Germany - Contracting authority for Titles 2,3,4,5,6 and pro rata Title 1 (Community Titles):; Purpose
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 06 February 2025
- Opportunity publication date
- 22 January 2025
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Client for titles 2,3,4,5,6 and pro rata title 1 (joint title):; Zweckverband Wasserversorgung und Abwasserentsorgung Obereichsfeld; Client for title 7 and pro rata title 1 (joint title):; Wasserleitungsverband Ost-Obereichsfeld; Client for titles 8,9,10 and pro rata title 1 (joint title):; Gemeinde Unstruttal; Client for title 11 and pro rata title 1 (joint title):; TEN Thüringer Energienetze GmbH & Co.KG; Services to be provided:; Title 1: Community title, general works; Title 2: Sewer main lines; approx. 1,250 m² trench shoring up to 3.30 m deep; approx. 605 m³ excavation for line trenches incl. backfilling; approx. 140 m PP DN 200 plastic pipeline laying; approx. 70 m PP DN 150 plastic pipeline laying; approx. 5 PP manholes DN 800 or DN 1000, incl. manhole cover relocation; Title 3: Sewer, property connection lines; approx. 390 m² trench shoring up to 2.00 m deep; approx. 210 m³ excavation for pipe trenches, incl. backfilling; lay approx. 110 m plastic pipeline PP DN 150; Title 4: Rainwater sewer, main pipes; approx. 1,030 m² trench shoring up to 2.50 m deep; approx. 630 m³ excavation for pipe trenches incl. backfilling; approx.: lay 25 m reinforced concrete pipe DN 400; lay approx. 115 m plastic pipe PP DN 300; approx.: lay 70 m plastic pipe PP DN 250; approx.2 reinforced concrete manholes DN 1000, incl. manhole cover; approx. 3 PP manholes DN 1000, incl. manhole cover; Title 5: Rainwater sewer, property connection pipes; approx. 380 m² trench shoring up to 1.80 m deep; approx. 180 m³ excavation for pipe trenches, incl. backfilling; lay approx. 110 m plastic pipeline PP DN 150; Title 6: Dachrieder Straße rainwater discharge; approx. 80 m³ excavation for working level in the embankment area, incl. reinstallation; approx.30 m³ excavation for pipe trenches incl. backfilling; approx.: 40 m³ excavation for drainage trough, incl. disposal; approx.: lay 16 m reinforced concrete pipeline DN 600; approx.: relocate 1 pc reinforced concrete shafts DN 1200, incl. shaft cover; approx.: relocate 65 m² armourstones in concrete bedding; approx.: drive in 18 m row of wooden piles in the watercourse; Title 7: Earthworks for drinking water pipeline; approx. 210 m³ excavation for pipe trenches, incl. backfilling; Title 8: Roadworks for the watercourse. Backfilling; Title 8: Road construction work; take up and dispose of approx. 1,600m² asphalt with different milling depths; approx. 510 m³ excavated soil roadway, incl. disposal; install approx. 240 m³ gravel material for soil replacement; approx. 90 m³ create pipeline trench, incl. backfilling; approx. 50 m lay plastic pipeline PP DN 150; approx. 35 m install box gutters DN 100; approx. 14 install road drains; approx. 250 m lay seepage pipeline DN 150; approx. 370 m³ frost protection layer; approx. 240 m paved gutter, 2-row; approx. 1,650 m² asphalt base and surface course; Title 9: Ancillary facilities; approx. 220 m² paved surface or slab covering; approx. 340 m kerbs; approx. 130 m³ of excavated roadway soil, incl. disposal; install approx. 160 m³ of ballast material for soil replacement; install approx. 175 m³ of frost protection layer; relocate approx. 350 m of high or round kerb; relocate approx. 215 m of low kerb; lay approx. 480 m² of concrete paving; lay approx.50 m² granite paving; approx. 480 m empty conduit; Title 10: Street lighting; approx. 105 m³ cable trench construction, incl. backfilling; approx. 280 m cable zone construction and cable laying; approx. 6 poles with lights to be dismantled and re-installed elsewhere; approx. 3 poles with top-mounted lights to be delivered and installed; Title 11: TEN civil engineering work; approx. 70 m³ cable trench construction, incl. disposal; approx. 200 m cable zone construction
- Opportunity closing date
- 06 February 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- Zweckverband Wasserversorgung und Abwasserentsorgung Obereichsfeld
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.