Canada - 2024-PW-23 - Fire Station #1 Replacement, Design, Engineering and Construction Liaison Services

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
23 December 2024
Opportunity publication date
25 November 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

online submission ONLYPurpose of the ProjectFire Station 1, located at 177 Highway 20 W, a 30-year-old facility, located in Pelham that the Fire Department has outgrown. Fire Station 1, as it exists today, was substantially completed in 1982, however the grand opening was held on March 5, 1983, to coincide with the 60th anniversary of the Fire Department in Fonthill.The 42-year-old Fire Station is approximately 790m2 (8,500ft2) in area. The building contains a garage area utilized for firefighting apparatus and bunker gear storage, training room/banquet hall, offices, storage areas, a lounge, 2 washrooms containing a small shower in each, and a kitchen. Neither of the washrooms are accessible for those with mobility impairments, nor do they provide privacy for the volunteer fire fighters to shower or change. Fire Station 1 is the headquarters for 40 volunteers and provides office space for 6 full time employees including Fire Services and By-law staff. In 2023, volunteers from Fire Station 1 responded to 327 calls for emergency service.A replacement Facility is required as it is undersized for its intended use and requires significant capital investment for repairs. The existing property is 0.56 ha in size, and has a Niagara Region owned EMS facility and elevated water tower behind it to the north. Therefore, the Right-of-Way will have to be open and maintained for access throughout. The current location of Fire Station 1 has been determined as being the prime location, and therefore the new facility is to be constructed in the same location. Given that Fire Station 1 is the only station that serves Fonthill, it is to remain operational during construction. The purpose of this assignment is to partner with the successful proponent to undertake the design of the new facility, generate engineering drawings and details, and provide construction liaison services for the replacement of the new Fire Station 1 Facility, complete with a detailed design including site plan and floor plans, and a Class A cost estimate for the construction of the facility. The design and engineering component should consider all accessibility standards (AODA), regulations, staff accommodations, and equipment accommodations. Interviews with Fire & Protection Services and Public Works to take place early in the study to ensure the successful proponent has a full understanding of the requirements of the project.It is intended that this building is to be designed and specified in such a way that they can withstand abuse with minimal repair and maintenance. Careful selection of materials will be required to achieve this goal. A balanced approach has been taken to ensure energy efficiency, building longevity and cost-effective construction methods and materials are utilized.The new Fire Station Facility is anticipated to be approximately 13,000 square feet, including approximately 6,500 square feet of truck bay space, consisting of Five bays, (2 drive-through bays) to accommodate Four (4) apparatus including a Front-line Engines, Tankers, and Rescue vehicles. Additionally, the design will include office and meeting space, a fully serviced commercial kitchen and lounge, fitness room, storage area, and decontamination facilities.  Further, the overall site improvements shall account for; site servicing (water, sewer, etc.), storm-water management, grading plan, parking requirements, landscaping of affected lands, and overall public access to the site. The design also requires the building to function as a Post Disaster Building and an Emergency Operations Center (EOC). Although LEED certification is not a requirement, the latest technologies in building efficiency and sustainable design are requested.  Life cycle costing and environmental impact of the completed facility will be analyzed throughout design.

Opportunity closing date
23 December 2024
Value of contract
to be confirmed

About the buyer

Address
Town of Pelham

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?