United States - Construction of High-Containment Continuity Laboratory, Building 28 - CDC Roybal Campus, Atlanta, GA

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
11 October 2024
Opportunity publication date
11 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Centers for Disease Contract & Prevention (CDC) intends to make a single award of a contract for construction of a new High Containment Continuity Laboratory (HCCL) facility. The CDC previously awarded an Architecture and Engineering (A/E) contract to design the HCCL. The design and associated Pre‐Construction services are complete. This solicitation is for construction of the completed design. A firm-fixed-price construction contract is anticipated.  FAR Part 15 and 36 apply. Contract award is estimated to be made in the 4th Quarter of Fiscal Year 2025 (July, August, or September of 2025).  
Hard copies of the solicitation will not be available. The site provides downloading instructions. All future information regarding this acquisition, including solicitation amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure they have the most up to date information about this acquisition.
This procurement is unrestricted regarding business size. Interested contractors must have an active registration, including completion of the annual representations and certifications, in the System for Award Management (SAM) at http://sam.gov at the time of proposal submission to be eligible for award.
Summary of Services to be Provided: The CDC has a requirement for construction of a new High Containment Continuity Laboratory (HCCL) facility. The HCCL will have gross building area of approximately 175,000 square feet and will consist of bio‐safety level (BSL) 3E and 4 laboratories and supporting infrastructure space. Included with the construction effort, the General Contractor (GC) shall provide management and inspection services, bonds, warranties, guarantees, quality control, safety review/inspections, test and inspections, security and logistic control, record documents, manuals, facilities maintenance training, health and safety plan, CPM schedules, submittal review and coordination, construction administration services, commissioning, furnish tools, materials, equipment, labor and incidentals, coordinate all construction related work, develop required coordination drawings, construction administration services, commissioning, and other related professional services.
The CDC will continue normal operations on the Roybal Campus while construction activities are occurring. Due to the critical mission of the Agency and the nature of the work performed at the Roybal Campus, the CDC Roybal Campus is always open, and activities occur 24 hours a day, 365 days per year. The GC shall cooperate and coordinate with the CDC to avoid any adverse impacts on the CDC’s ability to maintain continuation of all operations.
Site Location: The B28, HCCL building will be constructed on the CDC Roybal Campus at 1600 Clifton Road,
Atlanta, GA 30333 at the existing location of the Building 16 Parking Deck.
Construction Magnitude:
FAR 36.204 Disclosure of the magnitude of construction projects
Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the
Government’s estimate. Therefore, the estimated price should be described in terms of one of the
following price ranges:
(a) Less than $25,000.
(b) Between $25,000 and $100,000.
(c) Between $100,000 and $250,000.
(d) Between $250,000 and $500,000.
(e) Between $500,000 and $1,000,000.
(f) Between $1,000,000 and $5,000,000.
(g) Between $5,000,000 and $10,000,000.
(h) More than $10,000,000.
This project falls under price range (h) More than $10,000,000. The government anticipates that the estimated magnitude of construction is between $275,000,000.00 and $340,000,000.00.
Project Schedule – Construction and commissioning shall be duration of forty‐four (44) months from Notice‐to‐Proceed.
Point of Contact
Mike Davis,
Contracting Officer
Phone: (770) 488‐2427
Email: VWL8@CDC.GOV (Preferred)
Address: 4770 Buford Hwy, Atlanta, GA 30341, Mail Stop S102‐4.

Opportunity closing date
11 October 2024
Value of contract
to be confirmed

About the buyer

Address
CDC OFFICE OF ACQUISITION SERVICES

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?