United States - Anti-sweat insulation removal and replacement

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 October 2024
Opportunity publication date
02 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

ANIT-SWEAT INSULATION REMOVAL AND REPLACEMENT FOR CGC RESOLUTE.
5.2 Detailed Tasks:
5.2.1 The contractor shall remove and dispose of existing insulation in select areas.  
5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60℉
5.2.3 Valves? Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing
5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized.
5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.
5.2 Detailed Tasks:
5.2.1 The contractor shall remove and dispose of existing insulation in select areas.  
5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60℉
5.2.3 Valves? Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing
5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized.
5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.

Opportunity closing date
20 October 2024
Value of contract
to be confirmed

About the buyer

Address
SFLC PROCUREMENT BRANCH 1(00080)

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?