Germany - Construction description for new administration building BA-RO116113-A01 On behalf of the

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 September 2024
Opportunity publication date
26 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Construction description for new administration building BA-RO116113-A01

On behalf of the Federal Agency for Real Estate, the Rostock State Building and Real Estate
Liegenschaftsamt Rostock is planning an administration building. The building will be an office and
and storage building and also includes traffic facilities such as parking spaces, garages and
and bicycle stands in the adjacent area.

The building is planned with two to three storeys and must not exceed the eaves height of
12.61 m above the attic. The property is assessed in accordance with §34 BauGB by the
urban planning. The cubature has been submitted as an angle in the city planning statement.
has been submitted, a bar is also conceivable. The planning must take space efficiency
and adapt to the two existing buildings. The property
is to be developed further in the long term. The possibility for this exists on the northern boundary
of the property. There are no plans to develop the area, but the possibility of
possibility of a traffic connection to the property should remain.

The building will not be publicly accessible. The area to be built on is located
on a fenced-in property belonging to the Rostock customs office. The accommodation of
37 workplaces is subject to confidentiality. Security requirements must therefore be
must be taken into account. The first floor in particular must offer protection against access, locking and breakthrough protection, etc. Access and rooms should also be electronically monitored.

Accessibility must be guaranteed. An elevator is planned, based on the
BImA's accessibility concept (will be sent after commissioning).

The Assessment System for Sustainable Building (BNB) is used for the administration building.
will be applied. The aim is to achieve the silver standard for office buildings according to BNB. In addition
the federal government's energy efficiency decree will also be applied.

Functional area 1: Administration
The offices cover 339 m² and include offices, group work rooms and storage rooms.
storage rooms. In addition, several storage rooms with a total area of 72 m² as well as
an operations center are planned. One technical room and one storage room must be designed for larger loads.
be designed for larger loads. A further 67 m² must be divided into a meeting room, a break and standby room and a kitchenette. A changing area is also planned.
is planned. Sanitary areas are to be planned on each floor with administrative use.

Functional area 2: garages/parking spaces
A subsoil survey has already been carried out by the SBL for the neighboring building plot
which shows that a groundwater level of between 1 m and 1.5 m is to be expected.
A ground-level garage is therefore proposed. An underground garage can also be
also be planned if it is economically viable. The service vehicles to be accommodated
The service vehicles to be accommodated are two motorcycles, fourteen cars (parking space: W=3 m,
L=6 m, H=2.70 m) as well as six vans and a camper van (parking space: W=3 m, L=7 m,
H=3.5 m) with an excess length of up to 6 meters, a height of up to 3 meters and a width of up to 2.3
meters. The garage can be part of the building. If this is not the case, two
additional parking spaces must be created for concealed loading and unloading of vehicles.
The garages must be designed as unheated rooms.

In addition, 29 parking spaces, including one disabled parking space, must be located outside the building.
outside the building. An outdoor facilities planner will also be commissioned.

Planning data:
GFA\/m²: approx. 1,759 m²
Start of construction BM: I. quarter 2026
Completion BM: IV. Quarter 2027
Planning requirement: Average

Construction costs (gross): approx. 7,490,850 ?
KG 200: 2,428,235 ?
KG 300: 3,378,830 ?
KG 400: 1,677,285 ?
KG 500: 880,350 ?
KG 600: 146,051 ?
KG 700: 1,321,430 ?

TGA Technical development of outdoor facilities
KG 410 128,698.00 ? gross KG 552 50,000.00 ? gross
KG 420 263,698.00 ? gross KG 554 50,000.00 ? gross
KG 430 253,698.00 ? gross
KG 470 18,698.00 ? gross

For the... (The text has been cut off. You can find the entire text in the PDF file)

Opportunity closing date
23 September 2024
Value of contract
to be confirmed

About the buyer

Address
Staatliches Bau- und Liegenschaftsamt Rostock, die Bundesrepublik Deutschland vertretend

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

This opportunity has been translated from its original language. You should check if you need to apply in the original language.

Go to third party website
Is there anything wrong with this page?