United States - 20--gland,actuator

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 February 2025
Opportunity publication date
10 January 2025
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

CONTACT INFORMATION|4|N742.18|ER4|N/A|ELIZABETH.M.CLAMMER.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C AND SECTION E.|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
PRODUCTION LOT TESTING|1|30 DAYS|
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|2|356 DAYS|CLIN 0001AB|1|356 DAYS||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|STAND-ALONE RECEIVING REPORT - CERTIFICATIONS; COMBO - RECEIVING REPORT & INVOICE - MATERIAL|N/A|TBD|N00104|TBD|TBD|W25G1U & W62G2T|TBD|N/A|N/A|N/A|N/A|N/A|N/A|SEE FORM DD1423.|1-866-618-5988 - WAWF HELPDESK|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR FROM DATE OF DELIVERY.|ONE YEAR FROM DATE OF DELIVERY.|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|ONE (1)|CLIN 0001AA|30 DAYS|TBD|LIZZ CLAMMER - ELIZABETH.M.CLAMMER.CIV@US.NAVY.MIL|TBD|CLIN 0001AA|TBD|||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||X||||||||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|336612|1,000||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|
EVALUATION OF FIRST ARTICLE TESTING|3|||X|
1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF).
2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility.
5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy
Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order.
6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation.
7. This solicitation requires First Article Testing (FAT). See FAR 52.209-3 First Article Approval - Contractor Testing for more details.
1. SCOPE
1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;Gland Actuator; for use on Navy submarines.;
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents.
2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,
however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
DRAWING DATA=4398602 |53711| C| |D|0001 | C|49998|2016142
DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01|
DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A|2 | |
DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03|
DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | |
DOCUMENT REF DATA=ISO 9001 | | | |150915|A| | |
DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | |
DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A|1 | |
DOCUMENT REF DATA=MS28782 | | |E |101109|A| | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | |
DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | |
DOCUMENT REF DATA=MIL-PRF-25732E | | | |240308|A| | |
DOCUMENT REF DATA=FED-STD-H28/20B | | | |941221|A| |01|
DOCUMENT REF DATA=ASTM-B150/B150M | | | |190401|A| | |
DOCUMENT REF DATA=ASME B46.1-2019 | | |A | |A| | |
DOCUMENT REF DATA=EIA-649C-2/19 | | | | |A| | |
DOCUMENT REF DATA=SAE-AS8791D-01/20 | | | | |A| | |
DOCUMENT REF DATA=SAE-AS28775A-12/08 | | | | |A| | |
DOCUMENT CHANGE DATA=MIL-B-24059 |QQ-C-465A
DOCUMENT CHANGE DATA=MIL-B-857A |MIL-S-1222H
DOCUMENT CHANGE DATA=MIL-F-18240E |MIL-DTL-18240F
DOCUMENT CHANGE DATA=MIL-P-116J |MIL-STD-2073-1E
DOCUMENT CHANGE DATA=MIL-R-8791D |SAE-AS8791-2014
DOCUMENT CHANGE DATA=MIL-S-1222H |MIL-DTL-1222J
DOCUMENT CHANGE DATA=MS28775E |SAE-AS28775-2008
DOCUMENT CHANGE DATA=QQ-C-465A |ASTM-B150/B150M-2019
3. REQUIREMENTS
3.1 ;Design and Manufacturing - The ;Gland Actuator; furnished under this contract/ purchase order shall meet the material, mechanical and physical requirements as specified on Drawing 4398602, Item Number 110 (consisting of Item Numbers 69, 70, 111, 112,
114 thru 119) including associated specifications mentioned in this procurement. ;
3.1.1 ;The ;Gland Actuator; shall be manufactured from Nickel-Aluminum-Bronze material per specification ASTM B150/B150M due to MIL-B-24059 and QQ-C465 have been cancelled.;
3.1.2 ;The Screw (Item No. 114 of drawing 4398602) shall be a Type I - Hex Cap per MIL-DTL-1222 instead of a Type III stated on the drawing.;
3.1.3 ;The supplier shall disregard Style C listed for Item No. 115 on drawing 4398602.;
3.1.4 ;Qualified Products List - The O-Rings (Item Numbers 69 and 111 of drawing 4398602/MIL-PRF-25732) and MIL-DTL-18240 Locking Element (Item 114) furnished under this order shall be in accordance with the drawing, specification and shall be products which
are qualified on the applicable qualified products list (QPL).;
3.2 ;Marking Requirements - The supplier shall permanently mark and identify ;tag or bag; the first article and each production lot unit ;Gland Actuator; in accordance with Notes 5 and 15 of Drawing 4398602 per MIL-STD-130 and shall ;tag or bag; with
contract, heat and serial number.;
3.2.1 ;The supplier shall permanently mark and identify each Screw (Item No. 114) and Stud (Item No. 115) of drawing 4398602 with material symbol, manufacture's symbol and lot number in accordance with MIL-DTL-1222 requirements.;
3.3 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/ inspection procedure and approval are required for the ;Gland Actuator;. Government approval is required prior to commencement of first article unit.;
3.4 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.j.ogilvie.civ@us.navy.mil, Code 242MO after award of contract.;
3.4.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.;
3.5 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,
Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original
and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.5.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until
another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,
the date of the granting of the authorization, and the name of the granting authority.
Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.
The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.
Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.
3.6 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material
will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The
contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting
Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of
contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are
located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a
polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the
requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a
component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface
ship atmosphere.
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any
inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance
does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.
4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the
Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract.
CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ;
4.5 ;Surface Roughness - All surface finishes are in RMS measurements. Where the degree of surface roughness is indicated, the surface shall be free from all visible imperfections as defined by Standard ASME B46.1.;
4.6 ;Finished Edges - Finished edges shall be in accordance with the applicable drawing requirements.;
4.7 ;Threads - Threads shall be inspected in accordance with FED-STD-H28/20 System 22 for Items 114 & 115, all other threads shall be inspected using FED-STD-H28/20 System 21 requirements. Thread inspection shall include the measurement and recording of the
major diameter for external threads and the minor diameter for internal threads.;
4.8 ;Material Control - The supplier shall have an effective material control system that provides for certified quantitative mill or industrial laboratory reports of chemical and physical analysis by heat, lot or batch for raw material ordered for first
article and production units. If the material is subsequently heat-treated a certification of physical analysis, after heat treatment is also required for each heat lot or batch. Also, where the applicable material specification calls out (e.g., corrosion
resistance test, macro-etch test) these test results shall also be reported on the applicable mill or industrial laboratory report. (1) The physical analysis shall establish the following properties for metallic parts: Mechanical Properties Ultimate Tensile
Strength, Yield Strength and Elongation including Susceptibility to Intergranular Cracking (Slow Strain Rate Tensile Test) and Hardness per QQ-N-286G for Item Number 115. ;
4.9 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;Gland Actuator; in accordance with the applicable drawing and specifications, and their approved first article procedure.;
4.9.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an
NSWCPD representative has the option of being present during the first article testing/inspection.;
4.9.2 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/ Inspection). The supplier shall prepare and submit their First Article Testing/Inspection Procedure ;Gland Actuator; in accordance with the requirements of
DI-NDTI-80603, applicable drawing and specifications as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit.
CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A;
4.9.3 ;First Article Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% the first article unit ;Gland Actuator; and record the actual measurements of each dimension and threads (including the major diameter for external
threads and the minor diameter for internal threads) identified on the applicable drawing. Threads shall be inspected 100% and results recorded.;
4.9.4 ;First Article Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the first article unit ;Gland Actuator; testing/inspection reports in compliance with the requirements of DI-NDTI-80603, applicable
drawing and specifications.The report shall also include a copy of;Certified Mill Certification; Heat Treatment Certification(as applicable);Certified Mechanical Properties Test Certification; Certificate of Conformance for Materials; Certificate of Compliance
for Materials; Visual/Dimensional Inspection Report; NDT Visual/ Liquid Penetrant Inspection Testing Report and NDT Visual/Liquid Penetrant Inspector Qualification Certification; identified in the Objective Quality Evidence Records Section of this document, and
as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units.
CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B;
4.10 ;Production Lot.;
4.10.1 ;Visual/Dimensional Inspection - The supplier shall visually and physically inspect 100% the production lot units ;Gland Actuator; and record the actual measurements of each dimension and threads (including the major diameter for external threads and
the minor diameter for internal threads) identified on the applicable drawings. Threads shall be inspected 100% and results recorded.;
4.10.2 ;Finished Screw and Stud Inspection/Testing (Nondestructive and Destructive): a. The supplier shall visually and physically (nondestructive) inspect 100% the production lot units and record the actual measurements of each dimension andfeature
including threads (also the major diameter for external threads)identified on Drawing 4398602 for Item Numbers 114 (Screw) and 115 (Stud). Threads shall be inspected 100% and results recorded.
b. The supplier, on a sample basis per MIL-DTL-1222 (Sampling Plan), shall perform the following Mechanical Properties Testing (destructive and nondestructive) on the sample production lot units in accordance with MIL-DTL-1222 requirements, and record the
actual test measurements for each test.
(1) Item No. 114: Proof Stress or Yield Stress Test and Wedge Tensile Test (Destructive Testing).
(2) Item No. 115: Proof Stress or Yield Stress Test and Axial Tensile Strength Test (Destructive Testing).
(3) Item Nos. 114 and 115: Hardness Test (Nondestructive Testing).
c. The supplier, on a sample basis per MIL-DTL-1222 (Sampling Plan), shall visually inspect and perform liquid penetrant inspection testing (nondestructive) on the sample production lot units (after heat treating as applicable) on Item Numbers 114 (Screw) and
115 (Stud) in accordance with MIL-DTL-1222 and NAVSEA Technical Publication T9074-AS-GIB-010/271 requirements. ;
4.10.3 ;Production Lot Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the completed production units ;Gland Actuator; testing/inspection reports in compliance with the applicable Data Item
Descriptions (DIDs), drawing and specifications. The Production Lot Testing/Inspection report shall consist of ;Certified Mill Certification; Heat Treatment Certification (as applicable); Certified Mechanical Properties Test Certification; Certificate of
Conformance for Materials; Certificate of Compliance for Materials; Visual/ Dimensional Inspection Report; NDT Visual/Liquid Penetrant Inspection Testing Report; NDT Visual/Liquid Penetrant Inspector Qualification Certification and Mercury Exclusion
Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot
testing/inspection report is required prior to shipment of production lot units.
CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B;
4.11 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as
indicated on the Production Lot Testing/ Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ;
4.12 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjunction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal
DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.;
4.13 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of raw material and finished parts. Records shall be traceable by drawing/item, heat, lot or batch, serial and contract number.All OQEDS shall be
clearly legible including name and title.The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.;
4.13.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, heat, lot or listed CDRLs.
a.Certified Quantitative Mill or Industrial Laboratory Certification (chemical and physical analysis) for Item Nos. 110, 114 and 115 of drawing 4398602 including susceptibility to intergranular cracking-slow strain rate tensile test per QQ-N-286G or later for
Item No. 115.
CDRL: CERTIFIED MILL CERTIFICATE per DI-MISC-82386
b.Heat Treatment Certification (finish screws) in accordance with MIL-DTL-1222 requirements for Item No. 115 of drawing 4398602.
CDRL: HEAT TREATMENT CERTIFICATION per DI-MISC-82386
c.Certified Mechanical Properties Test Certification(finished screws and studs)for Item No. 114: Proof Stress or Yield Stress and Wedge Tensile and Item No. 115: Proof Stress or Yield Stress and Axial Tensile Strength (Destructive Testing); and Item Nos. 114
and 115 Hardness (Nondestructive Testing) in accordance with MIL-DTL-1222 requirements.
CDRL: CERTIFIED MECHANICAL PROPERTIES CERTIFICATION per DI-MISC-82386
d. Certificate of Conformance for Materials (certifying drawing 4398602, Item Nos. 69, 70, 111 and 112 to the drawing and applicable specifications requirements including NYLOCK, Configuration A per MIL-DTL-18240 of Note 29 of the drawing for Item No. 114).
CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-82386
e. Certificate of Compliance for Materials (certifying drawing 4398602, Item Nos. 116 thru 119 to the drawing and applicable manufacture part number requirements).
CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386
f. Visual/Dimensional Inspection Reports (Item Nos. 110, 114 and 115) shall show all the characteristics, the actual measurement and results of each dimension inspected including threads (also the minor diameter for internal threads and the major diameter for
external threads), contract number, name of supplier, drawing/item number, drawing revision letter, heat, lot or batch, (material symbol, manufacture's symbol, & lot number applicable to Item Nos. 114 and 115) item nomenclature and inspector's acceptance
signature and date.
CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B
g.NDT Visual/Liquid Penetrant Inspection Testing Report shall be in accordance with MIL-DTL-1222 and NAVSEA Technical Publication T9074-AS-GIB-010/271 requirements for Item Nos. 114 and 115 of drawing 4398602.
CDRL: NDT VISUAL/LIQUID PENETRANT INSPECTION TESTING REPORT
per NAVSEA TECH PUB T9074-AS-GIB-010/271
h. NDT Inspector Qualification Certification of personnel performing visual/liquid penetrant nondestructive inspection testing in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271 for Item Nos. 114 and 115 of drawing 4398602.
CDRL: NDT LIQUID PENETRANT INSPECTOR QUALIFICATION CERTIFICATION per NAVSEA TECH PUB T9074-AS-GIB-010/271
j.Mercury Exclusion Certification (representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-82386;
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)
(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.
A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410P, 101 Strauss Avenue
Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for
certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVICP-MECH
Code 87321
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:
Commanding Officer
NAVICP-MECH
Code 009
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
6.2 ;EIA-649 is authorized to be used in lieu of MIL-STD-973.;

DATE OF FIRST SUBMISSION=ASREQ
;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;;
;;NSWC PD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWC PD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

DATE OF FIRST SUBMISSION=ASREQ
;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;;
;;NSWC PD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWC PD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

DATE OF FIRST SUBMISSION=ASREQ
;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;;
;;NSWC PD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWC PD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

DATE OF FIRST SUBMISSION=ASREQ
;;SUPPLIER FORMAT IS ACCEPTABLE.; ;
;;PLT REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E: CERTIFIED MILL CERTIFICATION; HEAT TREAMENT CERT;CERTIFIED MECH PROPERTIES TESTCERT; CERTIFICATE OF CONFORMANCE;CERTIFICATE OF COMPLIANCE;VISUAL/DIMENSIONAL INSP RPT; NDT VISUAL/LIQUID
PENETRANT INSP TEST RPT; NDT VIS/LIQUID PENETRANT INSPECTOR QUAL CERT AND MERCURY EXCLUSION CERTIFICATION.;;
;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;;
;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

Opportunity closing date
06 February 2025
Value of contract
to be confirmed

About the buyer

Address
NAVSUP WEAPON SYSTEMS SUPPORT MECH

Bid for tender

If your company meets the requirements of the tender, go to the website where the tender is hosted and submit your bid.

This website contains links to other websites that we do not control or maintain. We are not responsible for the content of these sites. We provide these links for your convenience only, and do not necessarily endorse their content.

Before entering into a contract you need to apply for any necessary export licences, which can include applications to trade in certain goods. You should also make your own enquiries and be satisfied by the accuracy of any information supplied to you.

Go to third party website
Is there anything wrong with this page?