Germany - Extension of the Irsch day care center, 2nd construction phase; lots 25-31; lot 25 interior and exterior work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
21 November 2024
Opportunity publication date
29 October 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Extension of the Irsch day care center, 2nd construction phase; lots 25-31; lot 25 interior and exterior plastering work; interior plastering work -: 18 m² masking work to protect adjacent building materials; -: 7 m² protective measures for technical installations; -: 5 m² glass fiber reinforcement; -: 5 running meters of installation openings in the existing plastered masonry; -: 5 m² plaster primer pre-treatment for lime plaster on concrete surfaces; -: 2 m² PUR hard foam adhesive filler plastered masonry; -: 5 m² plaster base pre-treatment for lime plaster on concrete surface and polystyrene as mineral adhesive filler; -: 2 m² PUR rigid foam box pre-treatment; -: 146 m² wall surface preparation (old plaster); -: 4 m² repair damaged plaster, very small areas; -: 16 running meters of corner protection rails, galvanized, 30\/30 mm, round; -: 4 m² lime plaster as wall plaster - Q2 stripped, very small areas; -: 148 m² primer on wall surfaces incl. (old plaster); -: 148 m² lime finishing plaster, smoothed Q3; exterior plastering work; -: 45 m² scaffolding, 4 weeks; -: 6 running meters disassembly and reassembly of rainwater downpipes DN 125; -: 30 m² masking work on dirt-sensitive components (windows); -: 14 running meters of insulation board 035, 120 mm, work on missing areas on wall, supplement; -: 2 running meters of plinth insulation board 035, 80 mm, small area; -: prepare 20 m² of wall surfaces (old plaster); -: 2 m² plaster cavities knocked off and completed; -: 12 running meters of fabric angles; -: 18 running meters of plaster connections to windows \/ doors; -: 5.5 running meters of connections to window sills; -: 12 running meters of plaster finishes to adjacent roof and wall surfaces; -: 2 running meters of plaster finish profile on plinth area; -: 3.5 running meters of elastic expansion joint profile; -: 5 m² mineral bonding bridge; -: 5 m² finishing plaster work; -: 45 m² primer on wall surfaces incl. (old plaster); -: 45 m² lime reinforcing mortar with full-surface fabric insert - as leveling plaster, min. 4 mm; -: 45 m² mineral hybrid disc plaster, incl. reveal area; -: 445 m² hybrid facade paint, mineral, two coats, incl. reveal area; -: 12 m² mineral facade paint, two coats, incl. reveal area; -: 12 m² mineral facade paint, two coats, two coats, incl. reveal area; -: 12 m² mineral facade paint, two coats, two coats 12 running meters of plinth moisture protection; -: 12 running meters of plinth, high splash water exposure, supplement to facade area; -: 12 running meters of plinth paint, supplement to facade area; -: 40 m² of scaffolding tie holes to be closed; Lot 26 Drywall work; -: 35 m² metal stud wall, thickness 15 mm, 2x 12.5 mm GKFI, with sound insulation; -: 3.2 running meters of T-connectors, as an addition; -: 7 running meters of wall connection to solid wall; -: 2 door openings metal stud wall, 15 mm, 1.01 m x 2.135 m; -: 4 window openings, metal stud wall, 15 mm, 1.01 m x 0.635 m; -: 4 prefabricated windows for increased sound insulation requirements, special design,; 150 mm opening width, 6 mm VSG SI + 6 mm ESG; -: 10 support posts, room-high, UA 100; -: 10 universal crossbars; -: 79 m² acoustic ceiling system 625 x 625 mm, glass wool; -: 57 linear meters of wall connection using wall angle, 22\/22 mm; -: 5 reinforcements on the substructure; -: 1 m² vertical height offsets with GK panels; -: 44 linear meters of permanently elastic joints, approx. 5-7 mm wide; -: 23 m² Magnesite-bonded and acoustically effective wood wool lightweight panels as a top layer for the suspended ceiling; -: 23 m² allowance for panel coloring; -: 27 running meters of wall connection with shadow gap; -: 23 m² allowance for ball-proof design; Lot 27 screed work; -: 24 m² Clean sealed floor slab; -: 24 m² Additional thermal insulation, 1-layer, impact sound insulation EPS 035 DES sg 30-2; -: 24 m² PE 02 foil; -: 27 running meters edge joint made of edge insulation strips, h=150; -: 24 m² Floating cement screed on separating layer, CT C30 F5, 45mm; -: 24 m² Plastic fiber; -: 24 m² allowance for rapid screed, for screed C30 F5; -: 24 m² allowance for increased evenness requirement, cement screed on separating layer; -: 10.50 running meters of dummy joints, force-fit sealing of cracks in screed or movement joints; -: 5 running meters of movement joint profile made of 10 mm polyethylene foam; -: 10 running meters of work on new screed surfaces to existing screed surfaces using casting and adhesive resin; Lot 28 Tiling work; -: 27 running meters of edge insulation strips, cut screed; -: 23 m² supply, lay and grout floor tiles, 30x60 cm, R10; -: 3 running meters allowance for work on existing... (The text has been cut off. You can find the entire text in the PDF file)

Opportunity closing date
21 November 2024
Value of contract
to be confirmed

About the buyer

Address
Verbandsgemeindeverwaltung Saarburg-Kell

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?