United States - Defense Supply Center Richmond(DSCR) Building 31M Break Room Renovation

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
11 February 2025
Opportunity publication date
14 January 2025
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

fense Supply Center Richmond (DSCR) Building 31M Break Room Renovation This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-25-Q-0022 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 60 days after issuance of the Notice to Proceed (NTP).  OBJECTIVE To repair the breakroom with updated cabinets, countertop, sink etc. and remove mold. BACKGROUND Building 31 M bay breakroom hasn’t been renovated in many years. The cabinets are broken, wallpaper is peeling and there is visible mold. SPECIFIC REQUIREMENTS The contractor shall: • The contractor shall complete demolition of the lower breakroom cabinets only and counter and reinstallation of the same on Mondays and Fridays only. • Remove upper cabinets, save for reuse and install after wall work. • Relocate the refrigerators inside B31M bay where designated (not with water for ice), replace in the breakroom when completed. • Remove, microwaves, bulletin board etc. and all other items, store in a container and return all items. • Hang plastic to cover the opening to the breakroom. • Remove all wallpaper, glue etc. to the corner guards. Replace corner guards with same as existing. • Remove and replace all the 5/8” thick GWB that has mold and replace with mold resistant GWB. There is 100Sf of GWB to be replaced. Place all moldy GWB in bags and seal prior to leaving the breakroom. • Prepare all walls to level 4 IAW GA 214. The contractor must use a dustless sanding vacuum system when preparing the walls to minimize dust. No dust can migrate out of the breakroom. Use of an additional HEPA filter system in addition to the dustless sanding is required. Submit a separate dust plan for approval. • Prime and paint a minimum of 2 coats of satin sheen paint (IAW MPI), off white, provide samples for exact choice. • Replace all lower cabinets with the same type, style etc. as upper cabinets. Provide the same amount of draws and doors as existing. • Provide new cabinet pulls that match existing. • The base cabinets will need to be sized to fill the opening where they meet the walls and cover the flooring edges under the sink. • Cabinets, sinks etc. must meet ADA/ABA. • Provide a solid surface quartz countertop and 4” quartz backsplash with marbling, 1.25” thick. Align the colors, patterns, and veining of the slabs to create nearly seamless transitions. Provide physical samples for selection. • Provide a single undermount stainless steel sink the same dimensions as existing. • Provide a new gooseneck type facet same as existing. • Replace the plumbing under the sink (not in wall). • Rework the plumbing, valve etc. behind the fridge. Add a valve box recessed into the GWB. • Repair the cover base just outside the breakroom. • Replace the transition strip, match existing. • Repair any damaged grass areas from the dumpster, parking, toilet etc. with suitable soil, seed and straw. • Repair any damaged grass areas from the dumpster, parking, toilet etc. with suitable soil, seed and straw. • The concrete sidewalk currently has zero cracks. Any cracks found to be caused by the contractor shall be repaired by cutting out however many concrete sections are affected. No crack filling will be permitted. • Cover all smoke detectors to prevent dust from sounding the alarm. • Provide a MERV 8 filter over the return for the duration of this project. • Meeting location for the site visit shown in the map at the end of this document. PERIOD OF PERFORMANCE Completion date shall be no later than 60 days after notice to proceed. DISCLOSURE OF MAGNITUDE The dollar value of the ensuing contract is estimated to be between $30,000.00 and $62,500.00  See attached Statement of Work(SOW) for full requirement details. This acquisition is set-aside for 100% small businesses.  The North American Industry Classification System (NAICS) Code is 236220 (Commercial and Industrial Building Construction). The small business size standard is $45M.  Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA).  Partial proposals will not be accepted. For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is defined as the commutable radius. Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote. All inquiries and questions must be submitted no later than 01/31/25 COB. Acceptable method of quote or inquiries submission is Email to Robert.Moragues@dla.mil. Questions are due on 01/31/25, end of day. Submit questions via email to Robert.Moragues@dla.mil. Quotes are due on February 11, 2025, end of day.  Submit quotes via email to Robert.Moragues@dla.mil. A Site visit is scheduled on location at Defense Supply Center Richmond(DSCR) on 01/28/25 @ 1000.  There will only be one site visit; requests for additional site visits will not be honored.   Persons interested in attending MUST pre-register through the link below.  Processing by the Security Office can take up to 5 business days; interested parties are advised that a minimum of 3 business days is typically required.  When following the link below, you will be prompted to enter a sponsor for the site visit. The Project Manager will serve as the sponsor for the site visit.  The Project Manager for this requirement is Mike OConnor
Opportunity closing date
11 February 2025
Value of contract
to be confirmed

About the buyer

Address
DCSO RICHMOND DIVISION #1

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?