Germany - - 143 m² asphalt surfaces removed, restored;- 155 m² unbound surfaces removed, restored;- 156 m drinking water pipe PE d 315 x 28.6 installed in trench;- 30 m drinking water pipe PE d 63 x 5.8 installed in trench;- 34 m pipe ...

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
11 October 2024
Opportunity publication date
23 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

- 143 m² asphalt surfaces removed, restored;- 155 m² unbound surfaces removed, restored;- 156 m drinking water pipe PE d 315 x 28.6 constructed in trench;- 30 m drinking water pipe PE d 63 x 5.8 constructed in trench;- 34 m pipe PE d 560 x 50.8 constructed as protective pipe in trench;- 193 m drinking water pipe PE d 315 x 28.6 constructed using the HDD method;- 97 m PE d 560 x 50.8 pipe as protective pipe in HDD method;- 37 m vitrified clay jacking pipe DN 500 in controlled jacking as jacket pipe (railroad crossing);- 131 m drinking water pipe PE d 315 x 28.6 in PE protective pipe;- 37 m drinking water pipe PE d 315 x 28.6 in vitrified clay protective pipe;- 10 pcs. Construct 10 pressure line junctions;- Construct 1 reinforced concrete sinking shaft DN 3200 as a starting shaft, with conversion to an inspection shaft;- Construct 1 reinforced concrete sinking shaft DN 2500 as a target shaft, with conversion to an inspection shaft;- Carry out 240 m closed lowering of the groundwater level;

Opportunity closing date
11 October 2024
Value of contract
to be confirmed

About the buyer

Address
Wasser- und Abwasserzweckverband Calau

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?