Poland - Motorway and road construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
17 December 2019
Opportunity publication date
03 October 2019
Category
45233100: Construction work for highways, roads
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The subject matter of the contract is: Design and construction of the S19 expressway from Rzeszów Południe junction (without junction) to Babica junction (with junction) with a length of approx. 10.3 km.The subject of the contract is the design and execution of construction works for a section of the S19 expressway from Rzeszów Południe junction (without junction) to Babica junction (with junction), approximately 10.3 km long, on a section of approximately 11+400 km to 21+671.00 km. The contract should include the design and construction of, among others:- expressway with a cross-section of 2 x 2, lane width of 3.5 m with 2.5 m emergency lanes and 5 m dividing lane,- 2 MOPs and Lutoryż,- Babica junction,- engineering facilities including a two-nave road tunnel with equipment,- tunnel management centre with equipment,- technical buildings by the tunnel with equipment,- construction of a collision-free crossing within DK19 at the crossing with railway line No. 106,- reconstruction of existing roads in terms of collision with S19, - additional roadways, - hardening of the area for maintenance purposes, - technological/technical roads, - construction or reconstruction of infrastructure for pedestrians and cyclists, - environmental protection facilities, including animal crossings, - infrastructure for the needs of facilities located along the expressway, including the expressway:- power supply and lighting networks, - water supply networks, - sanitary sewage treatment networks and devices, - rainwater drainage and pre-treatment devices, - water pumping stations, - technological channel, and other, - reconstruction of conflicting devices and networks of existing infrastructure under and above ground, - demolition of buildings and buildings, - road marking and road traffic safety device, - traffic management system on the road and in the tunnel, - other preparatory, auxiliary and cleaning works.More than EUR 5 548 000.

Opportunity closing date
17 December 2019
Value of contract
to be confirmed

About the buyer

Address
Generalna Dyrekcja Dróg Krajowych i Autostrad, ul. Wronia 53, 00-874 Warszawa, prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Rzeszowie ul. Legionów 20 Rzeszów 35-959 Poland
Contact
sekretariat_rzeszow@gddkia.gov.pl

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?