Description

TOTAL SMALL BUSINESS SET-ASIDE
PROJECT DETAILS:  CA ERFO DEVA 2022-1(2) Salt Creek Interpretive Trail
This project will consist of replacement and reconstruction of the approximately 2,871-foot-long, ABA accessible, raised timber boardwalk trail (6-feet wide) that was completely destroyed during flash flooding on August 5, 2022. The project also includes removal of remaining portions of damaged and displaced boardwalk from sensitive environmental areas including wilderness, reconstructing the trailhead parking lot, and reconstructing a 400-foot section of roadway with special rock embankment. The boardwalk alignment will be placed in a modified alignment to follow the new post-flashflood stream course (August 2022 and Tropical Storm Hillary August 2023 events).
All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints including paleontological monitoring, limitations on large equipment in the boardwalk area, and matting that will affect the construction schedule and type of operations.  Great attention to detail will be required in achieving customer satisfaction in areas of roadway and parking lot construction, traffic control, visitor relations and timely completion of work.  Prior experience on projects of similar magnitude within National Parks, National Forests, or similar environments is required.
Principle work items include:

2,100 square yards of thermally modified timber structural decking,
58 thousand board feet measure (MFBM) of structural timber, treated,
5,800 linear feet of timber, 6-inch curbing,
700 linear feet of timber bridge railing,
650 each helical piles (2-7/8”, 5-1/2” & 7” diameter),
1,300 square yards of removal of timber boardwalk debris (by helicopter)
2,000 cubic yards of embankment construction,
400 cubic yards of special rock embankment,
680 square yards of concrete sidewalk and pavement,
400 linear feet of concrete curb, and
1 each vault toilet (double occupancy unit)

The anticipated advertisement date for the project is September 2024 with construction anticipated from November 2024 to June 2025.
The estimated price range of the project work is between $5,000,000 and $10,000,000.

Opportunity closing date
03 October 2024
Value of contract
to be confirmed

About the buyer

Address
6982AF CENTRAL FEDERAL LANDS DIVISI

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?