United States - G005--Gerofit Program Service Agreement

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 November 2024
Opportunity publication date
06 November 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

E.2 INSTRUCTIONS TO QUOTERS

SITE VISIT
Quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost and/or the contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. The site visits will be conducted on a mutually agreeable date as requested.

QUOTE SUBMISSION
Quoters shall submit their quote via email to Serina Black at Serina.Black1@va.gov by 3:00 PM, EST, Wednesday, November 20th, 2024. Quotes shall be assembled by the following Sections; each section shall be easily identified.

Section A - Quote Form (Standard Form 1449)
Signed and dated, include the North American Industry Classification System (NAICS) code and small business size standard in Block 10. Data Universal Numbering System (DUNS) Number shall be entered in the block with the Quoters name and address.

Section B Pricing
Pricing shall be submitted as requested in the Schedule of Services. Total price will be evaluated by the Government. Proposed price should reflect a clear understanding of the requirements and is consistent with the various elements of the quote.

Section C Quoters Representations and Certifications
A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the quoter shall complete electronically). A quoter shall complete only paragraph (b) of this provision if the quoter has completed the annual representations and certifications electronically at www.sam.gov/portal/public/SAM/.

All Quoters shall be registered and current in the System for Award Management (SAM) database at time of award.

Section D Technical/Management Approach
Accommodations: The prospective bidders shall provide information on the quantity and type of equipment and amount of space the Gerofit program will have available for use by VA Veterans, during the allotted time.

Location: The prospective bidders shall provide information on location, accessibility to major highways and bus system.
Accessibility: The prospective bidders shall provide information regarding handicap accessibility, parking, and wifi.
Cost: Provide cost per month.
Note: It will be necessary for the TEB to visit each facility to properly score each proposal.
Contractor shall provide leased time and space for an average of 60 Veterans (range is 45-90 /day) over a 2 ½ hour block of time, on Monday, Wednesday, and Friday mornings. Desired block of time is from 8:00 am to 10:30 am, but exact time is negotiable must be in the morning hours and consistent throughout the week.
The facility shall have existing space for floor exercises, balance, and Tai Chi programs, in addition to safe access to stationary and recumbent bicycles, treadmills, strength training equipment, and shall be handicap accessible.
The DVAHCS Gerofit staff shall be responsible for administering the exercise program and shall have full access to stationary and recumbent bicycles, treadmills, strength training equipment, and an open area for floor exercises and Tai Chi classes. VA staff shall be present at all times a patient(s) is present at the facility during the agreed upon times.
Space is requested, for the placement of ~12 pieces of our equipment for use by our mobility-limited veterans. 7 of these will require an electrical plug to function properly.
Contractor s facility shall be:
· designated exercise space including equipment and group exercise room ( 2,500 ft2)
· located within a 10-mile radius of the DVAHCS
· handicap accessible (few stairs and/or elevator), to include bathrooms
· some handicap parking, and enough parking spaces to accommodate ~40 veteran vehicles
· accessible to major highways and bus system
· wifi access throughout the facility
· storage space for group exercise equipment
· secured storage space for medical equipment and administrative materials
· smoke-free
· maintain a clean environment that includes provision of individual and equipment sanitation supplies
· have emergency response equipment (AED) available onsite
The quoter shall identify any subcontractors proposed under this solicitation. All technical elements applicable to the utilization of subcontractors must be addressed in the technical quote and detail provided.

The technical quote should be as detailed as necessary to fully explain the proposed methods and rationale; it should reflect a clear understanding of the nature of the work being undertaken. The technical quote shall include information on how the project is to be organized, staffed, and managed.

The Technical Volume shall not exceed twenty-five (25) pages in length (minimum 12-point font and no less than ½ inch margins). Page limitation includes any drawings, charts, images, etc., and excludes section dividers, table of contents, glossary of terms, cross-referencing indices, and resumes. If more than 25 pages (not counting excluded pages) are submitted, only the first 25 pages will be considered.

Section E Past Performance
Identify all federal, state, and local government contracts as well as any private/commercial contracts of similar scope, size, complexity that are ongoing or have been completed within the last three years. List the following information for each contract:

Company Name and Address
Description of Services Performed
Name, Telephone Number and Email Address of Responsible individuals who have first-hand knowledge of performance relative to similar type of services
Dates of Contract Performance
Contract Type (e.g. fixed-price, cost reimbursable) and total contract value

Failure to submit a complete proposal may result in an unacceptable determination.

3.0 AWARD BASIS
The Government will select the quote that represents the best benefit to the Government at a price that can be determined reasonable. The Government will evaluate technical capabilities, past performance, and price.

Following receipt of quotes, the Government will perform an evaluation using a comparative analysis of the services quoted in accordance with FAR 13.106-2(b)(3). The Government will compare quotes to one another to select the service that best benefits the Government by fulfilling the requirement. The evaluation of Government requirements outlined in this request for quote will determine suitability. Contractors may submit more than one quote; however, contractors are strongly encouraged to submit their best technical solutions and prices in response to this request for quote. Once the Government determines there is/are a contractor(s) that can provide a service that meet(s) the requirements of this request for quote, the Government reserves the right to communicate with only those contractors quoting the best-suited service to address any remaining issues.

Factor 1: Technical/Management Approach
The evaluation process will consider whether the quote demonstrates a clear understanding of the technical features involved in meeting the requirements of the solicitation.

Factor 2: Past Performance
Past performance information will be utilized to determine the quality of the contractor s past performance as it relates to the probability of success of the required effort. The Government will evaluate customer satisfaction, responsiveness to customer needs, and past demonstration of meeting delivery schedules and the delivery of quality services. Emphasis will be on recent, relevant past performance in the previous 3 years. Recent is defined as work performed within the last three years. Relevant is defined as work similar in size and scope of the work described in the Performance Work Statement (PWS).

Past performance information is one indicator of a quoter s ability to perform the contract successfully. Current and relevant information, source of information, context of data, and general trends in Contractor s performance shall be considered as it pertains to the performance of work described in this solicitation. Quoters may provide information on problems encountered on identified contracts and the quoter s corrective action. The Government shall consider this information as well as information obtained from any other sources when evaluating the quoter s past performance.

Since the Government may not necessarily interview all of the sources provided by the quoters, it is incumbent upon the quoter to explain the relevance of the data provided. Quoters are reminded that the Government may elect to consider data obtained from other sources.

Quoters with no relevant past performance or whom information is not available, shall not be evaluated favorably or unfavorably on past performance, but may be considered less favorably than a quoter with favorable performance history.

Factor 3: Price
Prices shall be submitted in accordance with the Price Schedule contained in the Solicitation. Total price will be evaluated by the Government. In evaluating the quoter s proposed price for this project, the Government concern includes determining price reasonableness.

Reasonableness determinations will be made by determining if competition exists, by comparing proposed cost/price with established commercial prices, other contract vehicles, and/or by comparing proposed cost/price with the Independent Government Cost Estimate (IGCE).  The IGCE is not releasable to the public.

4.0 TECHNICAL QUESTIONS
Quoters should submit all technical questions regarding this solicitation to the Contracting Officer in writing, via email, to Serina Black at Serina.Black1@va.gov on or before 3:00 PM, EST, Wednesday, November 13th, 2024.

Address Subject Line: Gerofit Program | Durham

Telephonic (verbal) questions Will Not be addressed.

All responses to questions, which may affect quotes, will be incorporated into a written amendment to the Request for Quote.

Opportunity closing date
20 November 2024
Value of contract
to be confirmed

About the buyer

Address
246-NETWORK CONTRACTING OFFICE 6 (36C246)

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?