United States - 62--azimuth-tilt se - and similar replacement parts, in repair/modification OF
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 25 November 2024
- Opportunity publication date
- 29 October 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
CONTACT INFORMATION|4|N792.06|2D3|215-697-0275|patrick.j.horan23.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT COMBO TYPE ||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|12|335999|600|||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x|
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: ## 125 days after receipt of asset
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR
SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN.
Early and incremental deliveries accepted and preferred.
\
1. SCOPE
1.1 . Markings shall be in accordance with MIL-STD-130.
1.2 PRE-AWARD / POST AWARD REQUIREMENTS:
Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended.
1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved
will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the
SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation:
(A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the
same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval.
(B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors.
(C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents.
(D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings,
forgings, etc.
(E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics
should be discernible from all other characteristics.
The above requirements are a subset of requirements specified in the ASO
Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with
MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval
Brochure.
The contractor shall notify NAVICP Code 072 when material required by this contract has been shipped to Destination.This shall be accomplished by sending
a copy of the DD Form 250, Material Inspection and Receiving Report to:
Naval Inventory Control Point
ATTN: Code 072
700 Robbins Avenue, Phila., PA 19111
or by submitting a facsimile to FAX: (215)697-2524, ATTN: Code 072.
1.4 The material covered in this contract/purchase order will be used in a
crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital
shipboard systems or loss of aircraft. Therefore,the material has been
designated as Critical material and special control procedures are invoked
to ensure receipt of correct material.
1.5 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3995AS1070; drawing number ( ;30003; ) ;NONE; , Revision ;APPLIES; and all details and specifications referenced therein.
1.6 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.7 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS
DRAWING DATA=3995AS1070 |30003| | |D| | | |
DRAWING DATA=3995AS9999 |30003| B| |D| | | |
3. REQUIREMENTS - NOT APPLICABLE
4. QUALITY ASSURANCE
4.1 CRITICAL MANUFACTURING PROCESSES
( ;APPLIES; ) HEAT TREAT
( ;N/A; ) WELDING
( ;N/A; ) CADMIUM PLATING
( ;N/A; ) ENGINEERING CHROME PLATING
( ;N/A; ) NICKEL CHROME PLATING
( ;N/A; ) CASTING(S)
( ;N/A; ) FORGING(S)
( ;N/A; ) MPR (MATERIAL PROCESSING REQUIREMENTS)
4.2 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR).
During production, mandatory inspection is required to be accomplished by the contractor as follows:
A. Level of Inspection (LOI).
1. Critical characteristics: 100% inspection shall apply.
2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR.
B. Critical characteristics:
;ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERYOF CONTRACT.;
C. Major and Minor characteristics
1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications.
4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying
office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of
witnessing the final inspection. The contractor shall notify by email or
TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA FAX (732) 323-1381.; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units.
4.4 SPECIAL INSPECTION REQUIREMENTS
( ;N/A; ) MAGNETIC PARTICLE INSPECTION
( ;APPLIES; ) SURFACE INSPECTION
( ;N/A; ) PENETRANT INSPECTION
( ;N/A; ) RADIOGRAPHIC INSPECTION
( ;N/A; ) ULTRSONIC INSPECTION
( ;N/A; ) HIGH SHOCK TEST
( ;N/A; ) MECHANICAL VIBRATION TEST
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
THIS IS AN ALRE FLIGHT CRITICAL ACTION ITEM. DISREGARD QUALITY ASSURANCE ON DRAWING, REFER TO CONTRACT. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET.
NAVICP REFERENCE ONLY: TDR 23-10008.
THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS"CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY THE NAVAL AIR SYSTEMSCOMMAND. ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUESTS FOR SOURCE APPROVALAND BEEN APPROVED WILL BE ELIGIBLE
FOR AWARD UNDER THIS SOLICITATION ANYCOMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST ASOUTLINED LATER IN THIS SOLICITATION.
All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall bemaintained by LKE QA and by the manufacturer for a period of seven years.
This overhaul/repair TDR is requiring the submission of data covering all partscomponents and assemblies, including material certifications, non-destructiveinspection process data, welding procedures/qualifications; this applies onlyto new, replaced components and
assemblies identified on the drawing as CAI/CSIand used in the recertification of the part- CAI/CSI and all traceabilityrequirements do not apply to any existing asset or components containedwithin.
\
DATE OF FIRST SUBMISSION=ASREQ
16. REMARKS
Data Requirements (As required based on repair process/procedure):
a. Copies of all approved requests for variations.
b. Dimensional inspection per Drawing 3995AS1070.
c. Identification per Notes 6, 7, and 15 of Drawing 3995AS1070.
d. Motor per Note 11 of Drawing 3995AS1070.
e. Material per Note 12 of Drawing 3995AS1070.
f. Testing of spares per Note 16 of Drawing 3995AS1070.
DATE OF FIRST SUBMISSION=ASREQ
16. REMARKS
If the extent of the repair effort for this assembly is beyond the scope of theexisting NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assemblythen the overhauling contractor or activity shall provide a step-by-stepoverhaul procedure for disassembly
and reassembly.
The overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance "hold points" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at
final assembly are accessible for proper interim inspection.
- Opportunity closing date
- 25 November 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- NAVSUP WEAPON SYSTEMS SUPPORT
Bid for tender
If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.
This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.
Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.