement with active load-pull technique for large-signal characterization in non-50-? environments.

Opportunity closing date
16 September 2024
Value of contract
to be confirmed

About the buyer

Address
Fraunhofer Institut Photonische Mikrosysteme IPMS

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?