United States - Maintenance, Repair, and Preservation of YT-808 ROH

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
09 September 2024
Opportunity publication date
06 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

View Changes The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF), Bremerton, Washington intends to award a stand-alone Firm-Fixed-Price contract to accomplish maintenance, repair, and preservation of one (1) Harbor Tug, Medium (YT-808 Rainier).
The YT-808 characteristics are 90 FT length, 38 FT length, 16 FT Draft, 494 LT displacement, 438 L Tons Light Load, 4 years of age, and hull material is steel.
The Contractor's facility must possess the capability of accommodating one (1) Harbor Tug, Medium (YT-808 Rainier) with the dimensions as stated above. To facilitate proper government oversight, the facility shall be located in the Puget Sound, WA region. For this procurement, the Puget Sound, WA region is defined as the West Coast of the continental US, starting from Olympia, WA and extending northward to Bellingham, WA.
Scope Overview: Coordinate with the Contracting Officer, via the Contracting Officer’s Representative (COR) to deliver the vessel to the Contractor’s facility. The Government will transport the vessel to the Contractor’s repair facility. Upon docking vessel, wash, and clean vessel. Replace zinc anodes. Blast and Preserve underwater hull and freeboard, bulwarks, and handrails. Blast and Preserve main deck, 1st deck, and 2nd deck non-skid. Perform hull and freeboard Ultrasonic Test (UT) inspections. Perform hull and freeboard, main deck, 1st deck, and 2nd deck Visual Inspections (VT). Repair hull and winch valves. Repair deckhouse expansion joint. Test and preserve CHT, ballast, potable water, fuel oil, waste oil and day tanks. Replace deck winch, mast, and brow systems hydraulic hoses. Accomplish winch control piping modification (YT-0104D). Undock the vessel. Arrange and coordinate the delivery of the vessel back to the Government with the Contracting Officer via the COR. Upon completion of all work the Government will take custody of the vessel.
The vessel availability is scheduled to be 19 December 2024 to 18 March 2025.
This is a 100% Small Business set-aside under the North American Industry Classification System (NAICS) 336611, size standard 1,300 employees. All offerors must be registered with the System for Award Management (SAM) to receive award of Government contracts. Offerors are advised also that SAM representations and certifications can be completed electronically via the System for Award Management website at https://www.sam.gov.

Opportunity closing date
09 September 2024
Value of contract
to be confirmed

About the buyer

Address
PUGET SOUND NAVAL SHIPYARD IMF

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?