Germany - FaCit - New construction of a bicycle station at Bahnhofsring 10 in Leer, shell construction work; the

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
08 August 2024
Opportunity publication date
11 July 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

FaCit - New construction of a bicycle station Bahnhofsring 10 in Leer, shell construction work; As part of the FaCit funding program, the city of Leer is building a bicycle station with 400 parking spaces and a service area with workshop and sales facilities in the immediate vicinity of the listed station building; In addition to the main building of the bicycle station, a subordinate, unheated building will be erected in the outdoor area, which will accommodate the temporary storage of waste materials and a bicycle washing facility.A free-standing drinking fountain completes the offer;; Main building bicycle station:; Total component size (service and parking area); Length approx.: 39.29 m; Width approx.: 10.835 m; Eaves height approx. 6.85 m; The 2-storey main building of the bicycle station is divided into two functional areas.1st:; Thermally conditioned (heated) service area, ground floor/ first floor; 2nd:; Thermally unconditioned (unheated) parking area ground floor/ first floor; 1st service area:; The service area forms an entrance situation on the ground floor due to the recessed façade, which leads directly into the reception and store area. Here, customers can hand over or receive their bicycles to the employees for storage in the parking area; Furthermore, customers can place repair orders with the workshop on the ground floor; A WC for people with disabilities, which can be accessed from outside, rounds off the offer.The necessary social, sanitary, office and technical rooms are located on the upper floor of the service area;; A necessary staircase connects both floors;; 2. parking area:; The parking area extends over both floors of the ground floor and upper floor. Here, customers' bicycles are parked by employees in double-decker racks. The floors are connected by a flat bicycle ramp with sliding grooves; A special feature is the exclusive area on the ground floor. This is a spatial separation from the parking area. However, this allows customers external access from outside outside the regular opening hours of the bicycle station; The parking area must be "air-flushed" due to fire protection requirements. Consequently, this area is thermally unconditioned;; The two functional areas are separated by an insulated building partition wall, which is of particular importance in the construction;; Building design and materiality;; Due to the requirements regarding transparency and permeability of the façade, the material; expanded metal is chosen as a VHF construction.In areas with visible glazing on the ground floor, the façade elements are printed with different screen prints, which are derived from the design features of the expanded metal.The result is a symmetrical T-shaped structure that is deliberately restrained in terms of its figure and materiality in relation to its surroundings, but still has its own architectural independence; Outbuilding waste \/ bicycle washing facility:; Total component size; Length approx. 5.835 m; Width approx.2.005 m; Eaves height approx. 2.75 m; The subordinate building of the bicycle washing facility will also be clad with expanded metal, similar to the main building; The scope of services of this tender is limited to the construction of the substructure, as well as the main masses to be executed:; Cleanliness layer 5 cm thick C 8\/10 =: approx. 415m²; Formwork strip foundation: =: approx.148m²; In-situ concrete floor slab C 35\/45 WU concrete: =: approx. 89m³; In-situ concrete floor slab C25\/30 =: approx. 30m³; Smoothing of the fresh concrete surface: =: approx. 503m²; Perimeter insulation xps under floor slab: =: 190m²; In-situ concrete of the outer and inner walls =: approx. 20m³; Element slab for top concrete: =: approx. 782m²; In-situ concrete slab =: approx.113m³; edge formwork =: approx.250m; in-situ concrete coating: =:... (The text has been cut off. You can find the complete text in the PDF file)

Opportunity closing date
08 August 2024
Value of contract
to be confirmed

About the buyer

Address
Stadt Leer (Ostfriesland)

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?