France - Contract 2024E013 - Project management assistance (PMA) for upgrading and increasing the service level of the Haut-de-France regional data center of the French Ministry of Higher Education and Research, located at the Univer...
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 08 January 2025
- Opportunity publication date
- 30 November 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Mission d'assistance à maitrise d'ouvrage (AMO) concernant l'évolution et l'augmentation du niveau de service du data center régional Haut-de-France du Ministère de l'enseignement supérieur et de la recherche implanté à l'Université de Lille.
The present consultation concerns a project management assistance mission (AMO) concerning the evolution and increase of the service level of the Haut-de-France regional data center of the Ministry of Higher Education and Research located at the University of Lille.
The data center is located in the M4 building at the Cité Scientifique in Villeneuve d'Ascq. This is a ground-floor building with 2,415m² of floor space, housing the DGDNUM department, of which approximately 350m² is dedicated to the data center.
The mission of the data center is to host the digital infrastructures of various players in the Higher Education and Research (ESR) sector. The structures hosted are both internal and external to the University. The various infrastructures are managed by the staff of these different structures.
The University of Lille was awarded the label in 2020, enabling it to begin increasing the reliability and capacity of its datacenter.
Following the certification of the Lille data center, the University undertook a state-of-the-art upgrade. The work was divided into three phases:
- Phase 1 (completed): extension to 58 bays and 450 kW of climatic power - The main objectives of this phase were to re-urbanize the data center, renew the air conditioning, fire protection and supervision systems, and upgrade the power supply network;
- Phase 2 (current): expansion to 88 bays and 650 kW of climatic power - This phase will involve extending the data center's hosting capacity, securing the power supply to improve availability (Tier3 expected), extending the air-conditioning system to support the additional IT load, and aiming to improve PUE. These interventions will be questioned and clarified as part of the general diagnosis of the facility and the drafting of the program.
- Opportunity closing date
- 08 January 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- Etablissements et organismes de l'enseignement supérieur, de la recherche et de l'innovation
Bid for tender
If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.
This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.
Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.
This opportunity has been translated from its original language. You should check if you need to apply in the original language.