1.1 Scope of work

The scope of work to be performed by the CONTRACTOR of "Lot 35A - Demolition and Concrete Work for the Replacement of the Funicular Railway" includes, but is not limited to, the supply of all labor, materials, equipment, materials and services required to complete a complete and functional structure. Plans and Specifications can be found in Appendices C "STRUCTURAL QUOTATIONS" and D "PLANS FOR TENDERING".

Also included, but not limited to:

- All demolition work shown on the Plans and Specifications and necessary for the construction work;

- All surveying work, slab and/or wall radiographs and any other measurements required to complete the work;

- Workers' travel on site to reach their place of work, board and travel expenses for all workers and subcontractors;

- Scaffolding and other temporary installations required for the work;

- Lifting plan, work procedures and temporary installation certificates signed and sealed by an OIQ member engineer, if required;

- Development of work methods;

- Repair of walls, ceilings and floors following demolition work;

- Transportation of all materials and equipment;

- Protection of all adjoining structures and marking of structures when requested/required;

- Management of noise, dust, concrete spalls, laitance, water or any other contaminant specific to its work;

- Control, treatment and disposal of water and sludge resulting from demolition, drilling, cleaning, concreting and all other activities;

- Attendance at weekly meetings;

- All drilling, chemical or mechanical anchoring in connection with concrete work;

- Fine coordination with the contractor responsible for replacing the funicular for all works under this AO;

- Verification with a surveyor of the elements integrated into the formwork on request;

- All sleeves where existing or future mechanical networks are present in the concreted structures;

- Shop drawings and other samples as required;

- Costs related to wet curing when required;

- Saw drafts when required;

- Waste disposal to skips provided;

- Temporary shoring when required;

- All mobilization/demobilization costs inherent in the phasing of the worksite;

- All rework and finishing required for the application of future finishes.

Opportunity closing date
13 December 2024
Value of contract
to be confirmed

About the buyer

Address
Parc olympique

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?