Canada - P24-098 - Architectural & Engineering Services – Prince George City Hall HVAC Replacement

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
26 November 2024
Opportunity publication date
25 October 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

City of Prince George (the “City) is seeking proposals from qualified architectural and engineering firms for the Prince George City Hall HVAC Replacement. The existing City Hall building consists of three (3) components; a 5-storey tower, a 2-storey service block consisting of council chambers and service center, and a single storey ‘annex’ which is connected to the rest of the building via a corridor link.  The original building was constructed in 1965 with major additions completed in 1975, 1988 and 2000. It is the intent of the City to replace the HVAC system in totality with new.  The new HVAC system may include VAV air handling systems throughout the office tower and service areas, and new air handling units provided for council chambers and committee rooms.  Dx Cooling and Central District Heating System heating may be used in all AHU’s to provide air conditioning and heating.  Radiation zones/valves will need to be adjusted to accommodate the new design. New BMCS (Building Management Control system) to be designed to meet City standards is also in scope. The current mechanical systems are located within the basement mechanical room and also on rooftop(s).  The City anticipates the new units to be rooftop based, with minimal equipment being installed in the basement mechanical room.  As part of the potential for rooftop units, a roofing replacement on all areas of the building is also in scope.  The fire alarm system replacement/upgrade is also deemed in scope. CONSTRAINTS AND CHALLENGES:  Budget control and management is of significant importance in the completion of this contract. Utilization of innovative design to reduce the overall cost of the contract is critical, and design options provided by the Consultant will be challenged to ensure economies and efficiencies are identified.These facilities will not need to be designed to Net Zero Carbon, however, it is the intent of the HVAC project to maximize the reduction in GHG and energy consumption. Alternative energy sources can be considered.SUMMARY OF REQUIREMENTS: Design to meet the requirements of the functional programs, applicable current codes, and administration phase of the separate corresponding construction contract for the design of these facilities.     Work includes, but is not limited to:Update and provide recommendations on existing reports (including cost estimate)Design options to meet functional requirements including energy modeling and life cycle costs for each optionCompletion of Tender Documents.Construction Tender – addenda and site walk throughConstruction AdministrationPost Construction – Warranty Services

Opportunity closing date
26 November 2024
Value of contract
to be confirmed

About the buyer

Address
City of Prince George

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?