Germany - Complete or partial construction services in building construction as well as civil engineering works

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 January 2020
Opportunity publication date
11 December 2019
Category
45200000: Works for complete or part construction and civil engineering work
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by flushing, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, energy lines (connection and The masses are divided as follows:- Length of the longitudinal roads New construction: 53 126 m,- Delivery length of the micro-tube assemblies 4 x 20/15: 1 848 m,- Delivery length of the micro-tube assemblies 7 x 14/10: 46 154 m,- Delivery length of the micro-tube assemblies 12 x 10/6: 31 198 m,- Planned number of house connections to be made: 339 pcs,- Length of house connections (on private land): 9 550 m,- Delivery length of micro pipes 1 x 10/6: 13 173 m,- Number of network distributors (cable branches) 48/96: 12 pcs./2 pcs.- Number of cable shafts: 44 pcs.The concrete services required are exclusively specified in the bill of quantities. The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by flushing, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, energy lines (connection and The masses are divided as follows:- Length of the longitudinal roads New construction: 77 150 m,- Delivery length of the micro-tube assemblies 4 x 20/15: 4 974 m,- Delivery length of the micro-tube assemblies 7 x 14/10: 52 556 m,- Delivery length of the micro-tube assemblies 12 x 10/6: 61 727 m,- Planned number of house connections to be made: 807 pcs,- Length of house connections (on private land): 13 957 m,- Delivery length of micro pipes 1 x 10/6: 19 231 m,- Number of network distributors (cable branches) 48/96: 21 pcs/5 pcs Number of cable shafts: 54 pcs The concrete services required are exclusively specified in the bill of quantities. The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by flushing, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, energy lines (connection and Coordination of the connection to telecommunication and power lines).The quantities are divided as follows:- Length of the longitudinal roads New construction: 79 320 m,- Delivery length of the micro pipe assemblies 4 x 20/15: 3 234 m,- Delivery length of the micro pipe assemblies 7 x 16/12: 4 480 m,- Delivery length of the micro pipe assemblies 7 x 14/10: 42 752 m,- Delivery length of the micro pipe assemblies 12 x 10/6: 78 154 m,- Planned number of house connections to be made: 1 403 pcs,- Length of house connections (on private land): 22 589 m, - Delivery length of micro pipes 1 x 10/6: 31 736 m, - Number of network distributors (cable branches) 48/96: 32 pcs/8 pcs Number of cable shafts: 61 pcs. The concrete services required are exclusively specified in the bill of quantities. The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by drilling, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, power lines (connection and splicing of power lines),- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by drilling, etc.),- installation of cables and splices in buildings and at technical sites, infrastructure lines, power lines (connection and splicing of power lines). The quantities are divided as follows:- Length of the longitudinal roads New construction: 154 500 m,- Delivery length of the micro-tube assemblies 7 x 16/12: 24 958 m,- Delivery length of the micro-tube assemblies 7 x 14/10: 132 643 m,- Delivery length of the micro-tube assemblies 12 x 10/6: 175 261 m,- Planned number of house connections to be made: 4 285 pcs,- Length of the house connections (on private land): 68 175 m, - Delivery length of the micro pipes 1 x 10/6: 116 935 m, - Number of network distributors (cable branches)48 / 96: 69 pcs / 37 pcs Number of cable shafts: 55 pcs. The concrete services required are exclusively determined by the bill of quantities. The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by flushing, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, energy lines (connection and The quantities are divided as follows:- Length of the longitudinal roads New construction: 121 920 m,- Delivery length of the micro-tube assemblies 7 x 16/12: 13 472 m,- Delivery length of the micro-tube assemblies 7 x 14/10: 110 578 m,- Delivery length of the micro-tube assemblies 12 x 10/6: 131 321 m,- Planned number of house connections to be made: 2 724 pcs,- Length of the house connections (on private land): 36 888 m, - Delivery length of the micro pipes 1 x 10/6: X m, - Number of the network distributors (cable branching) 48 / 96: 75 pcs. / 17 pcs., - Number of the cable shafts: 64 pcs. The concrete services required result exclusively from the bill of quantities - 1 704 house connections. The concrete services required result exclusively from the bill of quantities. The services required for the construction of the network include:- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by drilling, etc.),- fibre-optic cable assembly, drawing and blowing services, laying of cables and splices in buildings and at technical sites, infrastructure lines, power lines (connection and splicing of power lines),- civil engineering services for all surfaces in open and closed construction (classical civil engineering, laying by means of cable ploughing, drilling by drilling, etc.),- installation of cables and splices in buildings and at technical sites, infrastructure lines, power lines (connection and splicing of power lines). The quantities are divided as follows:- Length of the longitudinal roads New construction: 108 390 m,- Delivery length of the micro-tube assemblies 7 x 16/12: 19 327 m,- Delivery length of the micro-tube assemblies 7 x 14/10: 152 711 m,- Delivery length of the micro-tube assemblies 12 x 10/6: 114 717 m,- Planned number of house connections to be made: 2 090 pcs,- Length of house connections (on private land): 32 878 m,- Delivery length of micro pipes 1 x 10/6: 62 244 m,- Number of network distributors (cable branches)48 / 96: 54 pcs / 11 pcs Number of cable shafts: 29 pcs The concrete services required are exclusively specified in the bill of quantities. The POP (lot 7) includes all work required for the erection of PoP sites (including civil engineering, delivery and installation) for all expansion clusters (POPs). the services required for the erection of the POPs include:- civil engineering services,- delivery and installation of the concrete space cells and the MFGs as active MiniPoPs,- delivery and installation of passive network components (ODF, splice patch modules, etc.).Lot 7 includes the following quantities:- civil engineering - PoP 3,10 x 6,10 x 3,6 m: 7 pieces,- PoP 3,10 x 3,10 x 3,6 m: 7 pieces,- MFG18 as MiniPoP: 4 pieces,- delivery and assembly of the installation parts listed.the specifically required services are exclusively determined by the list of services.

Opportunity closing date
23 January 2020
Value of contract
to be confirmed

About the buyer

Address
Eigenbetrieb Breitbandausbau des Landkreis Celle Guizettistraße 1 Celle 29221 Germany
Contact
vergabestelle@lkcelle.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?