Germany - ELT - Ebert School

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
08 August 2024
Opportunity publication date
04 July 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Construction of the electrical system, including delivery and installation
The new building consists of a 3-storey building section with a 2-storey connecting section. The top floor will be constructed as a pitched roof
Cable laying, lighting fixtures, installation devices, fire protection, data connections, distribution boards, safety lighting, sun protection control, fire alarm system, burglar alarm system, loudspeaker system, photovoltaic system
Delivery and installation:
15,500 m low-voltage installation cables
14,000 m low-current installation cables
1,800 m cable support systems
340 pcs. Installation devices
90 pcs. Data connection boxes
45 pcs. Fire protection measures
250 pcs. Lighting fixtures
1 sunshade control system with 70 drives
50 loudspeakers for the public address system
1 safety lighting system with central battery technology
consisting of 5 central units (old/new building) and 210 lights in permanent and standby mode
1 pc. Fire alarm system consisting of 50 detector units and
80 signaling devices on existing central system
1 burglar alarm consisting of 25 IR motion detectors,
10 door monitors and 1 arming/disarming circuit
1 photovoltaic system with battery storage 25kwp/22kwh

Opportunity closing date
08 August 2024
Value of contract
to be confirmed

About the buyer

Address
Stadt Kamp-Lintfort

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?