United States - 43--compressor, in repair/modification OF
For more information and to make a bid you will need to go to the third party website.
Details
Provided by- Opportunity closing date
- 13 February 2025
- Opportunity publication date
- 14 January 2025
- Value of contract
- to be confirmed
- Your guide to exporting
Description
CONTACT INFORMATION|4|N742.4|WR4|(717) 605-7562|amanda.a.gowdy.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION/ACCEPTANCE POINT|6|||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice & Receiving Report (COMBO)|N/A|TBD|N00104|TBD|TBD|SW3215|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|Not applicable |
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|Weapon Systems Support (WSS)|
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery |one year from date of delivery |||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|13|333914|750 (# of employees)||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. This is an Advanced Equipment Repair Program (AERP) requirement.
2. The resultant award of this solicitation shall be issued bilaterally,requiring the contractor's written acceptance prior to execution.
3. The resultant award of this solicitation will utilize Commercial AssetVisibility (CAV). Please see NAVSUPWSSFA24 for more details.
4. The following proposed delivery schedule applies:
Final delivery of material shall be on or before 999 days after the effectivedate of the resulting award.
5. All transportation to/from the repair site will be paid for by the US Navy.
6. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF).
7. Any contract/order awarded as a result of this solicitation will be a "DO"rated order certified for national defense use under the Defense Priorities
and Allocations System (DPAS). See 52.211-14, Notice of Priority Rating forNational Defense, Emergency Preparedness, and Energy Program Use.
8. Quote is to be submitted as a firm-fixed price for the full repair effort of the requirement.
9. Include in the firm-fixed repair price all costs associated with receipt and complete repair of material that may be in unwhole condition,missing hardware, damaged, handling damage, missing parts, wear damage, and
CAV reporting. Also, please provide the following:
a. RTAT:
b. Throughput Constraint:
c. Induction Expiration Date:
A cost of new price shall also be provided in addition to the repair price.
Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset
at the Contractors facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the Contractor is required toaccurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt. The Contractor must obtain final
inspection and acceptance by the Government for all assets within the RTATs
established in this contract.
Requested RTAT: 999 Days
Offers shall reference the proposed RTAT and any capacity constraints.
PRICE REDUCTIONS
Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. This adjustment will be implemented via areduction modification at the end of contract performance. Price reductionsmade pursuant to this section
shall not limit other remedies available to theGovernment for failure to meet required RTATs, including but not limited to
the Government's rights to terminate for default.
RECONCILIATION
A reconciliation modification will be issued after final inspection and acceptance of all assets included under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the
Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. The resultant award of this solicitation will be issued bilaterally,
requiring the contractor's written acceptance prior to execution.
The Contractor must obtain final inspection and acceptance by the Government
for all assets within the RTATs established in this contract.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the COMPRESSOR .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;28953; , drawing ;D3084; ,and the applicable SUBMEPP Repair Instruction ;R.I. 5515-012-1126 Rev D Chg 3 (CSD479); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD479, CSD474, CSD475, CSD476, CSD477 and CSD478; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
- Opportunity closing date
- 13 February 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- NAVSUP WEAPON SYSTEMS SUPPORT MECH
Bid for tender
If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.
This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.
Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.