Germany - Gardening and landscaping work: Renovation with partial demolition of existing buildings, new construction Sp
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 07 October 2024
- Opportunity publication date
- 07 September 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Garden and landscaping work: Renovation with partial demolition of the existing area, new construction of play areas with paths and planting, new construction of a covered seating area with planting and new construction of a fitness trail with paths, seating areas and planting including trees and meadow hollows; on the small area to the north, the extensive woodland planting will be cleared and the existing trees will be cleared. The central element will be a seating area with a canopy, bench and seating group consisting of a table with a game board and four fixed chairs. A new connecting path made of wood chips with two more benches completes the offer. The remaining areas will be planted with flowering shrubs and ground cover; The meadow area between the play street and the school grounds will be upgraded to a green corridor with fitness and exercise facilities as well as seating and places to linger. To this end, the meadow area will first be cleared and the area remodeled in accordance with the meadow hollows envisaged in the plans. The existing meadow swale will be deepened to accommodate the rainwater from the adjacent play street; a curved pathway will be created to access the area. Various fitness stations with different equipment and seating will be arranged along this and the "Kleewasem" play street. Furthermore, a bicycle parking area with bicycle racks will be created in the south of the area; The existing wooded area in the south of the meadow area will be extended. Further wooded islands will be created towards the schoolyard and sports hall. In addition, 11 deciduous trees will be planted in the area. The remaining green areas will be seeded and developed as meadows. The existing equipment and the various areas on the existing playground will initially be dismantled. The existing large net pyramid (from 2019) will be retained. The trees and shrubs framing the playground are to be retained and supplemented with flowering shrubs; the existing access points to the playground will be retained in their current location, but will be converted to make them barrier-free. In addition, a third entrance will be added to the north of the playground area. A curved path crosses the playground lengthways and connects the new play areas with each other; Equipment elements include: ? Triple swing with different swing seats; ? ? play tower with roof, platforms of different heights and different ways of climbing up and down; ? integrative sand play area with low platform and small house; A small square area with benches and table forms the center. The vegetation areas between the play areas are laid out as lawns. In some areas, shrub plantings are added as space-structuring elements.
- Opportunity closing date
- 07 October 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadt Offenbach am Main
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.