Germany - During peak hours, the light rail line 1 currently has

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
10 October 2024
Opportunity publication date
10 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

At present, light rail line 1 has no longer exceeded its capacity limit on some sections during peak times, but it can be assumed that this will soon be the case again. Light rail lines 7 and 9 will also exceed their capacity limits in the short term. Against the backdrop of the forecast population growth and the desired traffic turnaround to strengthen the environmental network, a significant expansion of the available capacities is absolutely essential in the short to medium term. The capacity expansions on the east-west axis are also a prerequisite for extensions to Cologne's light rail network, e.g. to Neubrück, Zündorf-Süd or Bergisch Gladbach-Moitzfeld. Increased frequencies on the existing infrastructure are no longer possible due to the train frequency of 5 trips per 10 minutes per direction in the central area, so that additional capacity requires either the construction of an additional line through the city center or the upgrading of the existing line for longer trains. Due to the available financing options, only upgrading for longer trains currently offers a realistic prospect of implementation in terms of time.
The use of long trains (approx. 90 m instead of the previous 60 m; i.e. increasing the available space by 50%) on the east-west axis requires numerous existing stops to be adapted.
These four underground stops on the right bank of the Rhine are relevant for this project:
? Deutz Technical University [DZB]
? Kalk Post Office [KPO]
? Kalk Chapel [KKP]
? Fuldaer Straße [FDS]

The overarching project objectives for all stops are:
? Fire protection upgrades, including the creation of additional entrances (based on the fire protection concepts as a result of increased passenger numbers)
? Creation of barrier-free accessibility
? Making the station more attractive

The relevant performance image\/work is:
? Technical equipment: Power installations according to § 53-56 and Annex 15, Group 4 of HOAI 2021.

- The following requirements must be implemented for all 4 stops:

The requirements of the KVB electrical engineering requirements profile must be applied to stops. The transformers must be replaced due to their advanced age of over 40 years and must be designed for the power of the required consumers. This also applies to the inverter, which must also be designed for the new consumers. Two major new consumers will be the elevators. The main distribution board must be adapted for this and new cables laid. It must be checked whether the suitability for further use and expansion of the entire installed electrical systems corresponds to the KVB requirements profile. The safety lighting unit must be designed in accordance with the KVB requirements profile. The flood bulkhead gate, which is currently provisionally connected to the transformer network, must be connected to the safety power supply network. The entire lighting at the station must be converted to LED lights. There are tunnel boxes, tunnel lighting and tunnel buttons in the KVB tunnels. For this purpose, cables must be planned and laid from the distribution to the first tunnel box, tunnel lighting and tunnel button as a transfer point. The consumers in the stopping point must be divided into traction current-relevant and non traction current-relevant consumers and planned as distributions according to the requirement profile. A fourth feed-in source must be provided in accordance with the KVB requirement profile NEA (emergency power supply unit). No separate heat supply system is planned for the station. A heat supply with electric heaters is therefore planned for the operating rooms.

- Fuldaer Straße [FDS]:
The station has a 400 kVA transformer and a 130 kVA inverter. The safety lighting still corresponds to the old state of the art and still uses incandescent lamps. (The text has been cut off. You can find the entire text in the PDF file)

Opportunity closing date
10 October 2024
Value of contract
to be confirmed

About the buyer

Address
Kölner Verkehrs-Betriebe AG

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?