Germany - In order to clear the construction site and develop the planned new building 145, the

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
09 September 2024
Opportunity publication date
10 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The construction of a new access road is planned to clear the construction site and develop the planned new building 145. New cable routes (cable ducts and cable conduits) and; new street lighting are planned; New medium-voltage, data and telecommunications cables are to be installed as part of this construction measure; In addition, existing installations must be dismantled for the execution of the planned measures and; site clearance.Electrical work; Cable DIN VDE 0276-620 (VDE 0276-620), Uo\/U 12\/20 kV, rated voltage Um 24 kV, N2XSY 1; x 150 RM\/25, Cu number 1723, lay in existing pipes 429m; Cable DIN VDE 0276-603 (VDE 0276-603) NYCY 16 x 2.5 RE\/6, Cu number 451, lay in existing pipes\/underfloor ducts. 1287m; existing cable DIN VDE 0276-620 (VDE 0276-620), Uo\/U 12\/20 kV, rated voltage Um 24; kV, N2XSY 1 x 150 RM\/25, copper number 1723, pull back, shorten and lay in existing pipes. 867 m; Cable DIN VDE 0276-620 11 x 150 RM\/25, copper number 1723, connect to transformers \/ MS-; switchgear incl. cable termination \/ angled connector \/ etc. and necessary connecting means; 18 pc; Cover of a cable pulling shaft, concreted or paved, single or split in two,; dimensions up to L x W 1,600 x 1,000 mm open for cable pulling work, store shaft cover temporarily,; secure and reinstall. 43St; Temporary cable bridge, for power supply, telecommunication and data cables, clearance height; up to 3 m, usable width over 3 to 4 m, as path span, incl. collision protection, required; signage and accessories, supply, erect, maintain for at least the entire construction period and dismantle \/ clear.: 50m; cable DIN VDE 0276-620 (VDE 0276-620), Uo\/U 12\/20 kV, rated voltage Um 24 kV, N2XSY 1; x 95 RM\/16, Cu number 1094, dismantle and dispose of professionally, against proof 960m; Cables DIN VDE 0276-620 (VDE 0276-620), Uo\/U 12\/20 kV, rated voltage Um 24 kV, N2XSY 1; x 95 RM\/16, copper number 1094, dismantle and dispose of professionally, against proof 960m; search \/ pick-up of existing cables, cable routes, etc. Cables, cable routes, etc. in the outdoor area to determine the exact; Cable routes and functions: 50h; Schedule:; see construction schedule; OP-999-Erschließstr. zG145_Bauzeitenplan_Stand 06.08.2024; Start of construction: CW 42 - 2024; Clear site: CW 43 2024; Demolition of retaining wall: CW 44 2024; Division dismantling: CW 45 2024; Wastewater sewer CW 44 2024; Stormwater sewer: CW 45 2024; Construction of retaining wall: CW 47 2024; Drinking water pipeline: CW 48 2024; Gas pipeline: CW 48 2024; Construction of empty conduit route: CW 49 - 2024; Road construction: CW 50 - 2024; Paving work: CW 3 - 2025; Handover: CW 8 - 2025

Opportunity closing date
09 September 2024
Value of contract
to be confirmed

About the buyer

Address
Deutsches Zentrum für Luft-und Raumfahrt e.V. (DLR)

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?