Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
TIME OF DELIVERY (JUNE 1997)|20|subCLIN 0001AA|Nine (9)|600||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Combo Invoice & Receiving Report||TBD|N00104|TBD|TBD|See Schedule|TBD|||TBD||||See form DD1423||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
EQUAL OPPORTUNITY (SEP 2016)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4|||||
SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023))|9||||||||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7||||||||
LIST OF AWARD ATTACHMENTS|5||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333914|750||||||||||||
TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. This is an Advanced Equipment Repair Program (AERP) sole source repair requirement.
2. Please provide a Firm-Fixed Price (FFP) qualifying proposal for the full repair effort of the requirement. Please include the cost of new or estimated cost of new with the submitted proposal.
3. In repair price, include all costs associated with receipt and complete repair of the material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV Reporting. Also provide the following information:
1. Teardown & Evaluation Rate:
2. Repair Turn Around Time (RTAT):
3. Throughput Constraint:
4. Induction Expiration Date:
4. Repair Turn Around Time (RTAT) the resultant contractual delivery requiremeent is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition
asset at the contractors facility as reflected in the AAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract.
1. Requested RTAT: 600 Days
2. Proposals shall reference the proposed RTAT and any capacity constraints.
5. Price Reductions Any asset for which the contractor does not meet the requiired RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a Reduction Modification at the end of contract performance. Price reductions
made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Governments right to terminate for default.
6. If requirement will be packaged at a location different from the Offerors adddress, the Offeror shall provide the Company Name, Street Address and CAGE of the Packaging Facility.
7. If the Offeror is not the Original End Manufacturer(OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the Offeror must be able to provide a signed letter of authorization to perform repairs from the OEM on
the companys letterhead.
8. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be issued by the Government when copies are either deposited in the mail,l, transmitted by
facsimile, or sent by other electronic commerce method such as email. The Governments acceptance of the contractors proposal constitutes bililateral agreement to issue contractual documents as detailed herein.
9. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract.
10. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
11. Offerors must have a valid U.S. Security Clearance of CONFIDENTIAL or higher in order to respond to this RFP N0010425RZA07, because the RFQ N0010425RZA07 includes an annex classified at the CONFIDENTIAL level which will be released only to offerors possessing
the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NSPOM)(DoD 5220-22-M) and Industrial Security Regulation (DoD 5220.22-R).
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the PUMP, CENTRIFUGAL .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;Cage 53711 Drawing 6984058 Rev A, Warren Drawing 51-A-28005 and NAVSEA
S6226-P8-MMA-010, all Confidential.;
DRAWING DATA=EB-5337 |96169| B| |D|0001 | B|00026|0000000
DRAWING DATA=6984058 |53711| A| |D|0001 | A|00026|0000000
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;63857; , drawing ;998F3489; ,and the applicable SUBMEPP Repair Instruction ;5080-012-0654 REV -Chg. 3, (CSD551); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD551, CSD458 AND CSD511; in ECDS at https://register.nslc.navy.mil/
3.3 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;Cage 53711, drawing 6984058 rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to
mark the working pressure on the item does not apply and is strictly prohibited.
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
- Opportunity closing date
- 25 November 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- NAVSUP WEAPON SYSTEMS SUPPORT MECH
Bid for tender
If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.
This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.
Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.