United States - 59--connector,bulkhead,

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
09 September 2024
Opportunity publication date
08 August 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

View Changes CONTACT INFORMATION|4|N742.4|WV2|(717) 605-7562|amanda.a.gowdy.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|see specification sections C and E |
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
INSPECTION/ACCEPTANCE POINT|6|||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO) Certifications - Stand-Alone Receiving Report |N/A|TBD|N00104|TBD|Material-S4306A; Certifications-N39040|N50286|TBD|Code 133.2|N/A|N/A|Certifications-N39040|N/A|N/A
|See DD1423|PORT_PTNH_WAWF_Notification@navy.mil|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery |||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|one|0001|30|TBD|TBD|TBD|TBD|60|X||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|335931|600 (# of employees)||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
EVALUATION OF FIRST ARTICLE TESTING|3|||X|
The following amendments have been made.
1. Some clauses, provisions, and local text have been updated as required. Please reference the following pages.
2. The hour and date specified for receipt of offers has been extended to 4:30PM EST on 09 September 2024.
3. All other terms and conditions remain the same.
\
1. The resultant award of this solicitation shall be issued bilaterally,requiring the contractor's written acceptance prior to execution.
2. This procurement shall be issued pursuant to the Special Emergency Procurement Authority.
3. DD1423 Data Item A001 may be waived if already on file at NAVSUP WSS
Mechanicsburg.
3. The following proposed delivery schedule applies:
WELDING PROCEDURES AND QUALIFICATION DATA 120 DAYS AFTER CONTRACT AWARD LT
REVIEW (APPROVAL/DISAPPROVAL) MUST BE ACCOMPLISHED WITHIN 90 DAYS FROM DATE OF RECEIPT.
FIRST ARTICLE TEST REPORT (FAT) 180 DAYS AFTER APPROVAL OF PR LT
REVIEW (APPROVAL/DISAPPROVAL) OF FAT REPORT 60 DAYS AFTER RECEIPT.
Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification Data CDRLs will be 6 working days after receipt of Certification DD 1423 CDRLs.
Final delivery of material will be on or before 470 days after the effective date of the contract.
4. This solicitation requires First Article Testing. See FAR 52.209-3 First Article Approval - Contractor Testing.
5. Any contract awarded as a result of this solicitation will be "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS).
6. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers in accordance with FAR 13.106(a)(2) and
DFARS 252.213-7000.
7. Drawings associated with this solicitation will be made available at http://sam.gov/content/home.
Drawings have restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request.
8. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related tothe instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile,
or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein."
\
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.2.2 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.2.3 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
DRAWING DATA=EB-3991 |96169| C|SP |D|0001 | C|49998|0261860
DRAWING DATA=EB-3991 |96169| C|SP |D|0002 | C|49998|0117163
DRAWING DATA=EB-3991 |96169| C|SP |D|0003 | C|49998|0216126
DRAWING DATA=EB-3991 |96169| C|SP |D|0004 | C|49998|0236379
DRAWING DATA=EB-3991 |96169| C|SP |D|0005 | C|49998|0222447
DRAWING DATA=EB-3991 |96169| C|SP |D|0006 | C|49998|0211548
DRAWING DATA=EB-3991 |96169| C|SP |D|0009 | C|49998|0244791
DRAWING DATA=EB-3991 |96169| C|SP |D|0010 | C|49998|0235107
DRAWING DATA=EB-3991 |96169| C|SP |D|0011 | C|49998|0231668
DRAWING DATA=EB-3991 |96169| C|SP |D|0012 | C|49998|0253354
DRAWING DATA=EB-3991 |96169| C|SP |D|0013 | C|49998|0244992
DRAWING DATA=EB-3991 |96169| C|SP |D|0014 | C|49998|0278514
DRAWING DATA=EB-3991 |96169| C|SP |D|0015 | C|49998|0219208
DRAWING DATA=EB-3991 |96169| C|SP |D|0016 | C|49998|0139130
DRAWING DATA=EB-3991 |96169| C|SP |D|0017 | C|49998|0228664
DRAWING DATA=EB-3991 |96169| C|SP |D|0018 | C|49998|0228602
DRAWING DATA=EB-3991 |96169| C|SP |D|0019 | C|49998|0234531
DRAWING DATA=EB-3991 |96169| C|SP |D|0020 | C|49998|0221401
DRAWING DATA=EB-3991 |96169| C|SP |D|0021 | C|49998|0213588
DRAWING DATA=EB-3991 |96169| C|SP |D|0022 | C|49998|0183493
DRAWING DATA=EB-3991 |96169| C|SP |D|0023 | C|49998|0238656
DRAWING DATA=EB-3991 |96169| C|SP |D|0024 | C|49998|0213599
DRAWING DATA=EB-3991 |96169| C|SP |D|0025 | C|49998|0248736
DRAWING DATA=EB-3991 |96169| C|SP |D|0026 | C|49998|0231851
DRAWING DATA=EB-3991 |96169| C|SP |D|0027 | C|49998|0243361
DRAWING DATA=EB-3991 |96169| C|SP |D|0028 | C|49998|0284872
DRAWING DATA=EB-3991 |96169| C|SP |D|0029 | C|49998|0300706
DRAWING DATA=EB-3991 |96169| C|SP |D|0030 | C|49998|0397553
DRAWING DATA=EB-3991 |96169| C|SP |D|0031 | C|49998|0280396
DRAWING DATA=EB-3991 |96169| C|SP |D|0032 | C|49998|0332598
DRAWING DATA=EB-3991 |96169| C|SP |D|0033 | C|49998|0375433
DRAWING DATA=EB-3991 |96169| C|SP |D|0034 | C|49998|0263097
DRAWING DATA=EB-3991 |96169| C|SP |D|0035 | C|49998|0345331
DRAWING DATA=EB-3991 |96169| C|SP |D|0036 | C|49998|0218847
DRAWING DATA=EB-3991 |96169| C|SP |D|0037 | C|49998|0290023
DRAWING DATA=EB-3991 |96169| C|SP |D|0038 | C|49998|0342143
DRAWING DATA=EB-3991 |96169| C|SP |D|0039 | C|49998|0346559
DRAWING DATA=EB-3991 |96169| C|SP |D|0040 | C|49998|0382786
DRAWING DATA=EB-3991 |96169| C|SP |D|0041 | C|49998|0323658
DRAWING DATA=EB-3991 |96169| C|SP |D|0042 | C|49998|0321931
DRAWING DATA=EB-3991 |96169| C|SP |D|0043 | C|49998|0335092
DRAWING DATA=EB-3991 |96169| C|SP |D|0044 | C|49998|0285452
DRAWING DATA=EB-3991 |96169| C|SP |D|0045 | C|49998|0278764
DRAWING DATA=EB-3991 |96169| C|SP |D|0046 | C|49998|0258464
DRAWING DATA=EB-3991 |96169| C|SP |D|0047 | C|49998|0297832
DRAWING DATA=EB-3991 |96169| C|SP |D|0048 | C|49998|0222522
DRAWING DATA=EB-3991 |96169| C|SP |D|0049 | C|49998|0211613
DRAWING DATA=EB-3991 |96169| C|SP |D|0050 | C|49998|0290295
DRAWING DATA=EB-3991 |96169| C|SP |D|0051 | C|49998|0382048
DRAWING DATA=EB-3991 |96169| C|SP |D|0052 | C|49998|0237921
DRAWING DATA=EB-3991 |96169| C|SP |D|0053 | C|49998|0203918
DRAWING DATA=EB-3991 |96169| C|SP |D|0054 | C|49998|0177005
DRAWING DATA=EB-3991 |96169| C|SP |D|0055 | C|49998|0176391
DRAWING DATA=EB-3991 |96169| C|SP |D|0056 | C|49998|0297725
DRAWING DATA=EB-3991 |96169| C|SP |D|0057 | C|49998|0339255
DRAWING DATA=EB-3991 |96169| C|SP |D|0058 | C|49998|0229396
DRAWING DATA=EB-3991 |96169| C|SP |D|0059 | C|49998|0268806
DRAWING DATA=EB-3991 |96169| C|SP |D|0060 | C|49998|0252660
DRAWING DATA=EB-3991 |96169| C|SP |D|0061 | C|49998|0219116
DRAWING DATA=EB-3991 |96169| C|SP |D|0062 | C|49998|0286253
DRAWING DATA=EB-3991 |96169| C|SP |D|0063 | C|49998|0296344
DRAWING DATA=EB-3991 |96169| C|SP |D|0064 | C|49998|0349922
DRAWING DATA=EB-3991 |96169| C|SP |D|0065 | C|49998|0213332
DRAWING DATA=EB-3991 |96169| C|SP |D|0066 | C|49998|0260357
DRAWING DATA=EB-3991 |96169| C|SP |D|0067 | C|49998|0220952
DRAWING DATA=EB-3991 |96169| C|SP |D|0068 | C|49998|0252540
DRAWING DATA=EB-3991 |96169| C|SP |D|0069 | C|49998|0267004
DRAWING DATA=EB-3991 |96169| C|SP |D|0070 | C|49998|0326376
DRAWING DATA=EB-3991 |96169| C|SP |D|0071 | C|49998|0362096
DRAWING DATA=EB-3991 |96169| C|SP |D|0072 | C|49998|0308513
DRAWING DATA=EB-3991 |96169| C|SP |D|0073 | C|49998|0299523
DRAWING DATA=EB-3991 |96169| C|SP |D|0074 | C|49998|0247509
DRAWING DATA=EB-3991 |96169| C|SP |D|0075 | C|49998|0261313
DRAWING DATA=EB-3991 |96169| C|SP |D|0076 | C|49998|0228790
DRAWING DATA=EB-3991 |96169| C|SP |D|0077 | C|49998|0339237
DRAWING DATA=EB-3991 |96169| C|SP |D|0078 | C|49998|0294838
DRAWING DATA=EB-3991 |96169| C|SP |D|0079 | C|49998|0267230
DRAWING DATA=EB-3991 |96169| C|SP |D|0080 | C|49998|0369029
DRAWING DATA=EB-3991 |96169| C|SP |D|0081 | C|49998|0368541
DRAWING DATA=EB-3991 |96169| C|SP |D|0082 | C|49998|0302997
DRAWING DATA=EB-3991 |96169| C|SP |D|0083 | C|49998|0323838
DRAWING DATA=EB-3991 |96169| C|SP |D|0084 | C|49998|0305619
DRAWING DATA=EB-3991 |96169| C|SP |D|0085 | C|49998|0283099
DRAWING DATA=EB-3991 |96169| C|SP |D|0086 | C|49998|0182404
DRAWING DATA=EB-3991 |96169| C|SP |D|0087 | C|49998|0280038
DRAWING DATA=EB-3991 |96169| C|SP |D|0088 | C|49998|0330963
DRAWING DATA=EB-3991 |96169| C|SP |D|0089 | C|49998|0237507
DRAWING DATA=EB-3991 |96169| C|SP |D|0090 | C|49998|0447276
DRAWING DATA=EB-3991 |96169| C|SP |D|0091 | C|49998|0477051
DRAWING DATA=EB-3991 |96169| C|SP |D|0092 | C|49998|0287578
DRAWING DATA=EB-3991 |96169| C|SP |D|0093 | C|49998|0280087
DRAWING DATA=EB-3991 |96169| C|SP |D|0094 | C|49998|0340218
DRAWING DATA=EB-3991 |96169| C|SP |D|0095 | C|49998|0334692
DRAWING DATA=EB-3991 |96169| C|SP |D|0096 | C|49998|0162199
DRAWING DATA=6337554 |53711| B| |A|0001 | B|49998|9999999
DRAWING DATA=6658973 |50225| A| |D|0001 | A|49998|3040801
DRAWING DATA=6984846 |53711| E| |D|0001 | E|49998|3147371
DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | |
DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01|
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| |
DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|A| |01|
DOCUMENT REF DATA=ASME B46.1 | | | |090101|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=A-A-59004 | | |B |181118|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |
3. REQUIREMENTS
3.1 ;The Penetrator Assembly shall be made in accordance with NAVSEA drawing 6984846 Part No. 026 and NAVSEA drawing 6337554, except as amplified or modified herein.;
3.2 ;In paragraph 4.3.2 of NAVSEA Drawing 6337554, ANSI B64.1 is incorrectly referenced. The correct specification is ASME B46.1.
In paragraph 4.3.4 of NAVSEA Drawing 6337554, there is a typo regarding the type of penetrant to be used. Type II is to be used vice Type III.;
3.2.1 ;The penetrator body keyways shown on drawing 6337554 sheet 8.1.3S4 View C-C shall be machined at 154 degrees to accept the Glenair conduit in lieu of the depicted 180 degree.;
3.2.2 ;The part number to mark on the penetrator nut, item no. 1 in Section 8.3.2 of drawing 6337554 is "PPD 802-6337554-8.3.2" in lieu of the part number "PPD 802-6337554-8.3.1" indicated in Note 3 of drawing 6337554 sheet 8.3.2S1.;
3.2.3 ;The proof pressure cap, item number 34 on NAVSEA PPD 802-6337554, must be marked in accordance with PPD 802-6337554-8.9.2 Note 4 regardless if made in accordance with 802-6337554-8.9.2 Note 5.;
3.3 ;Drawing 6658973 requirements apply only to the extent invoked by drawing 6337554. Otherwise, the requirements of drawing 6337554 apply.;
3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;Penetrator body, item no. 1, penetrator cover, item no. 6, in section 8.1.3, washer, in Section 8.2.2 and penetrator nut, item no. 1 in Section 8.3.2 of drawing 6337554.;
Material - ;QQ-N-286 as specified by paragraph 3.1.1 of drawing 6337554;
Part - ;Receptacle body, item no. 8 in Section 8.1.3 of drawing 6337554;
Material - ;QQ-N-281 as specified by paragraph 3.1.2 of drawing 6337554;
3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - Quality Conformance/Compliance Inspection
Item - ;Each Penetrator Assembly;
Performance - ;Drawing 6337554 Table 4-1;
Acceptance - ;Drawing 6337554 Table 4-1;
Attribute - Annealing and Age Hardening
Item - ;Each penetrator body, cover, nut and washer;
Performance - QQ-N-286
Test - Ultrasonic Inspection on Starting Material
Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract;
Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286
Acceptance - QQ-N-286
Test - ;Dye Penetrant Inspection or Magnetic particle (Wet Method) Inspection;
Item - ;Each penetrator body, cover, nut, receptacle body and washer;
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - 5x Visual Magnification or Dye Penetrant Inspection (root layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
Test - Visual and Dye Penetrant Inspection (final layer)
Item - Weldments
Performance - T9074-AS-GIB-010/271
Acceptance - MIL-STD-2035
3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the
following must be used:
For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG.
For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.
30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.
The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in
this contract, the following must be used:
For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.
For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.
For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes.
3.7 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company
Attn: Bill Bolenr
3200 Riverside Drive
Huntington, WV 257059
Phone: (304) 526-5889
FAX: (304) 526-5973
Metallurgical Consultants, Inc.
Attn: W. M. Buehler
4820 Caroline
PO Box 88046
Houston, TX 77288-0046
Phone: (713) 526-6351
FAX: (713) 526-2964
Naval Surface Warfare Center, Carderock Division
Attn: Eric Focht Code 614
9500 Macarthur Blvd
West Bethesda, MD 20817-5700
Phone: (301) 227-5032
FAX: (301) 227-5576
Teledyne Allvac
Attn: Dr. W. D. Cao
2020 Ashcraft Ave.
Monroe, NC 28110
Phone: (704) 289-4511
FAX: (704) 289-4269
Westmoreland Mechanical Testing and Research Inc.
Attn: Andrew Wisniewski
P.O. Box 388
Youngstown, PA 15696-0388
Mannesmann Rohrenwerke
Mannesmann Forschungsinstitut (MFI)
Attn: Dr. Weiss
Postfach 251160
47251 Duisburg
Germany
Phone: 011-49-0203-9993194
FAX: 011-49-0203-9994415
ThyssenKrupp VDM USA, Inc.
Attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
Houston, TX 77065-4939
Phone: (281) 955-6683
3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent
inspection in accordance with ASME B1 series is acceptable.
3.8.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.
3.8.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22
of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.
3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.
3.9 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.
3.10 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.
3.11 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the
fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly.
3.12 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production
welding and brazing. Repair welding is not permitted ;on the penetrator body, cover, nut or washer; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.13 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.14 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.14.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide
a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.14.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.14.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.15 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.16 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.16.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.18 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.18.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.18.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.18.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.18.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly
notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.18.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.19 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.19.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices and for verification of their accuracy and condition.
3.19.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.20 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.20.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.20.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.20.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.20.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be
established. Records of this effort must be available for review by the government.
3.20.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.21 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.21.1 Visual examination upon receipt to detect damage during transit.
3.21.2 Inspection for completeness and proper type.
3.21.3 Verification of material quality received.
3.21.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.21.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.21.6 Identification and protection from improper use or disposition.
3.21.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.21.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.21.9 Material returned to the contractor must be handled as GFM.
3.22 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.22.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order.
3.23 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must
provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of
operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component.
3.23.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.23.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.23.3 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the assembly identifying the part
number, piece number, traceability number, and the location of the permanent mark.
3.23.4 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ; ;
3.24 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply:
3.24.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the
material supplied.
3.24.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or
mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used
during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material
must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered,
the original certification forchemical composition must be overstamped and annotated with the unique traceability material and at a minimum contain the information below.
TRACEABILITY MARKING ________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER ______________ AND HEAT TREAT NUMBER _____________________
(when applicable)
_________________________________________ DATE _____________________
(name and signature of auth. co. rep.)
3.24.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.24.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.24.5 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.25 Material Handling - The written material control process must include the following:
3.25.1 All raw materials must have traceability markings (except as specified below).
3.25.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.25.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.25.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.25.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.25.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking
location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.26 Receiving inspection -
3.26.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to
another location.
3.26.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.27 Discrepancy reporting -
3.27.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to
the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR).
3.28 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance.
3.28.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military
specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code),
table IIA (for sample size).
SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot.
3.28.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the
Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above.
3.28.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification
test reports must also be 100% inspected for completeness and legibility.
3.28.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible.
3.29 See CDRLs DI-MISC-80875 (welding procedures) and DI-MISC-80876 (weld procedure qualification data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In
addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.29.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.29.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted,
citing the drawing number and pieces to be welded. (i.e. "WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC." WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.")
3.29.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and
the contract.
3.29.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including
size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure
Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.29.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.29.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted
as part of the qualification data.
3.29.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential
elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.29.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.29.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.
3.29.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.
3.29.11 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.29.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.30 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor must conduct ;non-destructive; First Article Test/Inspection on ;one; unit(s) in accordance with requirements ;of drawing 6337554 Table 4-1; .
3.31 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information:
1. Contractor's name, address and date.
2. The contract/purchase order number (for example: N00104-11-P-FA12)
3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC
(for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable).
4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable).
5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable).
6. Manufacturer's compound number ("N/A" when Not Applicable).
7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable).
8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed
satisfactorily.
9. Contractor's or authorized personnel's signature.
4. QUALITY ASSURANCE
4.1 Notes to DCMA QAR and the Contractor -
4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a
disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition.
4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A
record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO.
4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements.
4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders.
4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at:
https://register.nslc.navy.mil/
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item.
6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD
(Contract Support Document) Library within ECDS.
6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the
ship, or unacceptable risk of personal injury or loss of life.
6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a
critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation).
6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements.
6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's
commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program.
6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the
Contracting Agency as important, are observed and evaluated.
6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government
representative prior to shipment.
6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied
conforms to the specified requirements.
6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits,
center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order.
6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated.
6.1.11 Verification - An examination performed to determine compliance with a specific requirement.
6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following:
- The requirements of this contract/purchase order.
- Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.).
- Contractually invoked federal, military, or commercial specifications and/or standards.
- Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government.
6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is
or after repair by an approved method.
6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of
time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method.
6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety.
6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts
- Health or Safety
- Effective Use or Operation
- Weight, Stability, or Structural Integrity
- System design parameters as schematics, flows, pressures or temperatures
- Compartment arrangements or assigned function
6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major.
6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item.
6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval.
6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification.
6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order.
6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information
contained on those documents and drawings.
6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:
A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only.
C... distribution authorized to US Government agencies and t

Opportunity closing date
09 September 2024
Value of contract
to be confirmed

About the buyer

Address
NAVSUP WEAPON SYSTEMS SUPPORT MECH

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?